Primarily 2 family with 1 store or office
CASTELTON AVENUE
STATEN ISLAND · BIN 5175920
💬 Discuss this project
2023Year Built
3Stories
S2Building Class
R3XZoning
3,728 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: GISELLE PROPERTIES, LLC · 3,954 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 38p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1707/08/2026
HAVEN PROPERTY MANAGEMENT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT607/26/2024
ISLAND ENGINEERING ASSOCIATES207/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor603/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing307/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264407/26/2024
Building Lifecycle
All (55)Filed (8)Permit Issued (7)Signed Off (3)Violation (2)Inspection (5)Special Inspection (30)
08/20/2024
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Lighting controls
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Masonry
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Lighting in dwelling units
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Air barrier continuity plan testing
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
08/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
08/07/2024
Signed off — Alteration
FILED HEREWITH; FIRE SPRINKLER PLAN.
S00807419-I1
07/31/2024
Signed off — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-S2
07/31/2024
Signed off — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-S1
07/26/2024
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-P3
07/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2024
Filed — Alteration
FILED HEREWITH; FIRE SPRINKLER PLAN.
S00807419-P1
07/08/2024
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-P2
06/26/2024
Permit issued — Plumbing
S00823488-S1-PL
06/17/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/13/2024
Permit issued — Structural
S00823488-I1-GC-CX
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/18/2024
Permit issued — Plumbing
S00807419-I1-EW-SP
01/18/2024
Permit issued — Plumbing
S00807419-I1-PL
12/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/25/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/19/2023
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-P1
06/26/2023
Permit issued — Plumbing
S00823488-S1-PL
06/13/2023
Permit issued — Curb Cut
S00823488-S2-CC
06/07/2023
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-S2
05/24/2023
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-S1
05/19/2023
Permit issued — General Construction
S00823488-I1-GC-CX
02/03/2023
Filed — New Building
PROPOSED INSTALLATION OF 8'-6" WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17'-0" FOR NEW MIXED USE BUILDING.
S00823488-I1
01/04/2023
Filed — Alteration
FILED HEREWITH; FIRE SPRINKLER PLAN.
S00807419-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/26/2024
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC05/13/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP01/18/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR01/18/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/26/2023
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC06/13/2023
DOB NOWGeneral ConstructionPermit IssuedWALLACE AVENUE CONSTR LLC05/19/2023
1 project · most recent 07/26/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/26/2024Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 02/04/2024
General Wiring
FiledStatusContractorScope
02/04/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 07/26/2024
Concrete Masonry Wood
FiledStatusContractorScope
07/26/2024Signed-offFLOW-RIGHT PLBG & HTG CORConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/20/2024Lighting in dwelling unitsWILLIAM DURDEN, P.E.energy_progress
08/20/2024Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
08/20/2024Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
08/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
08/20/2024MasonryWILLIAM DURDEN, P.E.special
08/20/2024Structural Steel - DetailsWILLIAM DURDEN, P.E.special
08/20/2024Subgrade InspectionsWILLIAM DURDEN, P.E.special
08/20/2024Structural Steel - WeldingWILLIAM DURDEN, P.E.special
08/20/2024Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
08/20/2024Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
08/20/2024Footing and FoundationWILLIAM DURDEN, P.E.progress
08/20/2024Structural Wood FrameWILLIAM DURDEN, P.E.progress
08/20/2024FinalWILLIAM DURDEN, P.E.progress
08/20/2024Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
08/20/2024Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
08/20/2024Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
08/20/2024Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/20/2024Fenestration areasWILLIAM DURDEN, P.E.energy_progress
08/20/2024HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
08/20/2024Air barrier continuity plan testingWILLIAM DURDEN, P.E.energy_progress
08/20/2024HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
08/20/2024Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
08/20/2024Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
08/20/2024Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
08/20/2024Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 66.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S00823488-P1Request digital key ↗
08/23/2026S00823488-S2Request digital key ↗
08/23/2026S00823488-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/18/2024540239909Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/11/2023540239909Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00823488-P3Open ↗
08/13/2026S00823488-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00823488-I1Open ↗
08/13/2026S00823488-P3Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/08/2022540239909Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/08/2022540239909Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00823488-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00823488-I1Open ↗
09/01/2026S00823488-I1Open ↗
09/01/2026S00823488-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S00823488-S2Open ↗
08/23/2026S00823488-S1Open ↗
08/23/2026S00823488-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00823488-I1Open ↗
09/01/2026S00823488-I1Open ↗
08/28/2026S00823488-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/08/2022540239909Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/08/2022540239909Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00823488-P3Open ↗
08/13/2026S00823488-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00823488-I1Open ↗
08/13/2026S00823488-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00823488-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00823488-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00823488-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00823488-P3Open ↗
08/13/2026S00823488-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/08/2022540239909Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00823488-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/11/2023540239909Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
01/11/2023540239909Open ↗
11/08/2022540239909Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00823488-P3Open ↗
08/13/2026S00823488-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00823488-I1Open ↗
08/13/2026S00823488-P3Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026S00823488-I1Open ↗
08/23/2026S00823488-P3Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/11/2023540239909Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00823488-I1Open ↗