← Back
STATEN ISLAND
25 CHESTER AVENUE
STATEN ISLAND · BIN 5176336
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 2Under Construction13p · 3 filings · 20 docs
Floor 1Under Construction13p · 3 filings · 20 docs
CellarUnder Construction13p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC807/07/2026
TOM PETERSEN ARCHITECT, LLC104/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REGAL CONSTRUCTION GROUPGeneral Contractor207/08/2026
A PLUS PLUMBING CORPPlumbing207/08/2026
G-ELECTRIC INCElectrical103/22/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
R&M PIPING & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738607/07/2026
THOMAS PETERSEN ARCHITECT7854104/16/2026
STEVEN R. SAVINO ARCHIT1216110/11/2023
Building Lifecycle
All (62)Filed (9)Permit Issued (6)Signed Off (1)Inspection (14)Objection (2)Special Inspection (30)
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/08/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
07/08/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
07/07/2026
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-P5
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
07/02/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
06/08/2026
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-P4
06/08/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01387542-I1
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/05/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
06/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
05/26/2026
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-P3
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
05/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/26/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
05/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/23/2026
Permit issued — Solar
S01387542-I1-SL
04/16/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01387542-I1
04/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2026
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-P2
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
03/27/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
03/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
03/25/2026
Permit issued — Plumbing
S01054070-I1-PL
02/09/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/09/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/03/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2025
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-P1
04/21/2025
Permit issued — Plumbing
S38271036-I1-PL
04/17/2025
Permit issued — Plumbing
S01054070-I1-PL
03/26/2025
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS FIXTURES WITH ASSOCIATED PIPING AND INSTALLATION OF SEPTIC SYSTEM AND STORM WATER DETENTION SYSTEM.
S01054070-I1
03/03/2025
Permit issued — Construction Fence
S01054058-I1-FN
02/27/2025
Permit issued — General Construction
S00942733-I1-GC
12/27/2024
Objection resolved — Addressed
10/23/2024
Filed — Alteration
INSTALLATION OF A WOOD CONSTRUCTION FENCE
S01054058-I1
10/13/2023
Objection raised — Scope
10/11/2023
Filed — New Building
THE PROPOSED CONSTRUCTION
S00942733-I1
02/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP04/23/2026
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP03/25/2026
DOB NOWPlumbingPermit IssuedR&M PIPING & HTG INC04/21/2025
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP04/17/2025
DOB NOWConstruction FencePermit IssuedREGAL CONSTRUCTION GROUP03/03/2025
DOB NOWGeneral ConstructionPermit IssuedREGAL CONSTRUCTION GROUP02/27/2025
1 project · most recent 07/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/07/2026Permit IssuedA PLUS PLUMBING CORPGas, Storm, Water/Sanitary
2 projects · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteJSP ELECTL CNTNG CORP—
06/26/2025Permit IssuedG-ELECTRIC INCGeneral Wiring
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026Signed-offJ.B.I. CONSTRUCTION GROUP18 panels, 7.92 kw, 2,123.41 roof_area_sqft
1 project · most recent 10/23/2024
Fence
FiledStatusContractorScope
10/23/2024Permit IssuedREGAL CONSTRUCTION GROUPFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/09/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/09/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/03/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/07/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
07/08/2026Energy Code Compliance InspectionsSteven Savinoprogress
07/08/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
07/08/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/08/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
07/08/2026On-Site Private Sewage Disposal Systems Installationanthony santorospecial
07/08/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
07/02/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
07/02/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
07/02/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/02/2026Energy Code Compliance InspectionsSteven Savinoprogress
07/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
07/02/2026On-Site Private Sewage Disposal Systems Installationanthony santorospecial
06/05/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/05/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
06/05/2026On-Site Private Sewage Disposal Systems Installationanthony santorospecial
06/05/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
06/05/2026Energy Code Compliance InspectionsSteven Savinoprogress
05/26/2026Energy Code Compliance InspectionsSteven Savinoprogress
05/26/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
05/26/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/26/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
05/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/26/2026On-Site Private Sewage Disposal Systems Installationanthony santorospecial
03/27/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
Latest 25 of 52.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026S00942733-I1Request digital key ↗
08/20/2026S01054058-I1Request digital key ↗
08/17/2026S01387542-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/01/2024540264523Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/26/2024540264523Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00942733-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00942733-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00942733-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026S01054070-P1Open ↗
09/01/2026S01054070-P1Open ↗
08/31/2026S00942733-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026S01054070-P1Open ↗
08/31/2026S00942733-I1Open ↗
08/31/2026S00942733-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026S01054058-I1Open ↗
08/17/2026S01387542-I1Open ↗
08/16/2026S01054070-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/01/2024540264523Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/01/2024540264523Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00942733-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00942733-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00942733-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/26/2024540264523Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/01/2024540264523Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00942733-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00942733-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/26/2024540264523Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
09/26/2024540264523Open ↗
▸BISBSA/CPC APPROVAL1
09/26/2024540264523Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01387542-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/01/2024540264523Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION2
09/26/2024540264523Open ↗
09/26/2024540264523Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
09/26/2024540264523Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/26/2024540264523Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
09/26/2024540264523Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00942733-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00942733-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00942733-I1Open ↗