← Back
Two stories - detached, small or mid-size
344A HANOVER AVENUE
STATEN ISLAND · BIN 5169285
💬 Discuss this project
0Year Built
2Stories
A1Building Class
R3AZoning
1,489 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: NCB GROUP, LLC · 2,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 2 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NCB GROUP1507/08/2026
OAKDALE HOLDING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOBUE & VALENZIANO, LLP204/19/2022
A TECH ENGINEERING NYC, PLLC.107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO BUE VALENZIANO AIA403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE'S MECHANIC INCGeneral Contractor407/08/2026
YU HUA CONSTRUCTION CORPGeneral Contractor107/08/2026
DRILON PLBG & HTG INCPlumbing107/08/2026
Building Lifecycle
All (14)Filed (3)Permit Issued (4)Signed Off (3)Inspection (4)
08/25/2025
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00529653-I1
08/25/2025
Signed off — Alteration
S00687875-I1
07/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/11/2025
Permit issued — Plumbing
S00529653-I1-PL
11/05/2022
Signed off — Alteration
S00186147-I1
07/01/2022
Permit issued — Curb Cut
S00687875-I1-CC
04/19/2022
Filed — Alteration
S00687875-I1
07/14/2021
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00529653-I1
06/08/2020
Permit issued — Construction Fence
S00186147-I1-FN
08/08/2019
Permit issued — Construction Fence
S00186147-I1-FN
07/17/2019
Filed — Alteration
S00186147-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC06/11/2025
DOB NOWCurb CutSigned-offYU HUA CONSTRUCTION CORP07/01/2022
DOB NOWConstruction FencePermit IssuedACE'S MECHANIC INC06/08/2020
DOB NOWConstruction FencePermit IssuedACE'S MECHANIC INC08/08/2019
BIS—ISSUEDUPSTRATE INC09/06/2024
BISPLISSUEDCROWN PLUMBING INC02/20/2024
BISPLISSUEDNEW YORK STANDARD MECH CORP09/20/2021
BIS—ISSUEDHIGHLEVEL GROUP INC08/25/2021
BIS—ISSUEDHIGHLEVEL GROUP INC04/16/2021
BIS—ISSUEDHIGHLEVEL GROUP INC04/15/2021
BIS—ISSUEDSPLEN CONSTRUCTION INC04/13/2021
BIS—ISSUEDJ. SMITH CONSTRUCTION INC.09/24/2019
1 project · most recent 06/08/2021
General Wiring
FiledStatusContractorScope
06/08/2021CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/25/2026S00529653-I1Request digital key ↗
08/24/2026S00687875-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00186147-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
09/06/2024520339722Open ↗
02/21/2024520339722Open ↗
09/20/2021520339722Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
08/28/2025520339722Open ↗
08/25/2025520339722Open ↗
01/03/2024520339722Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/30/2022520339722Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
04/08/2021520339722Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/09/2019520339722Open ↗
▸BISVERIFY TAX LOT1
03/29/2023520339722Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/29/2023520339722Open ↗
▸BISZONING DIAGRAM1
01/09/2019520339722Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/30/2018520339722Open ↗
11/30/2018520339722Open ↗
11/30/2018520339722Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026S00186147-I1Open ↗
08/25/2026S00529653-I1Open ↗
08/24/2026S00687875-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/30/2018520339722Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/30/2018520339722Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING1
08/25/2025520339722Open ↗
▸BISGAS CUT-OFF1
09/25/2019520350977Open ↗
▸BISWATER CUT-OFF1
09/25/2019520350977Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/23/2025520339722Open ↗
▸BISELECTRIC CUT-OFF1
09/25/2019520350977Open ↗
▸BISSEWER CUT-OFF1
09/25/2019520350977Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/23/2025520339722Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/30/2018520339722Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/20/2025520339722Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
12/30/2025520339722Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
09/25/2019520350977Open ↗
09/25/2019520350977Open ↗
▸BISSTREET TREES SITE PLAN1
12/30/2025520339722Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/03/2018520350977Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/08/2021520339722Open ↗
▸BISSTREET TREE CHECKLIST1
11/30/2018520339722Open ↗
▸BISSTREET TREE SIGNOFF1
08/28/2025520339722Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/03/2018520350977Open ↗
08/01/2018520350977Open ↗
▸Energy Compliance11
▸BISAIR SEALING AND INSULATION - VISUAL1
09/23/2025520339722Open ↗
▸BISINTERIOR LIGHTING POWER1
09/23/2025520339722Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/23/2025520339722Open ↗
▸BISFENESTRATION AREAS1
09/23/2025520339722Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/23/2025520339722Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/08/2021520339722Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/23/2025520339722Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/23/2025520339722Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/23/2025520339722Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/30/2018520339722Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/23/2025520339722Open ↗
▸Inspections & Test Reports10
▸BISDEMOLITION (DM) JOB SIGNOFF2
08/25/2025520339722Open ↗
04/08/2021520339722Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/23/2025520339722Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/23/2025520339722Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/23/2025520339722Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/23/2025520339722Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/08/2021520339722Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
11/30/2018520339722Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/23/2025520339722Open ↗
▸BISSOIL PERCOLATE TEST-DRY WELL RS16-P1131
11/30/2018520339722Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/25/2019520350977Open ↗
09/25/2019520350977Open ↗
09/25/2019520350977Open ↗
▸BISSUPERSEDING LETTER3
09/06/2024520339722Open ↗
02/21/2024520339722Open ↗
04/15/2021520339722Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
08/25/2025520339722Open ↗
11/30/2018520339722Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/09/2019520339722Open ↗
08/01/2018520350977Open ↗
▸BISLANDMARKS APPROVAL1
09/25/2019520350977Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
11/30/2018520339722Open ↗
08/01/2018520350977Open ↗
▸BISADDITIONAL INFORMATION1
08/28/2025520339722Open ↗
▸BISBOROUGH INTAKE FORM1
02/21/2024520339722Open ↗
▸Other Documents4
▸BISSHUTOFF DAMPERS1
09/23/2025520339722Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
09/25/2019520350977Open ↗
▸BISMAINTENANCE INFORMATION1
09/23/2025520339722Open ↗
▸BISPERMANENT CERTIFICATE1
09/23/2025520339722Open ↗