← Back
Two family frame
VAN NAME AVENUE
STATEN ISLAND · BIN 5176373
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
2,224 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: YU & DONG REALTY LLC · 2,973 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Structural
Floor 33p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SI NORTHSHOER ENTERPRISES1507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.310/29/2024
C&P DESIGN CONSULTANTS410/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor203/21/2026
DV PLUMBING INCPlumbing207/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472610/29/2024
Building Lifecycle
All (61)Filed (7)Permit Issued (7)Signed Off (2)Violation (2)Inspection (13)Special Inspection (30)
11/27/2024
Signed off — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-S2
11/27/2024
Signed off — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-S1
11/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
11/07/2024
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Final
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Metering
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
11/07/2024
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
10/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/30/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/29/2024
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-P4
10/22/2024
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-P3
08/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/04/2024
Inspection — No Access-Final SP - Up to 3 Requested Floors
No Access
View inspection ↗
03/04/2024
Permit issued — Plumbing
S39992484-S2-PL
03/04/2024
Permit issued — Sprinklers
S08025981-S1-PL
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Permit issued — Sprinklers
S08025981-S1-PL
10/26/2023
Permit issued — Sprinklers
S08025981-S1-EW-SP
10/20/2023
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
10/18/2023
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-P2
09/22/2023
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-P1
08/15/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/10/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/02/2023
Permit issued — Plumbing
S39992484-S2-PL
07/31/2023
Permit issued — Plumbing
S08025981-S2-PL
07/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-S2
07/07/2023
Permit issued — Structural
S08025981-I1-GC-CX
05/01/2023
Filed — New Building
Installation of new sprinkler system with associated water service and BFP Assembly
S08025981-S1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWSprinklersSigned-offDV PLUMBING INC03/04/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT PLBG & HTG COR10/27/2023
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP10/26/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/02/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/31/2023
DOB NOWStructuralPermit IssuedSUFFOLK CONSTRUCT CO. INC07/07/2023
1 project · most recent 10/29/2024
Sprinkler System
FiledStatusContractorScope
10/29/2024Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 project · most recent 10/29/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/29/2024Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 11/05/2023
General Wiring
FiledStatusContractorScope
11/05/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 10/29/2024
Wood
FiledStatusContractorScope
10/29/2024Signed-offDV PLUMBING INCWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/23/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/04/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/04/2024No Access-Final SP - Up to 3 Requested FloorsNo AccessView ↗
11/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Pass-Final PL - UndergroundPassView ↗
08/10/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/03/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/07/2024Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
11/07/2024Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
11/07/2024Exterior Insulation and Finish Systems (EIFS)Stanislav Pilipenkospecial
11/07/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
11/07/2024Subgrade InspectionsStanislav Pilipenkospecial
11/07/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/07/2024Concrete - Cast-In-PlaceStanislav Pilipenkospecial
11/07/2024FinalStanislav Pilipenkoprogress
11/07/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
11/07/2024Structural Wood FrameStanislav Pilipenkoprogress
11/07/2024Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
11/07/2024Footing and FoundationStanislav Pilipenkoprogress
11/07/2024Interior lighting powerStanislav Pilipenkoenergy_progress
11/07/2024Air barrier — testing Stanislav Pilipenkoenergy_progress
11/07/2024Fenestration air leakageStanislav Pilipenkoenergy_progress
11/07/2024Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
11/07/2024MeteringStanislav Pilipenkoenergy_progress
11/07/2024Fenestration areasStanislav Pilipenkoenergy_progress
11/07/2024Maintenance informationStanislav Pilipenkoenergy_progress
11/07/2024Permanent certificateStanislav Pilipenkoenergy_progress
11/07/2024Insulation placement and R valuesStanislav Pilipenkoenergy_progress
10/30/2024Maintenance informationStanislav Pilipenkoenergy_progress
10/30/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/30/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
Latest 25 of 31.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S08025981-S2Request digital key ↗
08/23/2026S08025981-S1Request digital key ↗
08/23/2026S08025981-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-S2Open ↗
08/13/2026S08025981-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S08025981-P1Open ↗
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08025981-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S08025981-S2Open ↗
08/23/2026S08025981-S1Open ↗
08/23/2026S08025981-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S08025981-S1Open ↗
08/26/2026S08025981-S2Open ↗
08/26/2026S08025981-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026S08025981-S2Open ↗
08/26/2026S08025981-S2Open ↗
08/26/2026S08025981-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S08025981-P1Open ↗
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-P4Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08025981-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08025981-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08025981-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-P1Open ↗
08/13/2026S08025981-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08025981-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S08025981-P4Open ↗
08/13/2026S08025981-I1Open ↗
08/13/2026S08025981-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026S08025981-P1Open ↗
08/23/2026S08025981-I1Open ↗
08/23/2026S08025981-P4Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08025981-I1Open ↗