STATEN ISLAND
418 ALTER AVENUE
STATEN ISLAND · BIN 5170335
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
V V DEVELOPMENT2004/09/2026
GOOD KARMA REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.310/10/2025
C&P DESIGN CONSULTANTS107/23/2025
WILLIAM MONTAGUE ENGINEER107/11/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLOW-RIGHT PLBG & HTG CORPlumbing407/08/2026
V&V DEVELOPMENT CORPGeneral Contractor303/21/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
Building Lifecycle
All (23)Filed (5)Permit Issued (6)Signed Off (3)Violation (1)Inspection (8)
12/30/2025
Signed off — Alteration
Plumbing work associated with NB application
S00411839-I1
12/30/2025
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S01067582-I1
11/19/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Filed — Alteration
Plumbing work associated with NB application
S00411839-P2
08/18/2025
Signed off — Alteration
15' shared curb cut. Also applies to 422 Alter Avenue
S00411841-I1
08/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/08/2025
Permit issued — Plumbing
S01067582-I1-PL
07/24/2025
Permit issued — Curb Cut
S00411841-I1-CC
07/23/2025
Filed — Alteration
15' shared curb cut. Also applies to 422 Alter Avenue
S00411841-I1
04/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
S20246135-I1-PL
03/12/2025
Filed — Alteration
Plumbing work associated with NB application
S00411839-P1
03/11/2025
Permit issued — Plumbing
S00411839-I1-PL
07/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Permit issued — Plumbing
S01067582-I1-PL
07/11/2024
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S01067582-I1
03/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/24/2023
Permit issued — Plumbing
S00411839-I1-PL
05/19/2023
Filed — Alteration
Plumbing work associated with NB application
S00411839-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/08/2025
DOB NOWCurb CutSigned-offV&V DEVELOPMENT CORP07/24/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/02/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/11/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/15/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/24/2023
BIS—ISSUEDV&V DEVELOPMENT CORP10/21/2024
BIS—ISSUEDV&V DEVELOPMENT CORP10/09/2023
BIS—ISSUEDV&V DEVELOPMENT CORP05/24/2023
BIS—ISSUEDV&V DEVELOPMENT CORP01/03/2022
1 project · most recent 06/21/2024
General Wiring
FiledStatusContractorScope
06/21/2024CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/19/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2023Pass-Final PL - UndergroundPassView ↗
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
08/18/2026S00411839-I1Request digital key ↗
08/18/2026S00411839-P2Request digital key ↗
08/15/2026S00411839-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/18/2026S00411841-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026S01067582-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/20/2025540186966Open ↗
10/23/2020540186966Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/25/2025540186966Open ↗
▸BISWORK PERMIT APPLICATION1
01/03/2022540186966Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/23/2020540186966Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/27/2021540186966Open ↗
▸BISVERIFY TAX LOT1
08/21/2025540186966Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/21/2025540186966Open ↗
▸BISZONING DIAGRAM1
11/22/2021540186966Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026S00411841-I1Open ↗
08/18/2026S00411839-P1Open ↗
08/18/2026S00411839-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/23/2020540186966Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/23/2020540186966Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/22/2021540186966Open ↗
10/27/2021540186966Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/07/2025540186966Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/07/2025540186966Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/27/2021540186966Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/07/2025540186966Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/07/2025540186966Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
11/22/2021540186966Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/27/2021540186966Open ↗
▸BISSTREET TREE CHECKLIST1
10/23/2020540186966Open ↗
▸BISSTREET TREE SIGNOFF1
08/21/2025540186966Open ↗
▸Energy Compliance14
▸BISELECTRICAL ENERGY CONSUMPTION2
12/07/2025540186966Open ↗
12/07/2025540186966Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/07/2025540186966Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/07/2025540186966Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/27/2021540186966Open ↗
▸BISINTERIOR LIGHTING POWER1
12/07/2025540186966Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/07/2025540186966Open ↗
▸BISFENESTRATION AREAS1
12/07/2025540186966Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/07/2025540186966Open ↗
▸BISNYCECC ANALYSIS1
11/22/2021540186966Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/07/2025540186966Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/07/2025540186966Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/07/2025540186966Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/23/2020540186966Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/22/2021540186966Open ↗
10/27/2021540186966Open ↗
10/27/2021540186966Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/22/2021540186966Open ↗
10/27/2021540186966Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
12/07/2025540186966Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/07/2025540186966Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
08/22/2025540186966Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
01/03/2022540186966Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/07/2025540186966Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/07/2025540186966Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/07/2025540186966Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/07/2025540186966Open ↗
▸BISSOIL REPORT1
10/27/2021540186966Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/27/2021540186966Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
11/20/2025540186966Open ↗
10/23/2020540186966Open ↗
▸BISCURB CUT (CC) SIGNOFF1
08/21/2025540186966Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/23/2020540186966Open ↗
▸Other Documents12
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)2
12/07/2025540186966Open ↗
12/07/2025540186966Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
12/07/2025540186966Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/27/2021540186966Open ↗
▸BISMAINTENANCE INFORMATION1
12/07/2025540186966Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/07/2025540186966Open ↗
▸BISPERMANENT CERTIFICATE1
12/07/2025540186966Open ↗
▸BISBPP: FILING REQUIRED1
10/27/2021540186966Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
12/07/2025540186966Open ↗
▸BISDOB NOW REVIEW COMPLETE1
01/12/2026540186966Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/07/2025540186966Open ↗
▸BISPLOT DIAGRAM1
10/23/2020540186966Open ↗