← Back
STATEN ISLAND
54 KNESEL STREET
STATEN ISLAND · BIN 5176109
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionCivil
Floor 23p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDLE ESTATES504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WALID ABDULLA111/17/2025
TONY SAYAD ARCHITECT603/04/2025
C&P DESIGN CONSULTANTS212/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIDLE ESTATES INCGeneral Contractor804/09/2026
DV PLUMBING INCPlumbing307/08/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/17/2025
C&P DESIGN CONSULTANT8472603/04/2025
SRA PLANNING & EXPEDITING5677202/10/2025
Building Lifecycle
All (71)Filed (9)Permit Issued (11)Signed Off (7)Inspection (12)Objection (2)Special Inspection (30)
04/21/2026
Signed off — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-I1
04/07/2026
Signed off — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-S2
04/07/2026
Signed off — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-S4
03/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/15/2026
Signed off — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-S1
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/18/2026
Signed off — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-S3
02/12/2026
Permit issued — Plumbing
S00923227-S2-PL
01/06/2026
Signed off — Alteration
S01319580-I1
11/19/2025
Permit issued — Solar
S01319580-I1-SL
11/17/2025
Filed — Alteration
S01319580-I1
03/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
03/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
03/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Air barrier continuity plan testing
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
03/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Final
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
03/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Metering
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
03/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
03/04/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-P2
02/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/10/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-P1
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/31/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Signed off — Alteration
PROPOSED 8 FT. CHAIN LINK CONSTRUCTION FENCE & ACCESS GATES ALONG PROPERTY LINES IN CONJUNCTION WITH NEW TWO-FAMILY RESIDENCE TO BE CONSTRUCTED ON THIS LOT- ALSO APPLIES TO 54GAR KNESEL STREET, 50 KNESEL STREET AND 50GAR KNESEL STREET
S00948242-I1
12/04/2024
Permit issued — Structural
S00923227-I1-GC-CX
11/25/2024
Permit issued — Curb Cut
S00923227-S1-CC
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2024
Permit issued — Plumbing
S00923227-S4-PL
03/05/2024
Permit issued — Plumbing
S00923227-S4-EW-SP
03/04/2024
Permit issued — Plumbing
S00923227-S2-PL
12/21/2023
Permit issued — Mechanical Systems
S00923227-S3-MS
12/13/2023
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence filed under this address.
S00923227-S4
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDV PLUMBING INC02/12/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/19/2025
DOB NOWStructuralPermit IssuedBRIDLE ESTATES INC12/04/2024
DOB NOWCurb CutSigned-offBRIDLE ESTATES INC11/25/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/05/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP03/05/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWMechanical SystemsSigned-offBRIDLE ESTATES INC12/21/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/05/2023
DOB NOWEarth WorkPermit IssuedBRIDLE ESTATES INC11/27/2023
DOB NOWConstruction FenceSigned-offBRIDLE ESTATES INC11/15/2023
1 project · most recent 03/04/2025
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2025Permit IssuedBRIDLE ESTATES INCAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Rheem UNIT 1 OUTDOOR: RA13NZ36AJ1NA UNIT 2 OUTDOOR: RA13NZ36AJ1NA UNIT 1 INDOOR: RH1PZ3617STANNA UNIT 2 INDOOR: RH1PZ3617STANNA 36 BTU · Split System ×2
Heat / Cool
Gree OUTDOOR UNIT: 3VIR12HP230V1AO INDOOR UNIT: 3VIR12HP230V1BH 17,400 BTU · Heat Pump Outdoor ×1
Heating
Triangle Tube Instinct Combi 199 143,000 BTU · Boiler ×1
Ventilation
Broan-Nutone Unit 1 (ERV-1 & ERV-2): BROAN B130E65RT Unit 2 (ERV-3): PANASONIC FV-04VE1 70 CFM · Erv ×3
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 03/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/04/2025Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025CompleteSUNRUN SOLAR ELECTL CORP—
05/28/2024CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
1 project · most recent 03/04/2025
Wood
FiledStatusContractorScope
03/04/2025Signed-offDV PLUMBING INCWood
1 project · most recent 03/04/2025
Earthwork
FiledStatusContractorScope
03/04/2025Signed-offDV PLUMBING INCEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
03/20/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
03/20/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
03/20/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/20/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
03/20/2025Fenestration areasStanislav Pilipenkoenergy_progress
03/20/2025FireplacesStanislav Pilipenkoenergy_progress
03/20/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/20/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
03/20/2025Air barrier continuity plan testingStanislav Pilipenkoenergy_progress
03/20/2025Exterior Insulation and Finish Systems (EIFS)Stanislav Pilipenkospecial
03/20/2025Subgrade InspectionsStanislav Pilipenkospecial
03/20/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
03/20/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
03/20/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
03/20/2025Structural Wood FrameStanislav Pilipenkoprogress
03/20/2025FinalStanislav Pilipenkoprogress
03/20/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
03/20/2025Footing and FoundationStanislav Pilipenkoprogress
03/20/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/20/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/20/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/20/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
03/20/2025Interior lighting powerStanislav Pilipenkoenergy_progress
03/20/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
Latest 25 of 40.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026S00948242-I1Request digital key ↗
08/22/2026S00923227-S1Request digital key ↗
08/22/2026S00923227-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00923227-I1Open ↗
08/13/2026S00923227-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00923227-I1Open ↗
08/13/2026S00923227-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00923227-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026S00948242-I1Open ↗
08/22/2026S00923227-P2Open ↗
08/22/2026S00923227-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026S00923227-I1Open ↗
08/28/2026S00923227-I1Open ↗
08/28/2026S00923227-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S00923227-I1Open ↗
08/28/2026S00923227-I1Open ↗
08/26/2026S00923227-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00923227-P2Open ↗
08/13/2026S00923227-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00923227-I1Open ↗
08/13/2026S00923227-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00923227-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00923227-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00923227-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S00923227-I1Open ↗
08/13/2026S00923227-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00923227-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01319580-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00923227-P2Open ↗
08/13/2026S00923227-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00923227-P2Open ↗
08/13/2026S00923227-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00923227-P2Open ↗
08/22/2026S00923227-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00923227-I1Open ↗