Locations of Work
ArchitectureStructuralFire Protection
Roof1p · 1 filing · 3 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 2 docs
Basement1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3SC CONSTRUCTION2607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/06/2026
THINK DESIGN ARCHITECTURE812/02/2025
A TECH ENGINEERING NYC, PLLC.108/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE803/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3SC CONSTRUCTION, LLCGeneral Contractor307/08/2026
FINE MECHANICAL CORPPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/06/2026
A TECH ENGINEERING NYC, P6738612/02/2025
Building Lifecycle
All (67)Filed (10)Permit Issued (7)Signed Off (6)Violation (1)Inspection (13)Special Inspection (30)
06/17/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01398129-I1
05/12/2026
Permit issued — Solar
S01398129-I1-SL
05/06/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01398129-I1
04/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/06/2026
Signed off — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-I1
02/03/2026
Signed off — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-S1
01/23/2026
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S00998841-I1
01/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/23/2025
Special inspection requirement — Metering
anthony santoro
12/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/23/2025
Special inspection requirement — Maintenance information
anthony santoro
12/23/2025
Special inspection requirement — Permanent certificate
anthony santoro
12/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2025
Signed off — Alteration
S00981605-I1
12/02/2025
Filed — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-P4
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/02/2025
Special inspection requirement — Metering
anthony santoro
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/02/2025
Special inspection requirement — Maintenance information
anthony santoro
12/02/2025
Special inspection requirement — Permanent certificate
anthony santoro
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/01/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Permit issued — Curb Cut
S00981605-I1-CC
10/23/2025
Filed — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-P3
10/09/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
09/23/2025
Signed off — Alteration
Application is filed for temporary construction fence filed in conjunction with the New Building #S00969941-I1.
S00981572-I1
09/23/2025
Permit issued — Construction Fence
S00981572-I1-FN
07/25/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/07/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/16/2025
Permit issued — Plumbing
S00998841-I1-PL
05/22/2025
Permit issued — Plumbing
S80457001-S1-PL
05/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2025
Permit issued — Plumbing
S00969941-S1-PL
05/05/2025
Permit issued — Foundation
S00969941-I1-GC-CX
03/26/2025
Filed — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-P2
03/05/2025
Special inspection requirement — Permanent certificate
anthony santoro
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/05/2025
Special inspection requirement — Maintenance information
anthony santoro
03/05/2025
Special inspection requirement — Metering
anthony santoro
03/04/2025
Filed — New Building
Application is filed for plumbing work only in conjunction to new building #S00969941-I1.
S00969941-P1
01/21/2025
Filed — Alteration
S00981605-I1
01/20/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
01/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
01/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTOM PETERSEN ARCHITECT, LLC05/12/2026
DOB NOWCurb CutSigned-off3SC CONSTRUCTION, LLC11/20/2025
DOB NOWConstruction FenceSigned-off3SC CONSTRUCTION, LLC09/23/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP06/16/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/22/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP05/13/2025
DOB NOWFoundationPermit Issued3SC CONSTRUCTION, LLC05/05/2025
1 project · most recent 12/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/02/2025Signed-offFINE MECHANICAL CORPGas, Storm, Water/Sanitary
2 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteVENTURE HOME SOLAR LLC—
07/06/2025CompleteS.T.K. ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
12/23/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
12/23/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/23/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/23/2025Permanent certificateanthony santoroenergy_progress
12/23/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/23/2025Meteringanthony santoroenergy_progress
12/23/2025Maintenance informationanthony santoroenergy_progress
12/23/2025Energy Code Compliance Inspectionsanthony santoroprogress
12/02/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
12/02/2025Maintenance informationanthony santoroenergy_progress
12/02/2025Permanent certificateanthony santoroenergy_progress
12/02/2025Meteringanthony santoroenergy_progress
12/02/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/02/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/02/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/02/2025Energy Code Compliance Inspectionsanthony santoroprogress
03/05/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
03/05/2025Permanent certificateanthony santoroenergy_progress
03/05/2025Meteringanthony santoroenergy_progress
03/05/2025Maintenance informationanthony santoroenergy_progress
03/05/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/05/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/05/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/05/2025Energy Code Compliance Inspectionsanthony santoroprogress
01/20/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
Latest 25 of 84.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026S00981572-I1Request digital key ↗
08/21/2026S00998841-I1Request digital key ↗
08/20/2026S00981605-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-P1Open ↗
08/13/2026S00969941-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-I1Open ↗
08/13/2026S00969941-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00969941-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026S00981605-I1Open ↗
08/17/2026S00969941-P2Open ↗
08/17/2026S00969941-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00969941-P4Open ↗
09/01/2026S00969941-P4Open ↗
08/31/2026S00969941-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00969941-P4Open ↗
08/31/2026S00969941-P2Open ↗
08/30/2026S00969941-S1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-I1Open ↗
08/13/2026S00969941-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/17/2026S00969941-P1Open ↗
08/17/2026S00969941-I1Open ↗
08/17/2026S00969941-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00969941-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00969941-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00969941-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-I1Open ↗
08/13/2026S00969941-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00969941-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026S01398129-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-I1Open ↗
08/13/2026S00969941-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026S00969941-P3Open ↗
08/13/2026S00969941-P1Open ↗
08/13/2026S00969941-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026S00969941-P1Open ↗
08/17/2026S00969941-I1Open ↗
08/17/2026S00969941-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00969941-I1Open ↗