Two family frame
281 NORWAY AVENUE
STATEN ISLAND · BIN 5176128
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3XZoning
3,135 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 6,000 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 338p · 1 filing · 20 docs
Floor 238p · 1 filing · 20 docs
Floor 139p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PERCIBALLI INDUSTRIES2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWRENCE MANDARINO ARCHITECT809/11/2024
ETRECTE LLC207/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP703/21/2026
J B I CONSTRUCTION GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATCON DEVELOPMENT LLCGeneral Contractor404/09/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738309/11/2024
LAWRENCE MANDARINO ARCHIT724709/11/2024
ETRECTE LLC8116207/31/2024
Building Lifecycle
All (61)Filed (10)Permit Issued (5)Signed Off (3)Violation (1)Inspection (10)Objection (2)Special Inspection (30)
09/17/2024
Special inspection requirement — Fenestration air leakage
Lawrence Mandarino
09/17/2024
Special inspection requirement — Interior lighting power
Lawrence Mandarino
09/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
09/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Lawrence Mandarino
09/17/2024
Special inspection requirement — Subgrade Inspections
Lawrence Mandarino
09/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Lawrence Mandarino
09/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/17/2024
Special inspection requirement — Concrete - Cast-In-Place
Lawrence Mandarino
09/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
09/17/2024
Special inspection requirement — Final
Lawrence Mandarino
09/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence Mandarino
09/17/2024
Special inspection requirement — Lowest Floor Elevation
Lawrence Mandarino
09/17/2024
Special inspection requirement — Footing and Foundation
Lawrence Mandarino
09/17/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
09/17/2024
Special inspection requirement — Structural Wood Frame
Lawrence Mandarino
09/17/2024
Special inspection requirement — Insulation placement and R values
Lawrence Mandarino
09/17/2024
Special inspection requirement — Electric vehicle service equipment requirements
Lawrence Mandarino
09/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence Mandarino
09/17/2024
Special inspection requirement — Air barrier — testing
Lawrence Mandarino
09/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Lawrence Mandarino
09/17/2024
Special inspection requirement — Fenestration areas
Lawrence Mandarino
09/17/2024
Special inspection requirement — Permanent certificate
Lawrence Mandarino
09/17/2024
Special inspection requirement — Maintenance information
Lawrence Mandarino
09/17/2024
Special inspection requirement — Air barrier - visual inspection
Lawrence Mandarino
09/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence Mandarino
09/11/2024
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-P6
09/10/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
09/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Lawrence Mandarino
09/10/2024
Special inspection requirement — Concrete - Cast-In-Place
Lawrence Mandarino
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
09/10/2024
Special inspection requirement — Subgrade Inspections
Lawrence Mandarino
08/21/2024
Signed off — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-S2
08/07/2024
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-P5
08/01/2024
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01070788-I1
07/31/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01070788-P1
07/29/2024
Objection raised — Scope
07/29/2024
Objection resolved — Addressed
07/24/2024
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-P4
07/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2024
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-P3
07/02/2024
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-P1
06/27/2024
Permit issued — Solar
S01070788-I1-SL
06/24/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01070788-I1
06/11/2024
Signed off — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-S1
06/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/07/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2024
Permit issued — Curb Cut
S00884811-S1-CC
03/07/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2023
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-S1
12/20/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/06/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/29/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/17/2023
Permit issued — Plumbing
S99958852-S2-PL
11/16/2023
Permit issued — Plumbing
S00884811-S2-PL
11/10/2023
Filed — New Building
New plumbing and heating systems are to be Installed throughout building
S00884811-S2
11/08/2023
Permit issued — General Construction
S00884811-I1-GC-CX
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP06/27/2024
DOB NOWCurb CutSigned-offSTATCON DEVELOPMENT LLC05/16/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/17/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC11/16/2023
DOB NOWGeneral ConstructionPermit IssuedSTATCON DEVELOPMENT LLC11/08/2023
1 project · most recent 09/11/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/11/2024Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
2 projects · most recent 06/21/2024
General Wiring
FiledStatusContractorScope
06/21/2024CompleteJSP ELECTL CNTNG CORP—
01/31/2024CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 09/11/2024
Steel Concrete Wood
FiledStatusContractorScope
09/11/2024Signed-offSTATCON DEVELOPMENT LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/06/2023Pass-Final PL - UndergroundPassView ↗
11/29/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
09/17/2024Fenestration and door U-factor and product ratingsLawrence Mandarinoenergy_progress
09/17/2024Fenestration air leakageLawrence Mandarinoenergy_progress
09/17/2024HVAC-R and service water piping design and insulationLawrence Mandarinoenergy_progress
09/17/2024Interior lighting powerLawrence Mandarinoenergy_progress
09/17/2024Structural Steel - High Strength BoltingLawrence Mandarinospecial
09/17/2024Subgrade InspectionsLawrence Mandarinospecial
09/17/2024Structural Steel - Detailsanthony santorospecial
09/17/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/17/2024Concrete - Cast-In-PlaceLawrence Mandarinospecial
09/17/2024Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
09/17/2024FinalLawrence Mandarinoprogress
09/17/2024Fire-Resistance Rated ConstructionLawrence Mandarinoprogress
09/17/2024Lowest Floor ElevationLawrence Mandarinoprogress
09/17/2024Footing and FoundationLawrence Mandarinoprogress
09/17/2024Energy Code Compliance InspectionsLawrence Mandarinoprogress
09/17/2024Structural Wood FrameLawrence Mandarinoprogress
09/17/2024Insulation placement and R valuesLawrence Mandarinoenergy_progress
09/17/2024Electric vehicle service equipment requirementsLawrence Mandarinoenergy_progress
09/17/2024HVAC-R and service water heating system controlsLawrence Mandarinoenergy_progress
09/17/2024Air barrier — testing Lawrence Mandarinoenergy_progress
09/17/2024HVAC-R and service water heating equipmentLawrence Mandarinoenergy_progress
09/17/2024Fenestration areasLawrence Mandarinoenergy_progress
09/17/2024Permanent certificateLawrence Mandarinoenergy_progress
09/17/2024Maintenance informationLawrence Mandarinoenergy_progress
09/17/2024Air barrier - visual inspectionLawrence Mandarinoenergy_progress
Latest 25 of 76.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026S00884811-P3Request digital key ↗
08/21/2026S00884811-P6Request digital key ↗
08/21/2026S00884811-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2023540255249Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
09/13/2023540255249Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/13/2023540255249Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00884811-I1Open ↗
08/13/2026S00884811-P1Open ↗
08/13/2026S00884811-P6Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00884811-P1Open ↗
08/13/2026S00884811-I1Open ↗
08/13/2026S00884811-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/13/2023540255249Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00884811-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026S00884811-P6Open ↗
09/02/2026S00884811-P6Open ↗
09/02/2026S00884811-P6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026S00884811-P6Open ↗
09/02/2026S00884811-P6Open ↗
08/31/2026S00884811-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026S00884811-P6Open ↗
08/21/2026S00884811-P5Open ↗
08/21/2026S00884811-P4Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/13/2023540255249Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/13/2023540255249Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00884811-P6Open ↗
08/13/2026S00884811-I1Open ↗
08/13/2026S00884811-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/21/2026S00884811-P6Open ↗
08/21/2026S00884811-I1Open ↗
08/15/2026S00884811-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00884811-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00884811-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00884811-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00884811-S2Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00884811-P6Open ↗
08/13/2026S00884811-P1Open ↗
08/13/2026S00884811-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/13/2023540255249Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00884811-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00884811-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/26/2023540255249Open ↗
09/13/2023540255249Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
09/13/2023540255249Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01070788-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/13/2023540255249Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00884811-P1Open ↗
08/13/2026S00884811-P6Open ↗
08/13/2026S00884811-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026S00884811-P6Open ↗
08/21/2026S00884811-I1Open ↗
08/15/2026S00884811-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026S00884811-I1Open ↗
08/13/2026S00884811-P6Open ↗
08/13/2026S00884811-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/13/2023540255249Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00884811-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00884811-I1Open ↗