← Back
Two stories - detached, small or mid-size
15 BELL STREET
STATEN ISLAND · BIN 5175773
💬 Discuss this project
0Year Built
2Stories
A1Building Class
R3AZoning
1,424 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,400 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 1 filing · 6 docs
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR103/24/2025
JOSEPH M. MORACE, A.I.A., ARCHITECT408/15/2023
ISLAND ENGINEERING ASSOCIATES102/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor603/21/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475103/24/2025
ISLAND ENGINEERING ASSOCI264208/15/2023
Building Lifecycle
All (59)Filed (6)Permit Issued (6)Signed Off (4)Violation (2)Inspection (9)Objection (2)Special Inspection (30)
06/06/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01196474-I1
03/27/2025
Permit issued — Solar
S01196474-I1-SL
03/24/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01196474-I1
03/17/2025
Special inspection requirement — Final
Andres Arias Londono
03/17/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
03/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
08/23/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
08/15/2023
Filed — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-P1
08/11/2023
Signed off — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-S1
08/11/2023
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00672434-I1
08/11/2023
Signed off — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-S2
08/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/21/2023
Permit issued — Foundation
S00671623-I1-GC-CX
04/06/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/14/2023
Violation issued (ECB, closed)
Construction
02/14/2023
Violation issued (ECB, closed)
Construction
01/04/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/20/2022
Permit issued — Plumbing
S00671623-S1-PL
12/20/2022
Permit issued — Plumbing
S00672434-I1-PL
09/21/2022
Permit issued — Curb Cut
S00671623-S2-CC
09/15/2022
Filed — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-S1
09/15/2022
Filed — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-S2
07/22/2022
Permit issued — Structural
S00671623-I1-GC-CX
06/27/2022
Objection raised — Scope
06/27/2022
Objection resolved — Addressed
06/07/2022
Filed — New Building
PROPOSED TWO STORY, ONE FAMILY DWELLING W/ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00671623-I1
02/01/2022
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00672434-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY03/27/2025
DOB NOWFoundationPermit IssuedWALLACE AVENUE CONSTR LLC07/21/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.12/20/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.12/20/2022
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC09/21/2022
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC07/22/2022
1 project · most recent 08/15/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/15/2023Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
2 projects · most recent 03/23/2025
General Wiring
FiledStatusContractorScope
03/23/2025CompleteBERGER QUALITY ELEC'L CON—
01/29/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 08/15/2023
Concrete Wood
FiledStatusContractorScope
08/15/2023Permit IssuedWALLACE AVENUE CONSTR LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/06/2023Pass-Final PL - UndergroundPassView ↗
03/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/04/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
03/17/2025FinalAndres Arias Londonoprogress
03/17/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
03/17/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
03/17/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
03/17/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
08/23/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
08/23/2023Structural Wood FrameWILLIAM DURDEN, P.E.progress
08/23/2023Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
08/23/2023Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
08/23/2023FinalWILLIAM DURDEN, P.E.progress
08/23/2023Footing and FoundationWILLIAM DURDEN, P.E.progress
08/23/2023Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/23/2023HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
08/23/2023Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
08/23/2023Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
08/23/2023Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
08/23/2023Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
08/23/2023Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
08/23/2023Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
08/23/2023Fenestration areasWILLIAM DURDEN, P.E.energy_progress
08/23/2023Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
08/23/2023Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
08/23/2023Maintenance informationWILLIAM DURDEN, P.E.energy_progress
08/23/2023HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
08/23/2023Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 59.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00672434-I1Request digital key ↗
08/22/2026S00671623-P1Request digital key ↗
08/22/2026S00671623-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00671623-I1Open ↗
08/13/2026S00671623-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00671623-I1Open ↗
08/13/2026S00671623-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00671623-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S01196474-I1Open ↗
09/02/2026S01196474-I1Open ↗
08/30/2026S00671623-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026S00671623-S1Open ↗
08/22/2026S00671623-I1Open ↗
08/22/2026S00671623-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026S01196474-I1Open ↗
08/30/2026S00671623-I1Open ↗
08/30/2026S00671623-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00671623-I1Open ↗
08/13/2026S00671623-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00671623-I1Open ↗
08/13/2026S00671623-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00671623-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00671623-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00671623-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00671623-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00671623-I1Open ↗
08/13/2026S00671623-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00671623-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00671623-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01196474-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00671623-P1Open ↗
08/13/2026S00671623-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00671623-P1Open ↗
08/13/2026S00671623-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00671623-P1Open ↗
08/15/2026S00671623-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00671623-I1Open ↗