← Back
Two family frame
344 BETHEL AVENUE
STATEN ISLAND · BIN 5175329
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
4,143 sfGross Floor Area
2Units
Two family frame · 6,132 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 25p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEADFAST CONSTRUCTION1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT710/05/2023
C&P DESIGN CONSULTANTS105/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEADFAST CONSTRUCTION LLGeneral Contractor1307/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677310/05/2023
Building Lifecycle
All (22)Filed (8)Permit Issued (9)Signed Off (5)
11/08/2023
Signed off — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S2
10/05/2023
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-P2
07/27/2023
Signed off — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S3
07/27/2023
Signed off — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S1
07/27/2023
Signed off — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S4
07/10/2023
Signed off — Alteration
INSTALLATION OF NEW WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY & INSTALLATION OF NEW SPRINKLER SYSTEM
S00743785-I1
06/01/2023
Permit issued — Curb Cut
S00639847-S4-CC
06/01/2023
Permit issued — Curb Cut
S00639847-S1-CC
01/30/2023
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-P1
10/11/2022
Permit issued — Earth Work
S00639847-I1-GC-CX
10/05/2022
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S1
10/05/2022
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S4
08/31/2022
Permit issued — Plumbing
S46551196-S3-PL
08/11/2022
Permit issued — Sprinklers
S00743785-I1-EW-SP
08/09/2022
Permit issued — Plumbing
S00743785-I1-PL
07/26/2022
Permit issued — Plumbing
S00639847-S3-PL
05/28/2022
Filed — Alteration
INSTALLATION OF NEW WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY & INSTALLATION OF NEW SPRINKLER SYSTEM
S00743785-I1
05/26/2022
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S3
05/23/2022
Permit issued — Foundation
S00639847-I1-GC-CX
05/13/2022
Permit issued — Construction Fence
S00639847-S2-FN
05/11/2022
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-S2
01/19/2022
Filed — New Building
TW0-FAMILY DETACHED RESIDENCE WITH ACCESSORY BUILT-IN ONE-CAR GARAGE.
S00639847-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSTEADFAST CONSTRUCTION LL06/01/2023
DOB NOWCurb CutSigned-offSTEADFAST CONSTRUCTION LL06/01/2023
DOB NOWEarth WorkPermit IssuedSTEADFAST CONSTRUCTION LL10/11/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/31/2022
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP08/11/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/09/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/26/2022
DOB NOWFoundationPermit IssuedSTEADFAST CONSTRUCTION LL05/23/2022
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL05/13/2022
1 project · most recent 10/05/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/05/2023Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 09/08/2022
General Wiring
FiledStatusContractorScope
09/08/2022CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
05/19/2022CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
1 project · most recent 10/05/2023
Concrete Wood
FiledStatusContractorScope
10/05/2023Signed-offSTEADFAST CONSTRUCTION LLConcrete, Wood
1 project · most recent 10/05/2023
Fence
FiledStatusContractorScope
10/05/2023Signed-offSTEADFAST CONSTRUCTION LLFence
1 project · most recent 10/05/2023
Earthwork
FiledStatusContractorScope
10/05/2023Signed-offSTEADFAST CONSTRUCTION LLEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/12/2023Pass-Final Fence Non-Directive 14PassView ↗
02/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/29/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/18/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
10/18/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
10/18/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
10/18/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
10/18/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
10/18/2023Mechanical SystemsWILLIAM MONTAGUEspecial
10/18/2023Footing and FoundationWILLIAM MONTAGUEprogress
10/18/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
10/18/2023Structural Wood FrameWILLIAM MONTAGUEprogress
10/18/2023FinalWILLIAM MONTAGUEprogress
10/18/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
10/18/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
10/18/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
10/18/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
10/18/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
10/18/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
10/18/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
10/18/2023Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
10/18/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
10/18/2023Air barrier continuity plan testingWILLIAM MONTAGUEenergy_progress
10/18/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
10/18/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
10/18/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
10/18/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
10/18/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
Latest 25 of 28.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00639847-S2Request digital key ↗
08/24/2026S00639847-S1Request digital key ↗
08/24/2026S00639847-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00639847-P2Open ↗
08/13/2026S00639847-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00639847-I1Open ↗
08/13/2026S00639847-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00639847-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00639847-S1Open ↗
08/24/2026S00639847-I1Open ↗
08/24/2026S00639847-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S00639847-I1Open ↗
08/26/2026S00639847-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S00639847-I1Open ↗
08/26/2026S00639847-I1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00639847-I1Open ↗
08/13/2026S00639847-P2Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00639847-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00639847-I1Open ↗
08/13/2026S00639847-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00639847-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00639847-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00639847-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00639847-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00639847-P2Open ↗
08/13/2026S00639847-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00639847-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00639847-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00639847-P2Open ↗
08/13/2026S00639847-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00639847-P2Open ↗
08/13/2026S00639847-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026S00639847-I1Open ↗
08/24/2026S00639847-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00639847-I1Open ↗