One family attached or semi-detached
BEACH ROAD
STATEN ISLAND · BIN 5176391
💬 Discuss this project
2024Year Built
3Stories
A5Building Class
R3-2Zoning
1,365 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · Owner of record: BLOOMFIELD DEVELOPERS LLC · 1,900 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Floor 22p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIELDWAY GROUP2507/08/2026
BLOOMFIELD DEVELOPERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI607/14/2025
A TECH ENGINEERING NYC, PLLC.203/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA603/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVAGNARO CONTRACTING LLCGeneral Contractor603/21/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES V MORRI, RA1042307/14/2025
ROGERS CALVANICO GROUP PL1324307/14/2025
A TECH ENGINEERING NYC, P6738203/17/2025
Building Lifecycle
All (59)Filed (8)Permit Issued (5)Signed Off (3)Violation (1)Inspection (10)Objection (2)Special Inspection (30)
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
07/21/2025
Special inspection requirement — Electric vehicle service equipment requirements
James Morri
07/21/2025
Special inspection requirement — Structural Steel - Details
James Morri
07/21/2025
Special inspection requirement — Subgrade Inspections
James Morri
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
07/21/2025
Special inspection requirement — Permanent certificate
James Morri
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
James Morri
07/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
07/21/2025
Special inspection requirement — Footing and Foundation
James Morri
07/21/2025
Special inspection requirement — Structural Wood Frame
James Morri
07/21/2025
Special inspection requirement — Final
James Morri
07/21/2025
Special inspection requirement — Concrete - Cast-In-Place
James Morri
07/21/2025
Special inspection requirement — Air barrier - visual inspection
James Morri
07/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
07/21/2025
Special inspection requirement — Fenestration air leakage
James Morri
07/21/2025
Special inspection requirement — Metering
James Morri
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Morri
07/21/2025
Special inspection requirement — Insulation placement and R values
James Morri
07/21/2025
Special inspection requirement — Lighting in dwelling units
James Morri
07/21/2025
Special inspection requirement — Maintenance information
James Morri
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
James Morri
07/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
07/21/2025
Special inspection requirement — Fenestration areas
James Morri
07/21/2025
Special inspection requirement — Air barrier — testing
anthony santoro
07/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
07/14/2025
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-P3
07/14/2025
Special inspection requirement — Structural Steel - Details
James Morri
07/14/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
07/14/2025
Special inspection requirement — Concrete - Cast-In-Place
James Morri
07/14/2025
Special inspection requirement — Subgrade Inspections
James Morri
06/12/2025
Signed off — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-S3
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/23/2025
Signed off — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-S2
05/22/2025
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM IN PROPOSED RESIDENTIAL HOUSE WITH VALVES AND METERS FOR SAME.
S01066216-I1
05/01/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/30/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2025
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-P2
04/08/2025
Permit issued — Curb Cut
S00963864-S3-CC
04/01/2025
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-S3
03/24/2025
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-P1
03/17/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM IN PROPOSED RESIDENTIAL HOUSE WITH VALVES AND METERS FOR SAME.
S01066216-P1
03/13/2025
Permit issued — Foundation
S00963864-I1-GC-CX
03/04/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/03/2025
Permit issued — Plumbing
S01066216-I1-PL
09/20/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2024
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM IN PROPOSED RESIDENTIAL HOUSE WITH VALVES AND METERS FOR SAME.
S01066216-I1
06/13/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/07/2024
Permit issued — Plumbing
S00963864-S2-PL
05/03/2024
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-S2
04/18/2024
Permit issued — Foundation
S00963864-I1-GC-CX
03/21/2024
Violation issued (ECB, closed)
Construction
02/07/2024
Objection resolved — Addressed
12/27/2023
Objection raised — Scope
11/30/2023
Filed — New Building
9' CURB CUT 121' FROM OAKDALE STREET
S00963864-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCAVAGNARO CONTRACTING LLC04/08/2025
DOB NOWFoundationPermit IssuedCAVAGNARO CONTRACTING LLC03/13/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/03/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/07/2024
DOB NOWFoundationPermit IssuedCAVAGNARO CONTRACTING LLC04/18/2024
1 project · most recent 07/14/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/14/2025Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 04/18/2025
General Wiring
FiledStatusContractorScope
04/18/2025CompleteFICHERA ELECTRIC, INCGeneral Wiring
1 project · most recent 07/14/2025
Steel Concrete Wood
FiledStatusContractorScope
07/14/2025Signed-offCAVAGNARO CONTRACTING LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/01/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/30/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/20/2024Pass-Final PL - UndergroundPassView ↗
08/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
07/21/2025HVAC-R and service water piping design and insulationJames Morrienergy_progress
07/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
07/21/2025Fire-Resistant Penetrations and JointsJames Morrispecial
07/21/2025Structural Steel - DetailsJames Morrispecial
07/21/2025Subgrade InspectionsJames Morrispecial
07/21/2025Concrete - Cast-In-PlaceJames Morrispecial
07/21/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/21/2025Energy Code Compliance InspectionsJames Morriprogress
07/21/2025Fire-Resistance Rated ConstructionJames Morriprogress
07/21/2025Footing and FoundationJames Morriprogress
07/21/2025Structural Wood FrameJames Morriprogress
07/21/2025FinalJames Morriprogress
07/21/2025Electric vehicle service equipment requirementsJames Morrienergy_progress
07/21/2025Permanent certificateJames Morrienergy_progress
07/21/2025Air barrier - visual inspectionJames Morrienergy_progress
07/21/2025Fenestration air leakageJames Morrienergy_progress
07/21/2025MeteringJames Morrienergy_progress
07/21/2025HVAC-R and service water heating equipmentJames Morrienergy_progress
07/21/2025Insulation placement and R valuesJames Morrienergy_progress
07/21/2025Lighting in dwelling unitsJames Morrienergy_progress
07/21/2025Maintenance informationJames Morrienergy_progress
07/21/2025HVAC-R and service water heating system controlsJames Morrienergy_progress
07/21/2025Fenestration and door U-factor and product ratingsJames Morrienergy_progress
07/21/2025Fenestration areasJames Morrienergy_progress
07/21/2025Air barrier — testing anthony santoroenergy_progress
Latest 25 of 76.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026S01066216-P1Request digital key ↗
08/20/2026S01066216-I1Request digital key ↗
08/19/2026S00963864-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00963864-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00963864-P3Open ↗
09/01/2026S00963864-P3Open ↗
09/01/2026S00963864-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/22/2026S01066216-I1Open ↗
09/01/2026S00963864-P3Open ↗
09/01/2026S00963864-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026S01066216-P1Open ↗
08/20/2026S01066216-I1Open ↗
08/19/2026S00963864-P2Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/19/2026S00963864-I1Open ↗
08/19/2026S00963864-P2Open ↗
08/13/2026S00963864-P3Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00963864-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00963864-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00963864-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00963864-S2Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/19/2026S00963864-I1Open ↗
08/19/2026S00963864-P2Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00963864-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026S00963864-P2Open ↗
08/19/2026S00963864-I1Open ↗
08/13/2026S00963864-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00963864-I1Open ↗