STATEN ISLAND
50 KNESEL STREET
STATEN ISLAND · BIN 5176110
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 218p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Basement21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDLE ESTATES INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TONY SAYAD ARCHITECT607/29/2025
PARKER AND WEST ENGINEERING, PLLC106/12/2025
C&P DESIGN CONSULTANTS212/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIDLE ESTATES INCGeneral Contractor803/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
DV PLUMBING INCPlumbing207/08/2026
CATELLO ELEC'L CONT., INCElectrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472707/29/2025
PARKER AND WEST ENGINEERI5272106/12/2025
SRA PLANNING & EXPEDITING5677201/22/2025
Building Lifecycle
All (68)Filed (9)Permit Issued (9)Signed Off (5)Inspection (13)Objection (2)Special Inspection (30)
07/30/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
07/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
07/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Final
Stanislav Pilipenko
07/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
07/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Metering
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
07/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
07/29/2025
Filed — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-P3
07/29/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
07/29/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
07/22/2025
Signed off — Alteration
S01239066-I1
06/17/2025
Permit issued — Solar
S01239066-I1-SL
06/12/2025
Filed — Alteration
S01239066-I1
04/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/11/2025
Signed off — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S4
03/04/2025
Filed — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-P2
02/21/2025
Signed off — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S3
02/21/2025
Signed off — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S2
02/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/19/2025
Signed off — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S5
01/22/2025
Filed — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-P1
01/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Permit issued — General Construction
S00923209-I1-GC-CX
11/22/2024
Permit issued — Curb Cut
S00923209-S2-CC
04/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2024
Permit issued — Sprinklers
S00923209-S5-PL
03/05/2024
Permit issued — Sprinklers
S00923209-S5-EW-SP
03/04/2024
Permit issued — Plumbing
S00923209-S3-PL
12/21/2023
Permit issued — Mechanical Systems
S00923209-S4-MS
12/13/2023
Filed — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S4
12/13/2023
Filed — New Building
CONSTRUCT NEW 3-STORY TWO-FAMILY DETACHED RESIDENCE WITH OFF-STREET PARKING FOR 2 CARS
S00923209-S5
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/17/2025
DOB NOWGeneral ConstructionPermit IssuedBRIDLE ESTATES INC12/04/2024
DOB NOWCurb CutSigned-offBRIDLE ESTATES INC11/22/2024
DOB NOWSprinklersSigned-offDV PLUMBING INC03/05/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP03/05/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWMechanical SystemsSigned-offBRIDLE ESTATES INC12/21/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/05/2023
DOB NOWStructuralPermit IssuedBRIDLE ESTATES INC11/27/2023
1 project · most recent 07/29/2025
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025Permit IssuedBRIDLE ESTATES INCAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Rheem AHU-1: RH1PZ3617STANNA - AHU-2: RH1PZ3617STANNA - CU-1: RA13NZ36AJ1NA - CU-2: RA13NZ36AJ1NA 36 BTU · Split System ×2
Heat / Cool
Gree AHU: N/A - CU: 4LIV12HP230V1AO - 17,400 BTU · Heat Pump Outdoor ×1
Heating
Triangle Tube INSTINCT COMBI 199 - 143,000 BTU · Boiler ×1
Ventilation
Broan ERV-1: N/A - REPLACED WITH BIGGER ERV-2 - ERV-2: B130E65RS - ERV-3: N/A 70 CFM · Erv ×3
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 07/29/2025
Sprinkler System
FiledStatusContractorScope
07/29/2025Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 project · most recent 07/29/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/29/2025Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 06/12/2025
General Wiring
FiledStatusContractorScope
06/12/2025CompleteSUNRUN SOLAR ELECTL CORP—
02/19/2025CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
1 project · most recent 07/29/2025
Wood
FiledStatusContractorScope
07/29/2025Permit IssuedBRIDLE ESTATES INCWood
1 project · most recent 07/29/2025
Earthwork
FiledStatusContractorScope
07/29/2025Permit IssuedBRIDLE ESTATES INCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/16/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
07/30/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
07/30/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
07/30/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
07/30/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
07/30/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
07/30/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
07/30/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
07/30/2025Maintenance informationStanislav Pilipenkoenergy_progress
07/30/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
07/30/2025Fenestration areasStanislav Pilipenkoenergy_progress
07/30/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
07/30/2025MeteringStanislav Pilipenkoenergy_progress
07/30/2025Permanent certificateStanislav Pilipenkoenergy_progress
07/30/2025FireplacesStanislav Pilipenkoenergy_progress
07/30/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
07/30/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
07/30/2025Interior lighting powerStanislav Pilipenkoenergy_progress
07/30/2025FinalStanislav Pilipenkoprogress
07/30/2025Footing and FoundationStanislav Pilipenkoprogress
07/30/2025Structural Wood FrameStanislav Pilipenkoprogress
07/30/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
07/30/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
07/30/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
07/30/2025Subgrade InspectionsStanislav Pilipenkospecial
Latest 25 of 118.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026S00923209-P3Request digital key ↗
08/22/2026S00923209-P2Request digital key ↗
08/22/2026S00923209-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
11/06/2023540255409Open ↗
08/07/2023540255409Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/07/2023540255409Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00923209-P2Open ↗
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P2Open ↗
08/13/2026S00923209-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00923209-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026S00923209-S5Open ↗
09/01/2026S00923209-P1Open ↗
09/01/2026S00923209-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00923209-P1Open ↗
09/01/2026S00923209-P1Open ↗
08/28/2026S00923209-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026S00923209-S5Open ↗
08/22/2026S00923209-P3Open ↗
08/22/2026S00923209-P2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2023540255409Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/07/2023540255409Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00923209-P3Open ↗
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P2Open ↗
08/13/2026S00923209-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00923209-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00923209-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00923209-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P2Open ↗
08/13/2026S00923209-P3Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/07/2023540255409Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00923209-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
11/06/2023540255409Open ↗
08/07/2023540255409Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01239066-I1Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/06/2023540255409Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/07/2023540255409Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P3Open ↗
08/13/2026S00923209-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00923209-P2Open ↗
08/13/2026S00923209-I1Open ↗
08/13/2026S00923209-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00923209-P3Open ↗
08/22/2026S00923209-P2Open ↗
08/22/2026S00923209-I1Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
11/06/2023540255409Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
11/06/2023540255409Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/06/2023540255409Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/07/2023540255409Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00923209-I1Open ↗