← Back
STATEN ISLAND
4 TACOMA STREET
STATEN ISLAND · BIN 5175540
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
StructuralMechanical
Floor 241p · 1 filing · 20 docs
Floor 142p · 1 filing · 20 docs
Basement41p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NNT DEVELOPMENT1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/12/2026
STANLEY M. KREBUSHEVSKI, R.A.606/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NNT DEVELOPMENT CORPGeneral Contractor507/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor108/27/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/12/2026
ISLAND ENGINEERING ASSOCI264506/17/2024
Building Lifecycle
All (34)Filed (7)Permit Issued (5)Signed Off (2)Violation (3)Inspection (11)Special Inspection (6)
08/26/2026
Permit issued — Solar
S01444031-I1-SL
08/12/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01444031-I1
08/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/12/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/11/2026
Special inspection requirement — Final
Walid Abdulla
07/23/2024
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-S2
07/23/2024
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-S1
07/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/21/2024
Permit issued — Curb Cut
S08047485-S2-CC
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2024
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-S2
06/17/2024
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-P3
05/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2024
Permit issued — Foundation
S08047485-I1-GC-CX
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-P2
12/05/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-P1
12/04/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM DURDEN, P.E.
11/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/04/2023
Violation issued (ECB, closed)
Construction
10/04/2023
Violation issued (ECB, closed)
Construction
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/22/2023
Permit issued — Plumbing
S08047485-S1-PL
08/12/2023
Violation issued (ECB, closed)
Construction
06/08/2023
Permit issued — Mechanical Systems
S08047485-I1-GC-CX
02/24/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-S1
12/05/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WTIH NB FILING FOR NEW ONE FAMILY RESIDENCE.
S08047485-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/26/2026
DOB NOWCurb CutSigned-offNNT DEVELOPMENT CORP06/21/2024
DOB NOWFoundationPermit IssuedNNT DEVELOPMENT CORP01/11/2024
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN08/22/2023
DOB NOWMechanical SystemsPermit IssuedNNT DEVELOPMENT CORP06/08/2023
1 job · most recent 06/17/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2024Signed-offNNT DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
__Junk__ AHU-1/CU-1 42,000 BTU · Split System ×1
AHU-2/CU-2 41,500 BTU · Split System ×1
Heating
__Junk__ B-1 160,000 BTU · Boiler ×1
Ventilation
__Junk__ ERV-1 & ERV-2 75 CFM · Erv ×2
Ducts & Piping
__Junk__ CFM 1 CFM · Ductwork ×1
1 job · most recent 06/17/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/17/2024Signed-offMPC PLUMBING & HEATING INGas, Storm, Water/Sanitary
2 jobs · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026CompleteSUNRUN SOLAR ELECTL CORP—
11/03/2023CompleteS.T.K. ELECTRICAL CORP.General Wiring
1 job · most recent 06/17/2024
Wood
FiledStatusContractorScope
06/17/2024Signed-offNNT DEVELOPMENT CORPWood
1 job · most recent 08/12/2026
FiledStatusContractorScope
08/12/2026Permit IssuedSUNRUN INSTALLATION SVC34 panels, 15.3 kw, 357 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/12/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/12/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/11/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/11/2026FinalWalid Abdullaprogress
12/04/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM DURDEN, P.E.special
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S08047485-S2Request digital key ↗
08/21/2026S08047485-P3Request digital key ↗
08/21/2026S08047485-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S08047485-I1Open ↗
08/13/2026S08047485-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S08047485-I1Open ↗
08/13/2026S08047485-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08047485-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S08047485-P3Open ↗
08/21/2026S08047485-S2Open ↗
08/21/2026S08047485-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S08047485-P2Open ↗
08/26/2026S01444031-I1Open ↗
08/26/2026S01444031-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01444031-I1Open ↗
08/26/2026S01444031-I1Open ↗
08/26/2026S01444031-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S08047485-P1Open ↗
08/13/2026S08047485-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S08047485-I1Open ↗
08/13/2026S08047485-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08047485-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08047485-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08047485-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S08047485-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S08047485-P1Open ↗
08/13/2026S08047485-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08047485-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S08047485-P1Open ↗
08/13/2026S08047485-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S08047485-I1Open ↗
08/13/2026S08047485-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S08047485-I1Open ↗
08/21/2026S08047485-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08047485-I1Open ↗