← Back
Two family frame
426 LORETTO STREET
STATEN ISLAND · BIN 5174492
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
3,366 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.84 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 21p · 1 filing · 17 docs
Floor 11p · 1 filing · 17 docs
Cellar1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CICCARELLI & ASSOCIATES2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE508/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICOLOSI BROS INCGeneral Contractor707/08/2026
FINE MECHANICAL CORPPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683308/10/2023
Building Lifecycle
All (43)Filed (5)Permit Issued (7)Signed Off (3)Inspection (7)Special Inspection (21)
09/14/2023
Signed off — Alteration
Application is filed for the plumbing work associated with 2-story 2-family detached residence, as well as to obtain new C/O for new residence. All work as per plans submitted herewith.
S00338511-I1
08/10/2023
Filed — Alteration
Application is filed for the plumbing work associated with 2-story 2-family detached residence, as well as to obtain new C/O for new residence. All work as per plans submitted herewith.
S00338511-P2
08/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
08/10/2023
Special inspection requirement — Electrical energy consumption
Frank Martarella III
08/10/2023
Special inspection requirement — HVAC and service water heating equipment
Frank Martarella III
08/10/2023
Special inspection requirement — HVAC and service water heating system controls
Frank Martarella III
08/10/2023
Special inspection requirement — Maintenance information
Frank Martarella III
08/10/2023
Special inspection requirement — Electrical motors
Frank Martarella III
08/10/2023
Special inspection requirement — HVAC insulation and sealing
Frank Martarella III
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
07/25/2023
Special inspection requirement — Maintenance information
Frank Martarella III
07/25/2023
Special inspection requirement — HVAC and service water heating system controls
Frank Martarella III
07/25/2023
Special inspection requirement — HVAC insulation and sealing
Frank Martarella III
07/25/2023
Special inspection requirement — Electrical energy consumption
Frank Martarella III
07/25/2023
Special inspection requirement — HVAC and service water heating equipment
Frank Martarella III
07/25/2023
Special inspection requirement — Electrical motors
Frank Martarella III
06/22/2023
Signed off — Alteration
S00338506-I1
06/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2023
Permit issued — Curb Cut
S00338506-I1-CC
06/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2023
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. ALL WOK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
S00302746-I1
06/07/2023
Filed — Alteration
Application is filed for the plumbing work associated with 2-story 2-family detached residence, as well as to obtain new C/O for new residence. All work as per plans submitted herewith.
S00338511-P1
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
05/30/2023
Special inspection requirement — Maintenance information
Frank Martarella III
05/30/2023
Special inspection requirement — HVAC insulation and sealing
Frank Martarella III
05/30/2023
Special inspection requirement — HVAC and service water heating equipment
Frank Martarella III
05/30/2023
Special inspection requirement — HVAC and service water heating system controls
Frank Martarella III
05/30/2023
Special inspection requirement — Electrical energy consumption
Frank Martarella III
05/30/2023
Special inspection requirement — Electrical motors
Frank Martarella III
03/28/2023
Permit issued — Plumbing
S81281891-I1-PL
03/21/2023
Permit issued — Construction Fence
S00302746-I1-FN
12/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2022
Permit issued — Plumbing
S81281891-I1-PL
04/08/2022
Permit issued — Construction Fence
S00302746-I1-FN
10/06/2021
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/04/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/29/2021
Permit issued — Plumbing
S00338511-I1-PL
03/30/2021
Permit issued — Construction Fence
S00302746-I1-FN
04/23/2020
Filed — Alteration
Application is filed for the plumbing work associated with 2-story 2-family detached residence, as well as to obtain new C/O for new residence. All work as per plans submitted herewith.
S00338511-I1
04/14/2020
Filed — Alteration
S00338506-I1
01/28/2020
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. ALL WOK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
S00302746-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNICOLOSI BROS INC06/09/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP03/28/2023
DOB NOWConstruction FenceSigned-offNICOLOSI BROS INC03/21/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP11/17/2022
DOB NOWConstruction FenceSigned-offNICOLOSI BROS INC04/08/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/29/2021
DOB NOWConstruction FenceSigned-offNICOLOSI BROS INC03/30/2021
BIS—ISSUEDNICOLOSI BROS INC10/12/2022
BIS—ISSUEDNICOLOSI BROS INC03/18/2022
BIS—ISSUEDNICOLOSI BROS INC09/09/2021
2 projects · most recent 03/03/2023
General Wiring
FiledStatusContractorScope
03/03/2023CompleteFICHERA ELECTRIC, INCGeneral Wiring
12/14/2021CompleteFICHERA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/04/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/10/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
08/10/2023Electrical energy consumptionFrank Martarella IIIenergy_progress
08/10/2023HVAC and service water heating equipment Frank Martarella IIIenergy_progress
08/10/2023HVAC and service water heating system controls Frank Martarella IIIenergy_progress
08/10/2023Maintenance informationFrank Martarella IIIenergy_progress
08/10/2023Electrical motorsFrank Martarella IIIenergy_progress
08/10/2023HVAC insulation and sealing Frank Martarella IIIenergy_progress
07/25/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
07/25/2023Maintenance informationFrank Martarella IIIenergy_progress
07/25/2023HVAC and service water heating system controls Frank Martarella IIIenergy_progress
07/25/2023HVAC insulation and sealing Frank Martarella IIIenergy_progress
07/25/2023Electrical energy consumptionFrank Martarella IIIenergy_progress
07/25/2023HVAC and service water heating equipment Frank Martarella IIIenergy_progress
07/25/2023Electrical motorsFrank Martarella IIIenergy_progress
05/30/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
05/30/2023Maintenance informationFrank Martarella IIIenergy_progress
05/30/2023HVAC insulation and sealing Frank Martarella IIIenergy_progress
05/30/2023HVAC and service water heating equipment Frank Martarella IIIenergy_progress
05/30/2023HVAC and service water heating system controls Frank Martarella IIIenergy_progress
05/30/2023Electrical energy consumptionFrank Martarella IIIenergy_progress
05/30/2023Electrical motorsFrank Martarella IIIenergy_progress
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026S00338511-P1Request digital key ↗
08/23/2026S00338511-P2Request digital key ↗
08/23/2026S00338511-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026S00338506-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026S00302746-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION22
10/17/2023520452019Open ↗
10/16/2023520452019Open ↗
08/18/2023520452019Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION2
09/09/2021520452019Open ↗
05/11/2021520452019Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
04/18/2023520392762Open ↗
12/30/2019520392762Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/26/2023520452019Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
05/03/2021520452019Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
10/20/2020520452019Open ↗
10/20/2020520452019Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/30/2019520392762Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/07/2023520452019Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/02/2020520452019Open ↗
▸BISVERIFY TAX LOT1
09/07/2023520452019Open ↗
▸BISFLOOD ZONE COMPLIANCE1
09/08/2023520452019Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/07/2023520452019Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026S00338511-I1Open ↗
08/26/2026S00338511-I1Open ↗
08/26/2026S00338511-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026S00302746-I1Open ↗
08/23/2026S00338511-P2Open ↗
08/23/2026S00338511-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/27/2023520452019Open ↗
04/10/2020520452019Open ↗
04/10/2020520452019Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S00338511-P2Open ↗
08/26/2026S00338511-I1Open ↗
08/23/2026S00338511-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/10/2020520452019Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/10/2020520452019Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/17/2023520452019Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
04/10/2020520452019Open ↗
10/11/2019520392762Open ↗
▸BISSTREET TREES SITE PLAN1
06/27/2023520452019Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/11/2021520452019Open ↗
▸BISSTREET TREE SIGNOFF1
06/22/2023520452019Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/06/2021520452019Open ↗
03/23/2021520452019Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/08/2023520452019Open ↗
▸BISINTERIOR LIGHTING POWER1
09/08/2023520452019Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/08/2023520452019Open ↗
▸BISFENESTRATION AREAS1
09/08/2023520452019Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/08/2023520452019Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/08/2023520452019Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/10/2020520452019Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2023520452019Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/26/2023520452019Open ↗
04/06/2021520452019Open ↗
03/23/2021520452019Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/08/2023520452019Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/14/2023520452019Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/27/2023520452019Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/08/2023520452019Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/08/2023520452019Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/08/2023520452019Open ↗
▸BISMASONRY1
09/08/2023520452019Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/30/2019520392762Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/08/2023520452019Open ↗
▸BISSOIL REPORT1
10/20/2020520452019Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/14/2023520452019Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
10/16/2023520452019Open ↗
07/03/2023520452019Open ↗
06/17/2021520452019Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/10/2020520452019Open ↗
10/11/2019520392762Open ↗
▸BISBSA/CPC APPROVAL1
09/18/2020520452019Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
10/23/2020520452019Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
09/20/2023520452019Open ↗
08/18/2023520452019Open ↗
05/03/2023520452019Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
04/10/2020520452019Open ↗
10/11/2019520392762Open ↗
▸Other Documents13
▸BISSUSTAINABLE ROOF ZONE FORM1
10/23/2020520452019Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
08/25/2020520452019Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/08/2023520452019Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
10/30/2019520392762Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD MAP1
10/01/2020520452019Open ↗
▸BISMAINTENANCE INFORMATION1
09/08/2023520452019Open ↗
▸BISPERMANENT CERTIFICATE1
09/08/2023520452019Open ↗
▸BISBPP: FILING REQUIRED1
10/20/2020520452019Open ↗
▸BISWAIVER OF SIDE WALK1
06/30/2023520392762Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
09/08/2023520452019Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/30/2023520392762Open ↗
▸BISPLOT DIAGRAM1
04/10/2020520452019Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
09/08/2023520452019Open ↗