485 JEWETT AVENUE
STATEN ISLAND · BIN 5176358
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R3XZoning
0 sfGross Floor Area
0Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: UASMBDY LLC · 4,488 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionCivil
Roof1p · 1 filing · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONELLO ENTERPRISES2907/08/2026
UASMBDY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT603/23/2026
A TECH ENGINEERING NYC, PLLC.201/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1003/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor707/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing307/08/2026
K-10 ELECTRIC CORPElectrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738403/23/2026
Building Lifecycle
All (55)Filed (8)Permit Issued (10)Signed Off (6)Inspection (15)Objection (6)Special Inspection (10)
04/01/2026
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-I1
03/30/2026
Objection raised — Scope
03/30/2026
Objection resolved — Addressed
03/23/2026
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-P2
01/21/2026
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S1
01/08/2026
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S2
01/05/2026
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01147632-I1
12/02/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. FENCE APPLIES FOR THE TWO NEW SEMI-DETACHED MIXED USE BUILDINGS BEING FILED FOR THIS LOT WHICH WILL BE SUBDIVIDED INTO TWO NEW LOTS.
S00902979-I1
12/02/2025
Permit issued — Mechanical Systems
S00979006-S2-MS
12/01/2025
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S4
11/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/03/2025
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-P1
10/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/18/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2025
Permit issued — Curb Cut
S00979006-S4-CC
09/04/2025
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S4
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2025
Permit issued — Plumbing
S55956465-S1-PL
04/23/2025
Permit issued — Plumbing
S01147632-I1-PL
04/23/2025
Permit issued — Plumbing
S01147632-I1-EW-SP
04/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2025
Permit issued — Plumbing
S00979006-S1-PL
02/11/2025
Objection resolved — Addressed
01/23/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01147632-I1
01/15/2025
Objection raised — Scope
01/08/2025
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S2
12/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/12/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/12/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/12/2024
Special inspection requirement — Shutoff dampers
anthony santoro
12/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/12/2024
Special inspection requirement — Maintenance information
anthony santoro
12/06/2024
Special inspection requirement — Mechanical Systems
anthony santoro
12/06/2024
Special inspection requirement — Final
anthony santoro
11/25/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/25/2024
Special inspection requirement — Sprinkler Systems
anthony santoro
11/18/2024
Permit issued — Plumbing
S00979006-S1-PL
11/12/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-S1
10/25/2024
Permit issued — Earth Work
S00979006-I1-GC-CX
10/17/2024
Permit issued — Construction Fence
S00902979-I1-FN
09/26/2024
Objection resolved — Addressed
03/19/2024
Objection raised — Scope
12/19/2023
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00979006-I1
07/13/2023
Permit issued — Construction Fence
S00902979-I1-FN
07/12/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. FENCE APPLIES FOR THE TWO NEW SEMI-DETACHED MIXED USE BUILDINGS BEING FILED FOR THIS LOT WHICH WILL BE SUBDIVIDED INTO TWO NEW LOTS.
S00902979-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMONELLO ENTERPRISES INC12/02/2025
DOB NOWCurb CutSigned-offMONELLO ENTERPRISES INC09/05/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/14/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR04/23/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP04/23/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR04/21/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/18/2024
DOB NOWEarth WorkPermit IssuedMONELLO ENTERPRISES INC10/25/2024
DOB NOWConstruction FenceSigned-offMONELLO ENTERPRISES INC10/17/2024
DOB NOWConstruction FenceSigned-offMONELLO ENTERPRISES INC07/13/2023
1 project · most recent 03/23/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026Signed-offMONELLO ENTERPRISES INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Luxaire RC330E2S11A 30,000 BTU · Condensing Unit ×2
RC342E2S11A 42,000 BTU · Condensing Unit ×1
Heating
Luxaire RL18080C16MPS1A 75,000 BTU · Furnace ×2
RG19080C16MPS1A 75,000 BTU · Furnace ×1
Ventilation
Luxaire B130E65RS 390 CFM · Erv ×3
1 project · most recent 03/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/23/2026Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 02/13/2025
General Wiring
FiledStatusContractorScope
02/13/2025CompleteK-10 ELECTRIC CORPGeneral Wiring
1 project · most recent 03/23/2026
Concrete Wood
FiledStatusContractorScope
03/23/2026Signed-offMONELLO ENTERPRISES INCConcrete, Wood
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/18/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/12/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/12/2024Ventilation and air distribution systemanthony santoroenergy_progress
12/12/2024Energy Code Compliance Inspectionsanthony santoroprogress
12/12/2024Shutoff dampersanthony santoroenergy_progress
12/12/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/12/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/12/2024Maintenance informationanthony santoroenergy_progress
12/06/2024Mechanical Systemsanthony santorospecial
12/06/2024Finalanthony santoroprogress
11/25/2024Sprinkler Systemsanthony santorospecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S00902979-I1Request digital key ↗
08/20/2026S00979006-I1Request digital key ↗
08/20/2026S00979006-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026S00979006-P2Open ↗
08/20/2026S00979006-I1Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00979006-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026S00979006-S1Open ↗
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026S00979006-S2Open ↗
08/29/2026S00979006-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S00979006-S2Open ↗
08/25/2026S01147632-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00979006-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00979006-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00979006-I1Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026S00979006-P2Open ↗
08/13/2026S00979006-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00979006-I1Open ↗