← Back
STATEN ISLAND
101 CHESTNUT AVENUE
STATEN ISLAND · BIN 5174678
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 3 docs
Floor 224p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZAIM CONTRACTOR103/22/2026
ESNY CONSTRUCTION SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC603/07/2024
JAMES A CLANCY101/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING203/21/2026
ROGERS CALVANICO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor803/21/2026
WILLIAM REYNOLDSGeneral Contractor303/21/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397403/05/2024
ETRECTE LLC8116101/18/2024
Building Lifecycle
All (67)Filed (7)Permit Issued (8)Signed Off (4)Violation (1)Inspection (15)Objection (2)Special Inspection (30)
04/08/2024
Signed off — Alteration
S00984755-I1
04/04/2024
Signed off — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S3
04/02/2024
Signed off — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S1
04/02/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/22/2024
Permit issued — Curb Cut
S00702014-S3-CC
03/21/2024
Signed off — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S2
03/07/2024
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S3
03/05/2024
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-P2
03/05/2024
Special inspection requirement — Sprinkler Systems
JIAN DENG
03/04/2024
Special inspection requirement — Sprinkler Systems
JIAN DENG
02/28/2024
Permit issued — Solar
S00984755-I1-SL
02/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/18/2024
Filed — Alteration
S00984755-I1
01/18/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/21/2023
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-P1
12/21/2023
Special inspection requirement — Sprinkler Systems
JIAN DENG
12/20/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2023
Permit issued — Sprinklers
S00702014-S1-EW-SP
09/20/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2023
Permit issued — Plumbing
S46200628-S1-PL
07/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/05/2023
Permit issued — Mechanical Systems
S00702014-I1-GC-CX
06/28/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/23/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/24/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/18/2023
Violation issued (ECB, closed)
Construction
05/12/2023
Permit issued — Plumbing
S00702014-S1-PL
02/14/2023
Permit issued — Construction Fence
S00702014-S2-FN
02/13/2023
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S2
02/01/2023
Permit issued — Foundation
S00702014-I1-GC-CX
10/11/2022
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-S1
09/28/2022
Objection raised — Scope
09/28/2022
Objection resolved — Addressed
08/29/2022
Filed — New Building
CONSTRUCT TWO STORY WAREHOUSE/OFFICE BUILDING.
S00702014-I1
08/23/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
08/23/2022
Special inspection requirement — Structural Steel - Welding
JIAN DENG
08/23/2022
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
08/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/23/2022
Special inspection requirement — Masonry
JIAN DENG
08/23/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JIAN DENG
08/23/2022
Special inspection requirement — Subgrade Inspections
JIAN DENG
08/23/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JIAN DENG
08/23/2022
Special inspection requirement — Insulation placement and R values
JIAN DENG
08/23/2022
Special inspection requirement — Structural Cold-Formed Steel
JIAN DENG
08/23/2022
Special inspection requirement — Structural Steel - Details
JIAN DENG
08/23/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/23/2022
Special inspection requirement — Exterior lighting power
JIAN DENG
08/23/2022
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
08/23/2022
Special inspection requirement — Fenestration air leakage
JIAN DENG
08/23/2022
Special inspection requirement — Interior lighting power
JIAN DENG
08/23/2022
Special inspection requirement — Electrical motors and elevators
JIAN DENG
08/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
08/23/2022
Special inspection requirement — Lighting controls
JIAN DENG
08/23/2022
Special inspection requirement — Fenestration areas
JIAN DENG
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC03/22/2024
DOB NOWSolarSigned-offWILLIAM REYNOLDS02/28/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP11/02/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/31/2023
DOB NOWMechanical SystemsPermit IssuedSUFFOLK CONSTRUCT CO. INC07/05/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/12/2023
DOB NOWConstruction FenceSigned-offSUFFOLK CONSTRUCT CO. INC02/14/2023
DOB NOWFoundationPermit IssuedSUFFOLK CONSTRUCT CO. INC02/01/2023
1 project · most recent 03/07/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/07/2024Signed-offZAIM CONTRACTOR CORPAssociated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Rheem RGECZR060AJT122AC 5 tons · Rooftop Unit ×1
Heating
Modine PTC-85AS0111FBAC 65,000 BTU · Electric Heater ×1
PTC-85ASO111FBAC 85,000 BTU · Electric Heater ×1
Ducts & Piping
__Junk__ Generic 1 BTU ×1
1 project · most recent 03/07/2024
Sprinkler System
FiledStatusContractorScope
03/07/2024Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 project · most recent 03/07/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/07/2024Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
2 projects · most recent 01/12/2024
General Wiring
FiledStatusContractorScope
01/12/2024CompleteJSP ELECTL CNTNG CORP—
11/06/2023CompleteA & R ELEC'L CONTR'G INC.General Wiring
1 project · most recent 03/07/2024
Steel Concrete Masonry
FiledStatusContractorScope
03/07/2024Signed-offZAIM CONTRACTOR CORPSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/02/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/18/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2023Pass-Final PL - UndergroundPassView ↗
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/28/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/23/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/24/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/05/2024Sprinkler SystemsJIAN DENGspecial
03/04/2024Sprinkler SystemsJIAN DENGspecial
12/21/2023Sprinkler SystemsJIAN DENGspecial
08/23/2022Structural Steel - High Strength BoltingJIAN DENGspecial
08/23/2022Structural Steel - WeldingJIAN DENGspecial
08/23/2022Concrete - Cast-In-PlaceJIAN DENGspecial
08/23/2022Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/23/2022MasonryJIAN DENGspecial
08/23/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJIAN DENGspecial
08/23/2022Subgrade InspectionsJIAN DENGspecial
08/23/2022Subsurface Conditions – Fill Placement & In-Place DensityJIAN DENGspecial
08/23/2022Insulation placement and R valuesJIAN DENGenergy_progress
08/23/2022Structural Cold-Formed SteelJIAN DENGspecial
08/23/2022Structural Steel - DetailsJIAN DENGspecial
08/23/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/23/2022Exterior lighting powerJIAN DENGenergy_progress
08/23/2022Air barrier - visual inspectionJIAN DENGenergy_progress
08/23/2022Fenestration air leakageJIAN DENGenergy_progress
08/23/2022Interior lighting powerJIAN DENGenergy_progress
08/23/2022Electrical motors and elevatorsJIAN DENGenergy_progress
08/23/2022Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
08/23/2022Lighting controlsJIAN DENGenergy_progress
08/23/2022Fenestration areasJIAN DENGenergy_progress
08/23/2022Fire-Resistance Rated ConstructionJIAN DENGprogress
05/27/2022HVAC-R and service water heating equipmentJIAN DENGenergy_progress
Latest 25 of 33.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00702014-P1Request digital key ↗
08/23/2026S00702014-S3Request digital key ↗
08/23/2026S00702014-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
03/15/2022540211983Open ↗
12/28/2021540211983Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/28/2021540211983Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00702014-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00702014-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00702014-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature18
08/22/2026S00702014-I1Open ↗
08/22/2026S00702014-I1Open ↗
08/22/2026S00702014-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026S00702014-P2Open ↗
08/27/2026S00702014-P1Open ↗
08/25/2026S00702014-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00702014-S2Open ↗
08/23/2026S00702014-P1Open ↗
08/23/2026S00702014-S1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/28/2021540211983Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/28/2021540211983Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00702014-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00702014-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00702014-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00702014-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00702014-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00702014-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/28/2021540211983Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00702014-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00702014-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
03/16/2022540211983Open ↗
12/28/2021540211983Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00984755-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/28/2021540211983Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/28/2021540211983Open ↗
▸BISWAIVER OF LEGAL GRADE1
03/16/2022540211983Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
03/10/2022540211983Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00702014-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00702014-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00702014-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S00702014-I1Open ↗