← Back
STATEN ISLAND
251 VAN PELT AVENUE
STATEN ISLAND · BIN 5176352
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PALERMO CONSTRUCTION1707/08/2026
RIDERALLC803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/29/2025
LOBUE & VALENZIANO, LLP603/07/2025
C&P DESIGN CONSULTANTS301/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO BUE VALENZIANO AIA1203/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PALERMO CONSTRUCTION CORP.General Contractor507/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/29/2025
C&P DESIGN CONSULTANT8472503/07/2025
Building Lifecycle
All (68)Filed (10)Permit Issued (8)Signed Off (5)Inspection (13)Objection (2)Special Inspection (30)
11/17/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01231094-I1
06/05/2025
Permit issued — Solar
S01231094-I1-SL
05/29/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01231094-I1
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/23/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/23/2025
Special inspection requirement — Final
Walid Abdulla
05/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/11/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Final
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/11/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
03/07/2025
Filed — New Building
INSTALLATION OF 8'-6" CURB CUT FOR 251 VAN PELT AVENUE
S00949430-P2
03/06/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
03/06/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
01/31/2025
Signed off — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959935-I1
01/30/2025
Signed off — New Building
INSTALLATION OF 8'-6" CURB CUT FOR 251 VAN PELT AVENUE
S00949430-S1
01/27/2025
Filed — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959935-P2
12/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2024
Filed — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959935-P1
12/17/2024
Filed — New Building
INSTALLATION OF 8'-6" CURB CUT FOR 251 VAN PELT AVENUE
S00949430-P1
12/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2024
Signed off — New Building
INSTALLATION OF 8'-6" CURB CUT FOR 251 VAN PELT AVENUE
S00949430-S2
11/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2024
Signed off — Alteration
INSTALL 8' CONSTRUCTION FENCE. THIS APPLICATION ALSO APPLIES TO 253 VAN PELT AVENUE, LOT # 19.
S01020983-I1
08/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2024
Permit issued — Curb Cut
S00949430-S2-CC
07/15/2024
Filed — New Building
INSTALLATION OF 8'-6" CURB CUT FOR 251 VAN PELT AVENUE
S00949430-S2
06/10/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/05/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/03/2024
Permit issued — Plumbing
S63037127-S1-PL
06/03/2024
Permit issued — Plumbing
S00959935-I1-EW-SP
06/03/2024
Permit issued — Sprinklers
S00959935-I1-PL
05/28/2024
Permit issued — Plumbing
S00949430-S1-PL
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/05/2025
DOB NOWCurb CutSigned-offPALERMO CONSTRUCTION CORP07/24/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC06/03/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP06/03/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT PLBG & HTG COR06/03/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/28/2024
DOB NOWGeneral ConstructionPermit IssuedPALERMO CONSTRUCTION CORP04/01/2024
DOB NOWConstruction FenceSigned-offPALERMO CONSTRUCTION CORP03/21/2024
1 project · most recent 03/07/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/07/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteSUNRUN SOLAR ELECTL CORP—
11/20/2024CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 03/07/2025
Wood
FiledStatusContractorScope
03/07/2025Signed-offPALERMO CONSTRUCTION CORPWood
1 project · most recent 03/07/2025
Earthwork
FiledStatusContractorScope
03/07/2025Signed-offPALERMO CONSTRUCTION CORPEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/23/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/23/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
05/23/2025FinalWalid Abdullaprogress
05/23/2025Energy Code Compliance InspectionsWalid Abdullaprogress
05/23/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/11/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
03/11/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
03/11/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/11/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
03/11/2025Subgrade InspectionsStanislav Pilipenkospecial
03/11/2025Footing and FoundationStanislav Pilipenkoprogress
03/11/2025Structural Wood FrameStanislav Pilipenkoprogress
03/11/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
03/11/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/11/2025FinalStanislav Pilipenkoprogress
03/11/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/11/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
03/11/2025Fenestration areasStanislav Pilipenkoenergy_progress
03/11/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
03/11/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
03/11/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
03/11/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/11/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/11/2025Interior lighting powerStanislav Pilipenkoenergy_progress
03/06/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
Latest 25 of 47.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026S01020983-I1Request digital key ↗
08/20/2026S00949430-I1Request digital key ↗
08/20/2026S00949430-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation3
02/04/2025540259753Open ↗
10/28/2024540259753Open ↗
10/30/2023540259753Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/24/2025540259753Open ↗
09/30/2024540259753Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00949430-I1Open ↗
08/13/2026S00949430-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00949430-P2Open ↗
08/13/2026S00949430-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00949430-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026S00949430-I1Open ↗
08/20/2026S00949430-S1Open ↗
08/20/2026S00949430-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00959935-P1Open ↗
08/29/2026S00949430-P2Open ↗
08/29/2026S00949430-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026S00949430-P2Open ↗
08/29/2026S00949430-P2Open ↗
08/25/2026S00949430-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/18/2023540259753Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/18/2023540259753Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00949430-P2Open ↗
08/13/2026S00949430-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00949430-P2Open ↗
08/13/2026S00949430-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00949430-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00949430-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00949430-I1Open ↗
▸Inspections & Test Reports5
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
10/30/2023540259753Open ↗
10/18/2023540259753Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00949430-I1Open ↗
08/13/2026S00949430-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00949430-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/04/2025540259753Open ↗
10/30/2023540259753Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01231094-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026S00949430-I1Open ↗
08/13/2026S00949430-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00949430-P2Open ↗
08/13/2026S00949430-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S00949430-I1Open ↗
08/20/2026S00949430-P2Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
01/31/2025540259753Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/04/2025540259753Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/30/2023540259753Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00949430-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00949430-I1Open ↗