← Back
STATEN ISLAND
7383 AMBOY ROAD
STATEN ISLAND · BIN 5176100
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureFire ProtectionCivil
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1007/08/2026
WALLACE AVENUE CONST.LLC603/22/2026
FIVE KIDS PROPERTY MANAGEMENT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT604/02/2025
ISLAND ENGINEERING ASSOCIATES301/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor404/09/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
DUO PLBG. & HTG. CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264604/02/2025
Building Lifecycle
All (62)Filed (9)Permit Issued (6)Signed Off (3)Inspection (12)Objection (2)Special Inspection (30)
05/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2025
Filed — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-P3
03/31/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Masonry
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Structural Cold-Formed Steel
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Lighting controls
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Shutoff dampers
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Metering
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Exterior lighting power
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
03/31/2025
Special inspection requirement — Wood – Seismic Resistance
03/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2025
Permit issued — General Construction
S00907709-I1-GC-CX
02/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Signed off — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-S1
02/18/2025
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00917362-I1
02/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/06/2025
Signed off — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-S2
02/03/2025
Filed — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-P2
01/31/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00917362-P2
01/30/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2024
Permit issued — Curb Cut
S00907709-S2-CC
12/20/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-S2
11/01/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-P1
09/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/15/2024
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00917362-P1
05/21/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/09/2024
Permit issued — Plumbing
S00917362-I1-EW-SP
05/09/2024
Permit issued — Sprinklers
S00917362-I1-PL
05/08/2024
Permit issued — Plumbing
S00907709-S1-PL
04/02/2024
Permit issued — Earth Work
S00907709-I1-GC-CX
03/13/2024
Objection resolved — Addressed
12/14/2023
Filed — New Building
PROPOSED INSTALLATION OF NEW 10' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING.
S00907709-S1
09/11/2023
Objection raised — Scope
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWALLACE AVENUE CONSTR LLC03/05/2025
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC12/30/2024
DOB NOWPlumbingSigned-offDUO PLBG. & HTG. CORP05/09/2024
DOB NOWSprinklersSigned-offDUO PLUMBING & HTG CORP.05/09/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.05/08/2024
DOB NOWEarth WorkPermit IssuedWALLACE AVENUE CONSTR LLC04/02/2024
1 project · most recent 04/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2025Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 03/12/2025
General Wiring
FiledStatusContractorScope
03/12/2025CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 04/02/2025
Concrete Masonry Wood
FiledStatusContractorScope
04/02/2025Permit IssuedWALLACE AVENUE CONSTR LLCConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2024Pass-Final PL - UndergroundPassView ↗
05/21/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
03/31/2025Wood – Seismic Resistance—special
03/31/2025Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
03/31/2025Exterior Insulation and Finish Systems (EIFS)WILLIAM DURDEN, P.E.special
03/31/2025Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
03/31/2025MasonryWILLIAM DURDEN, P.E.special
03/31/2025Mechanical SystemsWILLIAM DURDEN, P.E.special
03/31/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
03/31/2025Structural Cold-Formed SteelWILLIAM DURDEN, P.E.special
03/31/2025Structural Steel - DetailsWILLIAM DURDEN, P.E.special
03/31/2025Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
03/31/2025Structural Steel - WeldingWILLIAM DURDEN, P.E.special
03/31/2025Subgrade InspectionsWILLIAM DURDEN, P.E.special
03/31/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
03/31/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
03/31/2025FinalWILLIAM DURDEN, P.E.progress
03/31/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
03/31/2025Footing and FoundationWILLIAM DURDEN, P.E.progress
03/31/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
03/31/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
03/31/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
03/31/2025Lighting controlsWILLIAM DURDEN, P.E.energy_progress
03/31/2025Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
03/31/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
03/31/2025Shutoff dampersWILLIAM DURDEN, P.E.energy_progress
03/31/2025MeteringWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 111.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026S00917362-P2Request digital key ↗
08/22/2026S00917362-I1Request digital key ↗
08/22/2026S00917362-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00907709-P1Open ↗
08/13/2026S00907709-P3Open ↗
08/13/2026S00907709-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00907709-I1Open ↗
08/13/2026S00907709-P1Open ↗
08/13/2026S00907709-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00907709-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature12
09/21/2026S00917362-I1Open ↗
09/18/2026S00907709-P1Open ↗
09/18/2026S00907709-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026S00907709-S1Open ↗
08/19/2026S00907709-P3Open ↗
08/19/2026S00907709-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/18/2026S00907709-P1Open ↗
09/18/2026S00907709-P1Open ↗
09/13/2026S00907709-P3Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00907709-P1Open ↗
08/13/2026S00907709-P3Open ↗
08/13/2026S00907709-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00907709-I1Open ↗
08/13/2026S00907709-P1Open ↗
08/13/2026S00907709-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00907709-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00907709-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00907709-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S00907709-I1Open ↗
08/13/2026S00907709-P3Open ↗
08/13/2026S00907709-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00907709-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026S00907709-I1Open ↗
08/13/2026S00907709-P1Open ↗
08/13/2026S00907709-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00907709-P3Open ↗
08/13/2026S00907709-I1Open ↗
08/13/2026S00907709-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026S00907709-P3Open ↗
08/19/2026S00907709-P1Open ↗
08/19/2026S00907709-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00907709-I1Open ↗