← Back
STATEN ISLAND
20 BROWN PLACE
STATEN ISLAND · BIN 5176292
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
Structural
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS1104/09/2026
BEYER CONSTRUCTION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.210/07/2025
C&P DESIGN CONSULTANTS610/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor807/08/2026
PREMIER PL,HTG & MECH INCPlumbing307/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472510/07/2025
SRA PLANNING & EXPEDITING5677104/26/2024
Building Lifecycle
All (83)Filed (7)Permit Issued (12)Signed Off (5)Violation (4)Inspection (16)Objection (10)Special Inspection (29)
11/18/2025
Signed off — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S1
11/17/2025
Signed off — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S3
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Signed off — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S2
10/22/2025
Signed off — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S4
10/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/15/2025
Objection resolved — Addressed
10/14/2025
Permit issued — Plumbing
S00953395-S3-EW-SP
10/10/2025
Signed off — Alteration
S01005688-I1
10/08/2025
Objection raised — Energy
10/07/2025
Filed — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-P2
10/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/19/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/11/2025
Permit issued — Plumbing
S00953395-S1-PL
09/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Permit issued — Curb Cut
S00953395-S4-CC
08/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/28/2025
Permit issued — Foundation
S00953395-I1-GC-CX
06/17/2025
Permit issued — Mechanical Systems
S00953395-S2-MS
12/20/2024
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Final
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
12/20/2024
Special inspection requirement — Metering
Stanislav Pilipenko
10/25/2024
Violation issued (ECB, closed)
Construction
10/02/2024
Filed — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S2
09/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2024
Permit issued — Plumbing
S00953395-S3-PL
08/28/2024
Permit issued — Sprinklers
S00953395-S3-EW-SP
08/20/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Violation issued (ECB, closed)
Unknown
08/07/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/05/2024
Filed — New Building
INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNITS FOR HEATING AND COOLING OF CELLAR.3) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S00953395-S3
08/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/31/2024
Permit issued — Construction Fence
S01005688-I1-FN
07/30/2024
Permit issued — Plumbing
S98224158-S1-PL
07/29/2024
Violation issued (ECB, closed)
Unknown
07/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2024
Permit issued — Plumbing
S00953395-S1-PL
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC10/14/2025
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC09/11/2025
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION09/04/2025
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION07/28/2025
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION06/17/2025
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC09/17/2024
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC08/28/2024
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION07/31/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/30/2024
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC07/02/2024
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION04/29/2024
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION02/21/2024
1 project · most recent 10/07/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2025Signed-offBEYER CONSTRUCTION CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Comfort Aire CC: MCG3036PB4P - CU: RSG1436S1R 33,400 BTU · Split System ×1
CC: MCG48PC9P - CU: RSG1448S1R - 4-TON UNIT INSTALLED 33,400 BTU · Split System ×1
Heat / Cool
Gree ONLY 1 AIR HANDLER INSTALLED CAPACITY AT 12,000 BTU/H - AHU: LIV12HP230V1R32AH - HP: LIV12HP230V1R32AO 23,200 BTU · Heat Pump Outdoor ×1
Heating
Comfort Aire GUH80C090B4M-2 88,000 BTU · Furnace ×1
GUH92C110C4M-1 - 110,000 BTU/H CAPACITY UNIT INSTALLED 88,000 BTU · Furnace ×1
Ventilation
Fantech FIT 120E 110 CFM · Erv ×2
1 project · most recent 10/07/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/07/2025Signed-offPREMIER PL,HTG & MECH INCGas, Storm, Water/Sanitary
1 project · most recent 10/29/2024
General Wiring
FiledStatusContractorScope
10/29/2024CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 10/07/2025
Wood
FiledStatusContractorScope
10/07/2025Signed-offEXPERT FIRE SPRINKLER,LLCWood
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/19/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/20/2024Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/20/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/20/2024Subgrade InspectionsStanislav Pilipenkospecial
12/20/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/20/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/20/2024FinalStanislav Pilipenkoprogress
12/20/2024Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/20/2024Footing and FoundationStanislav Pilipenkoprogress
12/20/2024Structural Wood FrameStanislav Pilipenkoprogress
12/20/2024Air barrier — testing Stanislav Pilipenkoenergy_progress
12/20/2024Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
12/20/2024Insulation placement and R valuesStanislav Pilipenkoenergy_progress
12/20/2024Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
12/20/2024Interior lighting powerStanislav Pilipenkoenergy_progress
12/20/2024Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
12/20/2024Permanent certificateStanislav Pilipenkoenergy_progress
12/20/2024Maintenance informationStanislav Pilipenkoenergy_progress
12/20/2024Fenestration air leakageStanislav Pilipenkoenergy_progress
12/20/2024Fenestration areasStanislav Pilipenkoenergy_progress
12/20/2024MeteringStanislav Pilipenkoenergy_progress
04/25/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
04/25/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
04/25/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/25/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
Latest 25 of 29.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026S01005688-I1Request digital key ↗
08/21/2026S01005688-P1Request digital key ↗
08/21/2026S00953395-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00953395-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026S01005688-I1Open ↗
08/21/2026S01005688-P1Open ↗
08/21/2026S00953395-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S00953395-P2Open ↗
08/27/2026S00953395-P2Open ↗
08/24/2026S00953395-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026S00953395-P2Open ↗
08/27/2026S00953395-P2Open ↗
08/24/2026S00953395-S1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00953395-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00953395-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00953395-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00953395-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026S00953395-I1Open ↗
08/13/2026S00953395-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00953395-I1Open ↗