← Back
One family attached or semi-detached
68 APPLEBY AVENUE
STATEN ISLAND · BIN 5175458
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-1Zoning
1,154 sfGross Floor Area
1Units
One family attached or semi-detached · 2,084 sf lot · 0.55 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Floor 32p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
1 job · most recent 06/12/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2023Signed-offV&V DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Unknown unknown 24,000 BTU ×1
Heating
Unknown unknown 40,000 BTU · Furnace ×1
Ventilation
Unknown unknown 80 CFM · Erv ×1
Ducts & Piping
Unknown unknown Ductwork ×1
1 job · most recent 06/12/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/12/2023Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 job · most recent 10/15/2023
General Wiring
FiledStatusContractorScope
10/15/2023CompleteRIDGE ELECTRIC CORP.General Wiring
1 job · most recent 06/12/2023
Wood
FiledStatusContractorScope
06/12/2023Signed-offV&V DEVELOPMENT CORPWood
Building Lifecycle
All (68)Filed (5)Permit Issued (7)Signed Off (3)Inspection (15)Objection (8)Special Inspection (30)
10/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2023
Signed off — New Building
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION FOR ONE FAMILY RESIDENCE
S00640055-S1
12/05/2023
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00784062-I1
10/26/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2023
Signed off — New Building
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION FOR ONE FAMILY RESIDENCE
S00640055-S2
10/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
09/29/2023
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00784062-P1
09/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
09/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Permit issued — Plumbing
S33496018-S1-PL
06/29/2023
Permit issued — Curb Cut
S00640055-S2-CC
06/12/2023
Filed — New Building
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION FOR ONE FAMILY RESIDENCE
S00640055-S2
05/24/2023
Permit issued — Mechanical Systems
S00640055-I1-GC-CX
11/03/2022
Permit issued — Plumbing
S00784062-I1-PL
10/07/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/02/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/01/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/29/2022
Permit issued — Plumbing
S00640055-S1-PL
08/29/2022
Permit issued — Plumbing
S33496018-S1-PL
07/29/2022
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00784062-I1
06/01/2022
Permit issued — Mechanical Systems
S00640055-I1-GC-CX
03/16/2022
Filed — New Building
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION FOR ONE FAMILY RESIDENCE
S00640055-S1
02/28/2022
Objection resolved — Addressed
02/28/2022
Objection resolved — Addressed
02/08/2022
Objection raised — Scope
02/08/2022
Objection resolved — Addressed
02/08/2022
Objection raised — Scope
02/08/2022
Objection resolved — Addressed
02/08/2022
Objection raised — Scope
02/08/2022
Objection raised — Structural
01/25/2022
Filed — New Building
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION FOR ONE FAMILY RESIDENCE
S00640055-I1
01/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Heating Systems
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/05/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Lowest Floor Elevation
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
01/05/2022
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
Latest 60 of 68 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLIAM MONTAGUE ENGINEER309/29/2023
STANLEY M. KREBUSHEVSKI, R.A.203/16/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V&V DEVELOPMENT CORPGeneral Contractor707/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing307/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677309/29/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR09/11/2023
DOB NOWCurb CutSigned-offV&V DEVELOPMENT CORP06/29/2023
DOB NOWMechanical SystemsPermit IssuedV&V DEVELOPMENT CORP05/24/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/03/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/29/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/29/2022
DOB NOWMechanical SystemsPermit IssuedV&V DEVELOPMENT CORP06/01/2022
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/26/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2022Pass-Final PL - UndergroundPassView ↗
09/02/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/03/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
09/24/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
01/05/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
01/05/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)WILLIAM MONTAGUEspecial
01/05/2022Heating SystemsWILLIAM MONTAGUEspecial
01/05/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
01/05/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/05/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
01/05/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
01/05/2022Lowest Floor ElevationWILLIAM MONTAGUEprogress
01/05/2022Structural Wood FrameWILLIAM MONTAGUEprogress
01/05/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
01/05/2022Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
01/05/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
01/05/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
01/05/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
01/05/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
01/05/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
01/05/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
01/05/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
01/05/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
01/05/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
01/05/2022MeteringWILLIAM MONTAGUEenergy_progress
01/05/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
01/05/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
Latest 25 of 32.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00640055-I1Request digital key ↗
08/24/2026S00640055-S2Request digital key ↗
08/24/2026S00640055-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
02/03/2022540212615Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2022540212615Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/24/2022540212615Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00640055-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00640055-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00640055-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
08/25/2026S00784062-P1Open ↗
08/25/2026S00640055-I1Open ↗
08/25/2026S00640055-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00640055-S2Open ↗
08/24/2026S00640055-S1Open ↗
08/24/2026S00640055-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S00640055-I1Open ↗
08/25/2026S00640055-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/24/2022540212615Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2022540212615Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00640055-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00640055-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00640055-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00640055-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00640055-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00640055-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/24/2022540212615Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00640055-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00640055-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00640055-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/03/2022540212615Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2022540212615Open ↗
▸Other Documents8
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/24/2026S00640055-S1Open ↗
08/13/2026S00640055-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
02/03/2022540212615Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/03/2022540212615Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/24/2022540212615Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00640055-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00640055-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00640055-I1Open ↗