ArchitectureStructuralMechanicalGeneral
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A E DEVELOPMENT2607/08/2026
FOXBEACH CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS PONISI, ARCHITECT609/06/2023
A TECH ENGINEERING NYC, PLLC.108/01/2023
WILLIAM MONTAGUE ENGINEER111/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.E.H BUILDERS CORPGeneral Contractor407/08/2026
JB BUZCO PLUMBING LLCPlumbing107/08/2026
PREMIER PL,HTG & MECH INCPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738609/06/2023
Building Lifecycle
All (67)Filed (8)Permit Issued (6)Signed Off (4)Inspection (15)Objection (4)Special Inspection (30)
09/06/2023
Filed — New Building
Scope of work for this application is to provide new gas furnaces w/ DX-coils and associated condenser unit for 2 residential units within the building. Exhaust and ERV systems are installed for each system ventilation.
S00656933-P3
09/05/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
09/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
09/05/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/05/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/05/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
09/05/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
09/05/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
09/05/2023
Special inspection requirement — Final
anthony santoro
09/05/2023
Special inspection requirement — Footing and Foundation
anthony santoro
09/05/2023
Special inspection requirement — Interior lighting power
anthony santoro
09/05/2023
Special inspection requirement — Air barrier — testing
anthony santoro
09/05/2023
Special inspection requirement — Permanent certificate
anthony santoro
09/05/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
09/05/2023
Special inspection requirement — Maintenance information
anthony santoro
09/05/2023
Special inspection requirement — Metering
anthony santoro
09/05/2023
Special inspection requirement — Fenestration areas
anthony santoro
09/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/05/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
09/05/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
09/05/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
08/28/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00879773-I1
08/28/2023
Filed — New Building
Scope of work for this application is to provide new gas furnaces w/ DX-coils and associated condenser unit for 2 residential units within the building. Exhaust and ERV systems are installed for each system ventilation.
S00656933-P2
08/28/2023
Special inspection requirement — Permanent certificate
anthony santoro
08/28/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/28/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
08/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/28/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
08/28/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
08/28/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
08/28/2023
Special inspection requirement — Final
anthony santoro
08/28/2023
Special inspection requirement — Footing and Foundation
anthony santoro
08/18/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
08/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/03/2023
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
08/02/2023
Permit issued — Plumbing
S00879773-I1-PL
08/01/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00879773-I1
05/11/2023
Signed off — New Building
Scope of work for this application is to provide new gas furnaces w/ DX-coils and associated condenser unit for 2 residential units within the building. Exhaust and ERV systems are installed for each system ventilation.
S00656933-S2
05/11/2023
Signed off — New Building
Scope of work for this application is to provide new gas furnaces w/ DX-coils and associated condenser unit for 2 residential units within the building. Exhaust and ERV systems are installed for each system ventilation.
S00656933-S1
04/20/2023
Objection resolved — Addressed
04/17/2023
Objection raised — Scope
04/14/2023
Signed off — Alteration
S08043915-I1
04/10/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/01/2023
Filed — New Building
Scope of work for this application is to provide new gas furnaces w/ DX-coils and associated condenser unit for 2 residential units within the building. Exhaust and ERV systems are installed for each system ventilation.
S00656933-P1
02/27/2023
Permit issued — Mechanical Systems
S00656933-S1-MS
02/23/2023
Permit issued — Curb Cut
S08043915-I1-CC
12/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2022
Filed — Alteration
S08043915-I1
11/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/29/2022
Permit issued — Plumbing
S36292825-S2-PL
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC08/02/2023
DOB NOWMechanical SystemsSigned-offA.E.H BUILDERS CORP02/27/2023
DOB NOWCurb CutSigned-offA.E.H BUILDERS CORP02/23/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/29/2022
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC04/27/2022
DOB NOWStructuralPermit IssuedA.E.H BUILDERS CORP03/11/2022
1 project · most recent 09/06/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/06/2023Signed-offA.E.H BUILDERS CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem RA1336AJ1NA 3 tons · Condensing Unit ×2
RA1348AJ1NA 4 tons · Split System ×2
Heating
Rheem R92tA1001521MSA 100,000 BTU · Furnace ×2
R801ca075417sa 75,000 BTU · Furnace ×1
Ventilation
Renewaire SL70H 70 CFM · Erv ×2
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 05/14/2022
General Wiring
FiledStatusContractorScope
05/14/2022CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 09/06/2023
Steel Concrete Wood
FiledStatusContractorScope
09/06/2023Signed-offA.E.H BUILDERS CORPSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/18/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
08/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/03/2023Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
04/10/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/05/2023Air barrier - visual inspectionanthony santoroenergy_progress
09/05/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/05/2023Concrete - Cast-In-Placeanthony santorospecial
09/05/2023Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
09/05/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
09/05/2023Structural Steel - Detailsanthony santorospecial
09/05/2023Subgrade Inspectionsanthony santorospecial
09/05/2023Wood – Prefabricated I-Joistsanthony santorospecial
09/05/2023Finalanthony santoroprogress
09/05/2023Footing and Foundationanthony santoroprogress
09/05/2023Interior lighting poweranthony santoroenergy_progress
09/05/2023Air barrier — testing anthony santoroenergy_progress
09/05/2023Permanent certificateanthony santoroenergy_progress
09/05/2023Fenestration air leakageanthony santoroenergy_progress
09/05/2023Maintenance informationanthony santoroenergy_progress
09/05/2023Meteringanthony santoroenergy_progress
09/05/2023Fenestration areasanthony santoroenergy_progress
09/05/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/05/2023Insulation placement and R valuesanthony santoroenergy_progress
09/05/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/05/2023Protection of exposed foundation insulationanthony santoroenergy_progress
08/28/2023Permanent certificateanthony santoroenergy_progress
08/28/2023Concrete - Cast-In-Placeanthony santorospecial
08/28/2023Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
08/28/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
Latest 25 of 44.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S08043915-I1Request digital key ↗
08/22/2026S00879773-I1Request digital key ↗
08/22/2026S00656933-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/20/2022540204116Open ↗
08/02/2021540204116Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/18/2021540204116Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00656933-P3Open ↗
08/13/2026S00656933-P2Open ↗
08/13/2026S00656933-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00656933-P3Open ↗
08/13/2026S00656933-P2Open ↗
08/13/2026S00656933-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00656933-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S08043915-I1Open ↗
08/22/2026S00656933-P2Open ↗
08/22/2026S00656933-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026S00656933-P2Open ↗
08/28/2026S00656933-P2Open ↗
08/28/2026S00656933-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026S00656933-P2Open ↗
08/28/2026S00656933-P2Open ↗
08/24/2026S00656933-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2021540204116Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/02/2021540204116Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00656933-I1Open ↗
08/13/2026S00656933-P2Open ↗
08/13/2026S00656933-P3Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026S00656933-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/22/2026S00656933-P3Open ↗
08/22/2026S00656933-P2Open ↗
08/15/2026S00656933-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00656933-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00656933-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00656933-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00656933-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/18/2021540204116Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/18/2021540204116Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2021540204116Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION3
10/25/2022540204116Open ↗
08/18/2021540204116Open ↗
08/18/2021540204116Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026S00656933-P2Open ↗
08/13/2026S00656933-P3Open ↗
08/13/2026S00656933-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00656933-P3Open ↗
08/13/2026S00656933-I1Open ↗
08/13/2026S00656933-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00656933-P2Open ↗
08/22/2026S00656933-P3Open ↗
08/15/2026S00656933-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/18/2021540204116Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
08/18/2021540204116Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00656933-I1Open ↗