← Back
STATEN ISLAND
116 MANN AVENUE
STATEN ISLAND · BIN 5176218
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Architecture
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAE MANN LLC2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS511/17/2023
C&P DESIGN CONSULTANTS108/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P DESIGN CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAE DEVELOPMENT CORPGeneral Contractor603/21/2026
M. EARLY PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738211/17/2023
ROGERS CALVANICO GROUP PL1324411/17/2023
C&P DESIGN CONSULTANT8472108/15/2023
Building Lifecycle
All (53)Filed (6)Permit Issued (4)Signed Off (3)Inspection (8)Objection (2)Special Inspection (30)
03/07/2024
Signed off — Alteration
APPLICATION FILED TO INSTALL STORM WATER , PLUMBING AND GAS FIRED FIXTURES IN CONJUNCTION WITH NB APPLICATION # S00904801-I1
S00904805-I1
02/20/2024
Signed off — Alteration
application filed to install 10.0 foot curb cut in conjunction with new building application # S00904801-i1
S00911382-I1
02/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/15/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/29/2024
Signed off — New Building
Installation of new HVAC System
S00904801-S1
01/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2023
Permit issued — Mechanical Systems
S00904801-S1-MS
12/11/2023
Permit issued — Curb Cut
S00911382-I1-CC
11/30/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
11/30/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
11/30/2023
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
11/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
11/30/2023
Special inspection requirement — Footing and Foundation
Richard Dailey
11/30/2023
Special inspection requirement — Structural Wood Frame
Richard Dailey
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
11/30/2023
Special inspection requirement — Final
Richard Dailey
11/30/2023
Special inspection requirement — Fenestration air leakage
Richard Dailey
11/30/2023
Special inspection requirement — Lighting in dwelling units
Richard Dailey
11/30/2023
Special inspection requirement — Air barrier — testing
Richard Dailey
11/30/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
11/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Richard Dailey
11/30/2023
Special inspection requirement — Fenestration areas
Richard Dailey
11/30/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
11/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/17/2023
Filed — New Building
Installation of new HVAC System
S00904801-P1
11/17/2023
Filed — Alteration
APPLICATION FILED TO INSTALL STORM WATER , PLUMBING AND GAS FIRED FIXTURES IN CONJUNCTION WITH NB APPLICATION # S00904801-I1
S00904805-P1
11/06/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
11/06/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
11/06/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
11/06/2023
Special inspection requirement — Permanent certificate
Richard Dailey
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
11/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
11/06/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
11/06/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
10/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/23/2023
Filed — Alteration
application filed to install 10.0 foot curb cut in conjunction with new building application # S00904801-i1
S00911382-I1
09/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/13/2023
Permit issued — General Construction
S00904801-I1-GC-CX
08/31/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Scope
08/28/2023
Permit issued — Plumbing
S00904805-I1-PL
08/15/2023
Filed — New Building
Installation of new HVAC System
S00904801-S1
08/08/2023
Filed — New Building
Installation of new HVAC System
S00904801-I1
07/31/2023
Filed — Alteration
APPLICATION FILED TO INSTALL STORM WATER , PLUMBING AND GAS FIRED FIXTURES IN CONJUNCTION WITH NB APPLICATION # S00904801-I1
S00904805-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDAE DEVELOPMENT CORP12/11/2023
DOB NOWCurb CutSigned-offDAE DEVELOPMENT CORP12/11/2023
DOB NOWGeneral ConstructionPermit IssuedDAE DEVELOPMENT CORP09/13/2023
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP08/28/2023
1 project · most recent 11/17/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/17/2023Signed-offDAE DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem RCFZ4821STANMC / GSX130481BH 5 tons · Split System ×2
Heating
Rheem R801T1005A21UHSNAS 100,000 BTU · Furnace ×1
Ventilation
Fantech SH704 100 CFM · Erv ×1
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 10/23/2023
General Wiring
FiledStatusContractorScope
10/23/2023CompleteMANGI ELECTRICAL CORPGeneral Wiring
1 project · most recent 11/17/2023
Wood
FiledStatusContractorScope
11/17/2023Signed-offDAE DEVELOPMENT CORPWood
1 project · most recent 11/17/2023
Earthwork
FiledStatusContractorScope
11/17/2023Signed-offDAE DEVELOPMENT CORPEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/15/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/30/2023Subgrade InspectionsRichard Daileyspecial
11/30/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
11/30/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
11/30/2023Concrete - Cast-In-PlaceRichard Daileyspecial
11/30/2023Fire-Resistance Rated ConstructionRichard Daileyprogress
11/30/2023Footing and FoundationRichard Daileyprogress
11/30/2023Structural Wood FrameRichard Daileyprogress
11/30/2023Energy Code Compliance InspectionsRichard Daileyprogress
11/30/2023FinalRichard Daileyprogress
11/30/2023Fenestration air leakageRichard Daileyenergy_progress
11/30/2023Lighting in dwelling unitsRichard Daileyenergy_progress
11/30/2023Air barrier — testing Richard Daileyenergy_progress
11/30/2023Insulation placement and R valuesRichard Daileyenergy_progress
11/30/2023HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
11/30/2023Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
11/30/2023HVAC-R and service water heating equipmentRichard Daileyenergy_progress
11/30/2023HVAC-R and service water heating system controlsRichard Daileyenergy_progress
11/30/2023Fenestration areasRichard Daileyenergy_progress
11/30/2023Air barrier - visual inspectionRichard Daileyenergy_progress
11/06/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
11/06/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
11/06/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/06/2023Energy Code Compliance InspectionsRichard Daileyprogress
11/06/2023Permanent certificateRichard Daileyenergy_progress
Latest 25 of 59.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026S00904805-I1Request digital key ↗
08/22/2026S00904805-P1Request digital key ↗
08/22/2026S00904801-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/25/2023540253642Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/25/2023540253642Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00904801-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026S00904801-S1Open ↗
09/02/2026S00904801-I1Open ↗
09/02/2026S00904801-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026S00904801-S1Open ↗
09/02/2026S00904801-S1Open ↗
09/02/2026S00904801-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026S00904805-I1Open ↗
08/22/2026S00904805-P1Open ↗
08/22/2026S00904801-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/25/2023540253642Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/25/2023540253642Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00904801-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00904801-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00904801-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/22/2026S00904801-I1Open ↗
08/13/2026S00904805-P1Open ↗
08/13/2026S00904805-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00904801-I1Open ↗
08/13/2026S00904805-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/25/2023540253642Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/25/2023540253642Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00904801-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/25/2023540253642Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/25/2023540253642Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00904801-I1Open ↗
08/13/2026S00904801-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/25/2023540253642Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/25/2023540253642Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/25/2023540253642Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/25/2023540253642Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00904801-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00904801-I1Open ↗