330 LAFAYETTE AVENUE
STATEN ISLAND · BIN 5171749
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof2p · 1 filing · 20 docs
1 job · most recent 07/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin REY408A4AATJA 408,000 BTU · Vrf Outdoor ×1
Ventilation
Daikin ×1
1 job · most recent 07/07/2026
Sprinkler System
FiledStatusContractorScope
07/07/2026——Sprinkler System
2 jobs · most recent 07/07/2026
Water/Sanitary Storm
FiledStatusContractorScope
07/07/2026——Water/Sanitary
03/25/2026——Storm
1 job · most recent 09/22/2026
FiledStatusContractorScope
09/22/2026Permit IssuedINTER CONNECTION ELETRIC—
3 jobs · most recent 07/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/21/2026——1 scope_items
07/07/2026——3 scope_items
06/30/2026——Steel, Concrete, Masonry
Building Lifecycle
All (95)Filed (9)Objection (57)Special Inspection (29)
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Open
08/05/2026
Objection resolved — Open
08/05/2026
Objection resolved — Open
07/21/2026
Filed — Alteration
FILING HEREWITH CIVIL GENERAL CONSTRUCTIONS AND EARTHWORK AS INDICATED ON THE DRAWINGS
S01388193-I1
07/20/2026
Objection resolved — Addressed
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/07/2026
Filed — New Building
Plumbing system installation in conjunction with New Building.
S01289960-S7
06/30/2026
Filed — Alteration
FILING HEREWITH SUPERSTRUCTURE FILING AND STRUCTURAL FOUNDATIONS IN CONJUNCTION WITH NEW BUILDING # S01289960-I1 SUBSEQUENT APPLICATIONS NUMBER ARE LISTED ON THE DRAWINGS . THE SYSTEM WILL NOT ALLOW US TO ADD THE NB NUMBER
S01388671-I1
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/17/2026
Objection raised — Scope
06/16/2026
Objection raised — Other
06/05/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/19/2026
Filed — Alteration
MODIFICATION TO AN EXISTING CURB CUT AS INDICATED ON THE DRAWINGS
S01389245-I1
05/18/2026
Objection raised — Other
05/13/2026
Objection raised — Other
05/13/2026
Objection raised — Other
05/07/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Admin
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/25/2026
Filed — Alteration
FILING HEREWITH CIVIL PLUMBING WORK INCLUDES REMOVE EXISTING PAVEMENT, STORM STRUCTURE AND PIPING INSTALL ASPHALT CONCRETE CURBS AND PARKING DRAWINGS ON THE FIRST FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
S01352272-I1
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Resolved
02/16/2026
Objection resolved — Resolved
02/16/2026
Objection resolved — Resolved
02/16/2026
Objection resolved — Resolved
02/16/2026
Objection resolved — Resolved
01/06/2026
Objection raised — Zoning
01/06/2026
Objection raised — Zoning
01/06/2026
Objection raised — Zoning
01/06/2026
Objection raised — Zoning
01/06/2026
Objection raised — Zoning
12/30/2025
Objection raised — Scope
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Fire_Protection
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Fire_Protection
12/30/2025
Objection raised — Fire_Protection
12/30/2025
Objection raised — Fire_Protection
Latest 60 of 95 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARTLAND ENGINEERING, DPC407/21/2026
HATFIELD GROUP ENGINEERING406/30/2026
BKSK ARCHITECTS, LLP112/22/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/22/2025HVAC-R and service water heating system controls—energy_progress
12/22/2025HVAC-R and service water piping design and insulation—energy_progress
12/22/2025HVAC-R and service water heating equipment—energy_progress
12/22/2025Shutoff dampers—energy_progress
12/16/2025Maintenance information—energy_progress
12/16/2025Metering—energy_progress
12/16/2025Air barrier continuity plan testing—energy_progress
12/16/2025HVAC-R and service water heating equipment—energy_progress
12/12/2025Heating Systems—special
12/12/2025Fire-Resistant Penetrations and Joints—special
12/12/2025Post-installed Anchors—special
12/05/2025Sprinkler Systems—special
12/05/2025Mechanical Systems—special
12/05/2025Final—progress
12/01/2025Fire-Resistance Rated Construction—progress
12/01/2025Interior lighting power—energy_progress
12/01/2025Air barrier - visual inspection—energy_progress
12/01/2025Lighting controls—energy_progress
12/01/2025Fenestration and door U-factor and product ratings—energy_progress
12/01/2025Energy Code Compliance Inspections—progress
12/01/2025Vestibules—energy_progress
12/01/2025Wall Panels, Curtain Walls, and Veneers—special
12/01/2025Exterior lighting power—energy_progress
12/01/2025Masonry—special
12/01/2025Fenestration areas—energy_progress
Latest 25 of 29.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/17/2026S01289960-S1Request digital key ↗
08/17/2026S01289960-S7Request digital key ↗
08/17/2026S01289960-S6Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01289960-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/17/2026S01289960-S8Open ↗
08/17/2026S01289960-S4Open ↗
08/17/2026S01289960-S9Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026S01289960-S8Open ↗
08/13/2026S01289960-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/17/2026S01289960-S9Open ↗
08/17/2026S01289960-S7Open ↗
08/17/2026S01289960-S8Open ↗
Showing 3 of 12 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026S01289960-S9Open ↗
08/16/2026S01388671-I1Open ↗
08/13/2026S01289960-S8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/17/2026S01289960-S9Open ↗
08/13/2026S01289960-S8Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01289960-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026S01289960-S7Open ↗