Two family frame
227 EDGEGROVE AVENUE
STATEN ISLAND · BIN 5175229
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,940 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 220p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Basement19p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.504/05/2023
C&P DESIGN CONSULTANTS203/16/2023
WILLIAM MONTAGUE ENGINEER211/01/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor907/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
RIDGE ELECTRIC CORP.Electrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677704/05/2023
Building Lifecycle
All (72)Filed (9)Permit Issued (10)Signed Off (5)Inspection (18)Special Inspection (30)
08/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/25/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/06/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Fireplaces
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
04/06/2023
Special inspection requirement — Metering
WILLIAM MONTAGUE
04/05/2023
Filed — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-P3
04/05/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
03/20/2023
Signed off — Alteration
PROPOSED 18' CURB CUT INCLUDING 2 (18") SPLAYS
S00633649-I1
03/20/2023
Signed off — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-S4
03/20/2023
Signed off — Alteration
S00679220-I1
03/20/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/17/2023
Signed off — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-S1
03/17/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/16/2023
Filed — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-P2
03/16/2023
Permit issued — Mechanical Systems
S00619282-S4-MS
03/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/03/2023
Signed off — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-S3
02/28/2023
Permit issued — Curb Cut
S00633649-I1-CC
01/18/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2023
Filed — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-P1
11/01/2022
Filed — Alteration
PROPOSED 18' CURB CUT INCLUDING 2 (18") SPLAYS
S00633649-I1
08/10/2022
Filed — New Building
TWO GAS FIRED FURNACES WITH DX COILS AND AIR COOLED CONDENSING UNITS. ONE DUCTLESS SPLIT SYSTEM AC UNIT.
S00619282-S4
06/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2022
Permit issued — General Construction
S00619282-I1-GC-CX
06/08/2022
Permit issued — Construction Fence
S00619282-S3-FN
05/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMADONIA DEVELOPMENT CORP03/16/2023
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP02/28/2023
DOB NOWGeneral ConstructionPermit IssuedMADONIA DEVELOPMENT CORP06/09/2022
DOB NOWConstruction FenceSigned-offMADONIA DEVELOPMENT CORP06/08/2022
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP04/12/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR04/12/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC03/29/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/24/2022
DOB NOWFoundationPermit IssuedMADONIA DEVELOPMENT CORP02/15/2022
DOB NOWConstruction FenceSigned-offMADONIA DEVELOPMENT CORP02/04/2022
1 project · most recent 04/05/2023
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/05/2023Signed-offMADONIA DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Luxaire TC3B3022SA 30,000 BTU · Condensing Unit ×1
TC3B4821SA 4 tons · Condensing Unit ×1
Heat / Cool
Gree LIVV12HP230V1AO 36,000 BTU · Heat Pump Outdoor ×1
Heating
Laars RTGH-95DVLN-2 200,000 BTU · Boiler ×1
Ventilation
Renewaire EV200 150 CFM · Erv ×1
SL75 30 CFM · Erv ×1
Ducts & Piping
N/A N/A 1 BTU ×1
1 project · most recent 01/15/2023
General Wiring
FiledStatusContractorScope
01/15/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/22/2023Pass-Final PL - UndergroundPassView ↗
03/20/2023Pass-Final PL - UndergroundPassView ↗
03/17/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
04/06/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
04/06/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
04/06/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
04/06/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
04/06/2023Excavations - Sheeting, Shoring, and BracingWILLIAM MONTAGUEspecial
04/06/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
04/06/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
04/06/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
04/06/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/06/2023FinalWILLIAM MONTAGUEprogress
04/06/2023Structural Wood FrameWILLIAM MONTAGUEprogress
04/06/2023Footing and FoundationWILLIAM MONTAGUEprogress
04/06/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
04/06/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
04/06/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
04/06/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
04/06/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
04/06/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
04/06/2023FireplacesWILLIAM MONTAGUEenergy_progress
04/06/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
04/06/2023MeteringWILLIAM MONTAGUEenergy_progress
04/05/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
04/05/2023Excavations - Sheeting, Shoring, and BracingWILLIAM MONTAGUEspecial
04/05/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
04/05/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
Latest 25 of 60.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026S00619282-P1Request digital key ↗
08/24/2026S00619282-S4Request digital key ↗
08/24/2026S00619282-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation3
08/29/2022540206793Open ↗
12/02/2021540206793Open ↗
11/16/2021540206793Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
08/25/2022540206793Open ↗
11/16/2021540206793Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00619282-I1Open ↗
08/13/2026S00619282-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00619282-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026S00619282-S4Open ↗
09/01/2026S00619282-I1Open ↗
09/01/2026S00619282-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026S00619282-S3Open ↗
08/24/2026S00619282-S4Open ↗
08/24/2026S00619282-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S00619282-S4Open ↗
09/01/2026S00619282-S4Open ↗
09/01/2026S00619282-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/16/2021540206793Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/16/2021540206793Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00619282-I1Open ↗
08/13/2026S00619282-P3Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00619282-I1Open ↗
08/13/2026S00619282-P3Open ↗
▸BISSTREET TREES SITE PLAN1
03/06/2023540206793Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00619282-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00619282-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00619282-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026S00619282-P3Open ↗
08/13/2026S00619282-P1Open ↗
08/13/2026S00619282-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00619282-I1Open ↗
08/13/2026S00619282-S1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/16/2021540206793Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00619282-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
03/07/2023540206793Open ↗
12/02/2021540206793Open ↗
11/16/2021540206793Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/07/2023540206793Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/16/2021540206793Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026S00619282-P3Open ↗
08/13/2026S00619282-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00619282-I1Open ↗
08/13/2026S00619282-P3Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/02/2021540206793Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
11/16/2021540206793Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
12/02/2021540206793Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/09/2023540206793Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00619282-I1Open ↗