STATEN ISLAND
3B POILLON AVENUE
STATEN ISLAND · BIN 5176535
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 214p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Basement13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OAK DEVELOPERS2807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.1003/06/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OAK DEVELOPERS,LLCGeneral Contractor504/09/2026
CHARLES J. DEHART JR P&HPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677403/06/2025
C&P DESIGN CONSULTANT8472501/09/2025
Building Lifecycle
All (59)Filed (10)Permit Issued (6)Signed Off (3)Inspection (10)Special Inspection (30)
03/12/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
03/12/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM MONTAGUE
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Metering
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Final
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
03/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
03/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
03/12/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/06/2025
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P6
03/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
03/06/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
02/24/2025
Signed off — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S2
02/05/2025
Signed off — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S3
02/05/2025
Signed off — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S1
01/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/09/2025
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P5
01/08/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/30/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P4
12/30/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P3
12/27/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P2
12/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/09/2024
Permit issued — Curb Cut
S00973048-S3-CC
12/04/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S3
11/18/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-P1
11/13/2024
Permit issued — Mechanical Systems
S00973048-S2-MS
09/20/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2024
Permit issued — Plumbing
S76342892-S1-PL
07/29/2024
Permit issued — General Construction
S00973048-I1-GC-CX
07/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2024
Permit issued — Plumbing
S00973048-S1-PL
05/01/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S2
04/26/2024
Permit issued — Foundation
S00973048-I1-GC-CX
04/09/2024
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-S1
12/11/2023
Filed — New Building
1) INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS AND RADIANT FLOOR HEATING FOR HEATING OF PRIMARY RESIDENCE.2) INSTALLATION OF GAS-FIRED FURNACE UNIT WITH SPLIT SYSTEM DX COIL AND CONDENSER FOR HEATING AND C
S00973048-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOAK DEVELOPERS,LLC12/09/2024
DOB NOWMechanical SystemsSigned-offOAK DEVELOPERS,LLC11/13/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/06/2024
DOB NOWGeneral ConstructionPermit IssuedOAK DEVELOPERS,LLC07/29/2024
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H06/05/2024
DOB NOWFoundationPermit IssuedOAK DEVELOPERS,LLC04/26/2024
1 project · most recent 03/06/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2025Signed-offOAK DEVELOPERS,LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Luxaire AHU: JHETC60HBCS2N1A CU: TCD2B48S21SA 48,000 BTU · Split System ×1
AHU: JHETD60JBCS2N1A CU: TCD2B48S21SA 48,000 BTU · Split System ×1
CC: XAFA18ABAN1A CU: TCD2B18S21SA 18,000 BTU · Condensing Unit ×1
Heating
Luxaire Z9ES040A10SMPS1A 40,000 BTU · Furnace ×1
Navien NCB-250/150H 150,000 BTU · Boiler ×1
Ventilation
Fantech ATMO 150E 194 CFM · Erv ×1
N/A 70 CFM · Erv ×1
1 project · most recent 03/06/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/06/2025Signed-offCHARLES J. DEHART JR P&HGas, Storm, Water/Sanitary
1 project · most recent 06/14/2024
General Wiring
FiledStatusContractorScope
06/14/2024CompleteTRUE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/08/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/20/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 137
DateRequirementInspectorRole
03/12/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
03/12/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
03/12/2025Subgrade InspectionsWILLIAM MONTAGUEspecial
03/12/2025Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
03/12/2025Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
03/12/2025Structural Steel - WeldingWILLIAM MONTAGUEspecial
03/12/2025FinalStanislav Pilipenkoprogress
03/12/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/12/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
03/12/2025Fenestration areasStanislav Pilipenkoenergy_progress
03/12/2025Interior lighting powerStanislav Pilipenkoenergy_progress
03/12/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
03/12/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
03/12/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
03/12/2025MeteringStanislav Pilipenkoenergy_progress
03/12/2025FireplacesStanislav Pilipenkoenergy_progress
03/12/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
03/12/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/12/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/12/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
03/12/2025Footing and FoundationStanislav Pilipenkoprogress
03/12/2025Structural Wood FrameStanislav Pilipenkoprogress
03/06/2025FinalStanislav Pilipenkoprogress
03/06/2025Fenestration areasStanislav Pilipenkoenergy_progress
03/06/2025Interior lighting powerStanislav Pilipenkoenergy_progress
Latest 25 of 137.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026S00973048-I1Request digital key ↗
08/20/2026S00973048-P6Request digital key ↗
08/20/2026S00973048-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-I1Open ↗
08/13/2026S00973048-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-I1Open ↗
08/13/2026S00973048-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026S00973048-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026S00973048-S1Open ↗
08/31/2026S00973048-I1Open ↗
08/31/2026S00973048-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026S00973048-S1Open ↗
08/31/2026S00973048-I1Open ↗
08/31/2026S00973048-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-P5Open ↗
08/20/2026S00973048-P4Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-I1Open ↗
08/13/2026S00973048-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/20/2026S00973048-I1Open ↗
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/20/2026S00973048-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026S00973048-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026S00973048-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/20/2026S00973048-I1Open ↗
08/20/2026S00973048-P6Open ↗
08/13/2026S00973048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026S00973048-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/20/2026S00973048-I1Open ↗
08/20/2026S00973048-P6Open ↗
08/13/2026S00973048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-I1Open ↗
08/13/2026S00973048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026S00973048-I1Open ↗
08/20/2026S00973048-P6Open ↗
08/20/2026S00973048-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/20/2026S00973048-I1Open ↗