← Back
STATEN ISLAND
79 PERRY AVENUE
STATEN ISLAND · BIN 5176555
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction26p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction25p · 1 filing · 20 docs
BasementUnder Construction26p · 1 filing · 20 docs
1 job · most recent 05/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
05/14/2026Permit IssuedSKEN SERVICES CORPHeating and Air Conditioning Systems, Ventilation Systems
1 job · most recent 05/14/2026
Sprinkler System
FiledStatusContractorScope
05/14/2026——Sprinkler System
1 job · most recent 05/14/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/14/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 job · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 job · most recent 05/14/2026
Wood
FiledStatusContractorScope
05/14/2026Permit IssuedSKEN SERVICES CORPWood
Building Lifecycle
All (67)Filed (5)Permit Issued (10)Inspection (10)Objection (12)Special Inspection (30)
09/01/2026
Permit issued — Mechanical Systems
S00975152-S4-MS
08/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2026
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S00975152-S4
04/09/2026
Permit issued — Foundation
S00975152-I1-GC-CX
04/03/2026
Permit issued — Curb Cut
S00975152-S1-CC
01/23/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/21/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
11/21/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2025
Permit issued — Plumbing
S42919673-S3-PL
10/31/2025
Permit issued — Plumbing
S00975152-S3-PL
10/28/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S00975152-S3
10/28/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S00975152-S1
10/28/2025
Permit issued — Plumbing
S00975152-S2-PL
10/27/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S00975152-S2
10/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
10/27/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
10/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/27/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/27/2025
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
09/05/2025
Permit issued — Foundation
S00975152-I1-GC-CX
09/05/2025
Permit issued — General Construction
S00975152-I1-FO
08/20/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/03/2024
Permit issued — Foundation
S00975152-I1-GC-CX
10/03/2024
Permit issued — Foundation
S00975152-I1-FO
08/09/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Zoning
01/26/2024
Objection raised — Zoning
01/26/2024
Objection raised — Scope
01/26/2024
Objection raised — Zoning
01/26/2024
Objection raised — Fire_Protection
01/26/2024
Objection raised — Energy
12/19/2023
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
S00975152-I1
12/12/2023
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/12/2023
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Metering
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
12/12/2023
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
Latest 60 of 67 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS405/14/2026
EYE CRAVE DESIGN & SERVICES LLC112/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKEN SERVICES CORPGeneral Contractor909/02/2026
FLOW-RIGHT PLBG & HTG CORPlumbing206/28/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472310/28/2025
SRA PLANNING & EXPEDITING5677110/28/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSKEN SERVICES CORP09/01/2026
DOB NOWFoundationPermit IssuedTT & T CONSTRUCTION INC04/09/2026
DOB NOWCurb CutSigned-offTT & T CONSTRUCTION INC04/03/2026
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC11/10/2025
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR10/31/2025
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR10/28/2025
DOB NOWFoundationPermit IssuedTT & T CONSTRUCTION INC09/05/2025
DOB NOWGeneral ConstructionPermit IssuedTT & T CONSTRUCTION INC09/05/2025
DOB NOWFoundationPermit IssuedTT & T CONSTRUCTION INC10/03/2024
DOB NOWFoundationPermit IssuedTT & T CONSTRUCTION INC10/03/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/21/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/20/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
10/27/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
10/27/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
10/27/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/27/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
10/27/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/27/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/27/2025Maintenance informationStanislav Pilipenkoenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/27/2025Sprinkler SystemsStanislav Pilipenkospecial
10/23/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/12/2023Subgrade InspectionsStanislav Pilipenkospecial
12/12/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/12/2023Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/12/2023MeteringStanislav Pilipenkoenergy_progress
12/12/2023Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/12/2023Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/12/2023Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/12/2023Structural Wood FrameStanislav Pilipenkoprogress
12/12/2023Insulation placement and R valuesStanislav Pilipenkoenergy_progress
12/12/2023Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
12/12/2023Air barrier — testing Stanislav Pilipenkoenergy_progress
12/12/2023Interior lighting powerStanislav Pilipenkoenergy_progress
12/12/2023Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
12/12/2023Fenestration air leakageStanislav Pilipenkoenergy_progress
Latest 25 of 31.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026S00975152-S4Request digital key ↗
08/16/2026S00975152-I1Request digital key ↗
08/16/2026S00975152-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00975152-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00975152-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00975152-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026S00975152-I1Open ↗
08/31/2026S00975152-I1Open ↗
08/27/2026S00975152-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026S00975152-I1Open ↗
08/31/2026S00975152-I1Open ↗
08/31/2026S00975152-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026S00975152-S4Open ↗
08/16/2026S00975152-S3Open ↗
08/16/2026S00975152-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00975152-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026S00975152-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00975152-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00975152-I1Open ↗
08/13/2026S00975152-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00975152-S3Open ↗
08/13/2026S00975152-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S00975152-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00975152-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026S00975152-I1Open ↗