STATEN ISLAND
18 CLIFTON STREET
STATEN ISLAND · BIN 5175630
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
StructuralPlumbingFire Protection
Floor 26p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Basement5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS2404/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS803/21/2025
STANLEY M. KREBUSHEVSKI, R.A.210/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor307/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing307/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472903/21/2025
Building Lifecycle
All (73)Filed (10)Permit Issued (9)Signed Off (4)Violation (2)Inspection (12)Objection (6)Special Inspection (30)
05/18/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S1
05/12/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S4
05/07/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S2
04/30/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S3
04/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/01/2025
Permit issued — Plumbing
S12028972-S2-PL
03/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-P5
03/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
03/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/18/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-P3
03/18/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-P4
03/18/2025
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
03/14/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-P2
02/14/2025
Permit issued — Curb Cut
S00684098-S3-CC
02/10/2025
Permit issued — Plumbing
S00684098-S1-EW-SP
02/10/2025
Permit issued — Plumbing
S00684098-S2-PL
04/26/2024
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S3
03/05/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2024
Permit issued — Mechanical Systems
S00684098-S4-MS
02/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2024
Permit issued — Sprinklers
S00684098-S1-EW-SP
02/02/2024
Permit issued — Plumbing
S00684098-S1-PL
12/11/2023
Objection resolved — Addressed
11/15/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/09/2023
Permit issued — Plumbing
S00684098-S2-PL
11/08/2023
Objection raised — Scope
11/06/2023
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S4
11/06/2023
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BACKFLOW PREVENTER ASSEMBLY. INSTALLATION OF NEW RESIDENTIAL SPRINKLER SYSTEM
S00684098-S2
11/04/2023
Special inspection requirement — Heating Systems
Stanislav Pilipenko
11/04/2023
Special inspection requirement — Maintenance information
Stanislav Pilipenko
11/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
11/04/2023
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
11/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
11/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
11/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/01/2025
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION02/14/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP02/10/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/10/2025
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION03/04/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP02/02/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/02/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/09/2023
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION09/20/2023
1 project · most recent 03/21/2025
Sprinkler System
FiledStatusContractorScope
03/21/2025Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 project · most recent 03/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/21/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 01/29/2024
General Wiring
FiledStatusContractorScope
01/29/2024CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
1 project · most recent 03/21/2025
Wood
FiledStatusContractorScope
03/21/2025Signed-offBEYER CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/14/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
03/20/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
03/20/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/20/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/20/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/20/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/20/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
03/20/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/18/2025Sprinkler SystemsStanislav Pilipenkospecial
03/18/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/18/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/18/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/18/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
03/18/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/18/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/18/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/18/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
11/04/2023Heating SystemsStanislav Pilipenkospecial
11/04/2023Maintenance informationStanislav Pilipenkoenergy_progress
11/04/2023Energy Code Compliance InspectionsStanislav Pilipenkoprogress
11/04/2023Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
11/04/2023HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
11/04/2023HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
11/04/2023HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
Latest 25 of 51.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026S00684098-P5Request digital key ↗
08/22/2026S00684098-P4Request digital key ↗
08/22/2026S00684098-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026S00684098-I1Open ↗
08/13/2026S00684098-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026S00684098-I1Open ↗
08/13/2026S00684098-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S00684098-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/22/2026S00684098-S2Open ↗
08/22/2026S00684098-P5Open ↗
08/22/2026S00684098-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026S00684098-S2Open ↗
08/31/2026S00684098-P1Open ↗
08/31/2026S00684098-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026S00684098-S2Open ↗
08/31/2026S00684098-P1Open ↗
08/31/2026S00684098-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/15/2026S00684098-P1Open ↗
08/15/2026S00684098-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026S00684098-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026S00684098-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S00684098-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026S00684098-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026S00684098-I1Open ↗
08/13/2026S00684098-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026S00684098-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/15/2026S00684098-I1Open ↗
08/13/2026S00684098-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026S00684098-I1Open ↗
08/13/2026S00684098-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026S00684098-P1Open ↗
08/15/2026S00684098-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026S00684098-I1Open ↗