← Back
STATEN ISLAND
150 HILLCREST STREET
STATEN ISLAND · BIN 5176042
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1 filing · 20 docs
1 job · most recent 12/04/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/04/2023Signed-offSUPERIOR PLUMBING & HEATIGas, Storm, Water/Sanitary
1 job · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023CompleteS.T.K. ELECTRICAL CORP.General Wiring
1 job · most recent 12/04/2023
Concrete Wood
FiledStatusContractorScope
12/04/2023Signed-offA. FONTANA & SONS LLCConcrete, Wood
Building Lifecycle
All (6)Permit Issued (6)
10/17/2023
Permit issued — Curb Cut
S00845609-S2-CC
08/01/2023
Permit issued — Plumbing
S00897001-I1-PL
05/25/2023
Permit issued — Plumbing
S00845609-S1-PL
05/09/2023
Permit issued — Foundation
S00845609-I1-GC
05/09/2023
Permit issued — General Construction
S00845609-I1-ST
05/08/2023
Permit issued — Structural
S00845609-I1-FO
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWRENCE MANDARINO ARCHITECT512/04/2023
DESIGN BUILD SI, INC.107/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP303/21/2026
A+ EXPEDITING INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. FONTANA & SONS LLCGeneral Contractor1203/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing207/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA. FONTANA & SONS LLC10/17/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI08/01/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI05/25/2023
DOB NOWFoundationPermit IssuedA. FONTANA & SONS LLC05/09/2023
DOB NOWGeneral ConstructionSigned-offA. FONTANA & SONS LLC05/09/2023
DOB NOWStructuralSigned-offA. FONTANA & SONS LLC05/08/2023
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/27/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/04/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLawrence Mandarinospecial
12/04/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
12/04/2023Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
12/04/2023Energy Code Compliance InspectionsLawrence Mandarinoprogress
12/04/2023HVAC-R and service water heating system controlsLawrence Mandarinoenergy_progress
12/04/2023Permanent certificateLawrence Mandarinoenergy_progress
12/04/2023MeteringLawrence Mandarinoenergy_progress
12/04/2023HVAC-R and service water piping design and insulationLawrence Mandarinoenergy_progress
12/04/2023Maintenance informationLawrence Mandarinoenergy_progress
12/04/2023HVAC-R and service water heating equipmentLawrence Mandarinoenergy_progress
12/04/2023Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
12/04/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLawrence Mandarinospecial
12/04/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
12/04/2023Energy Code Compliance InspectionsLawrence Mandarinoprogress
12/04/2023HVAC-R and service water heating equipmentLawrence Mandarinoenergy_progress
12/04/2023Maintenance informationLawrence Mandarinoenergy_progress
12/04/2023HVAC-R and service water heating system controlsLawrence Mandarinoenergy_progress
12/04/2023HVAC-R and service water piping design and insulationLawrence Mandarinoenergy_progress
12/04/2023MeteringLawrence Mandarinoenergy_progress
12/04/2023Permanent certificateLawrence Mandarinoenergy_progress
11/03/2023Concrete - Cast-In-PlaceLawrence Mandarinospecial
11/03/2023Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
11/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLawrence Mandarinospecial
11/03/2023Subgrade InspectionsLawrence Mandarinospecial
11/03/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
Latest 25 of 45.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026S00897001-I1Request digital key ↗
08/22/2026S00845609-P2Request digital key ↗
08/22/2026S00845609-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00845609-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S00845609-S1Open ↗
09/01/2026S00845609-S1Open ↗
09/01/2026S00845609-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S00897001-I1Open ↗
08/22/2026S00845609-S1Open ↗
08/22/2026S00845609-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00845609-S1Open ↗
09/01/2026S00845609-S1Open ↗
09/01/2026S00845609-P2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00845609-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00845609-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00845609-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00845609-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00845609-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00845609-I1Open ↗
08/13/2026S00845609-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00845609-I1Open ↗