Two family frame
88 HOOKER PLACE
STATEN ISLAND · BIN 5175722
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,432 sfGross Floor Area
2Units
Two family frame · 3,585 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 212p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
1 job · most recent 05/04/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2023Signed-offZAIM CONTRACTOR CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Ameristar M4AC3024D1000AA 24,000 BTU · Condensing Unit ×1
M4AC3048D1000AA 48,000 BTU · Condensing Unit ×1
Heating
Ameristar A801X060BM4SAC/A801X100BM4SAC 160,000 BTU · Furnace ×2
Ventilation
Trane N/A 100 CFM · Erv ×2
1 job · most recent 05/04/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/04/2023Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 job · most recent 12/15/2022
General Wiring
FiledStatusContractorScope
12/15/2022CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
Building Lifecycle
All (63)Filed (6)Permit Issued (8)Signed Off (4)Inspection (15)Special Inspection (30)
05/11/2023
Signed off — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-S2
05/04/2023
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-P1
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Heating Systems
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Heating Systems
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
04/28/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
04/18/2023
Signed off — Alteration
S00773574-I1
04/18/2023
Signed off — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-S1
04/18/2023
Signed off — Alteration
residential sprinkler plans
S00787910-I1
04/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/06/2023
Permit issued — Curb Cut
S00773574-I1-CC
04/03/2023
Filed — Alteration
S00773574-I1
03/31/2023
Permit issued — Mechanical Systems
S00783845-S2-MS
03/28/2023
Permit issued — Plumbing
S00787910-I1-PL
03/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2023
Permit issued — Plumbing
S00787910-I1-EW-SP
03/13/2023
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
03/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-S2
10/28/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/26/2022
Permit issued — Plumbing
S00787910-I1-EW-SP
10/26/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Permit issued — Plumbing
S90977723-S1-PL
10/24/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/19/2022
Permit issued — Plumbing
S00783845-S1-PL
09/21/2022
Permit issued — Foundation
S00783845-I1-GC-CX
09/06/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-S1
09/06/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
09/06/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
09/06/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
09/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
09/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
09/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
08/31/2022
Filed — Alteration
residential sprinkler plans
S00787910-I1
08/02/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNIT FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00783845-I1
Latest 60 of 63 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S I NORTHSHORE ENTERPRISES1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS205/04/2023
WILLIAM MONTAGUE ENGINEER204/03/2023
STANLEY M. KREBUSHEVSKI, R.A.209/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor507/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection207/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677505/04/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC04/06/2023
DOB NOWMechanical SystemsSigned-offSUFFOLK CONSTRUCT CO. INC03/31/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/28/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP03/14/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP10/26/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/24/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC10/19/2022
DOB NOWFoundationPermit IssuedSUFFOLK CONSTRUCT CO. INC09/21/2022
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/13/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
03/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2022Pass-Final PL - UndergroundPassView ↗
10/26/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/24/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/01/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/04/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/04/2023Mechanical SystemsWILLIAM MONTAGUEspecial
05/04/2023Heating SystemsWILLIAM MONTAGUEspecial
05/04/2023FinalWILLIAM MONTAGUEprogress
05/04/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/04/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
05/04/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
05/04/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
05/04/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
05/04/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
05/04/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
05/04/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
04/28/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/28/2023Heating SystemsWILLIAM MONTAGUEspecial
04/28/2023Mechanical SystemsWILLIAM MONTAGUEspecial
04/28/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
04/28/2023FinalWILLIAM MONTAGUEprogress
04/28/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
04/28/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
04/28/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
04/28/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
04/28/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
04/28/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
04/28/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
09/06/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
Latest 25 of 32.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00787910-I1Request digital key ↗
08/23/2026S00773574-I1Request digital key ↗
08/23/2026S00783845-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/12/2022540216684Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/12/2022540216684Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/12/2022540216684Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00783845-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00783845-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00783845-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature6
09/20/2026S00783845-P1Open ↗
08/29/2026S00783845-S2Open ↗
08/27/2026S00787910-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00787910-I1Open ↗
08/23/2026S00773574-I1Open ↗
08/23/2026S00783845-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/20/2026S00783845-P1Open ↗
09/20/2026S00783845-P1Open ↗
08/29/2026S00783845-S2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/12/2022540216684Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/12/2022540216684Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00783845-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00783845-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00783845-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00783845-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00783845-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00783845-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026S00783845-S1Open ↗
08/13/2026S00783845-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00783845-S1Open ↗
08/13/2026S00783845-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/12/2022540216684Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00783845-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
07/13/2022540216684Open ↗
04/12/2022540216684Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/12/2022540216684Open ↗
▸BISBOROUGH INTAKE FORM1
03/27/2023540216684Open ↗
▸Other Documents6
▸BISWAIVER OF CURB ALIGNMENT1
07/13/2022540216684Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/12/2022540216684Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00783845-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026S00783845-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00783845-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00783845-I1Open ↗