STATEN ISLAND
857 IONIA AVENUE
STATEN ISLAND · BIN 5176601
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructural
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FJN DEVELOPMENT2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS503/18/2025
STANLEY M. KREBUSHEVSKI, R.A.206/21/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FJN DEVELOPEMENT CORPGeneral Contractor607/08/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472403/18/2025
SRA PLANNING & EXPEDITING5677503/18/2025
Building Lifecycle
All (63)Filed (7)Permit Issued (6)Signed Off (3)Inspection (13)Objection (4)Special Inspection (30)
05/16/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2025
Signed off — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S1
04/14/2025
Signed off — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S3
04/14/2025
Signed off — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S2
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/21/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/21/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
03/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
03/21/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/18/2025
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-P3
03/18/2025
Permit issued — Mechanical Systems
S00983131-S2-MS
03/07/2025
Permit issued — Curb Cut
S00983131-S3-CC
12/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2024
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S3
10/21/2024
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S2
10/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Fireplaces
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
10/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Heating Systems
Stanislav Pilipenko
10/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/08/2024
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-P2
10/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2024
Permit issued — Structural
S00983131-I1-GC-CX
07/31/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/22/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/18/2024
Permit issued — Plumbing
S55510692-S1-PL
07/18/2024
Permit issued — Plumbing
S00983131-S1-PL
07/15/2024
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-S1
07/10/2024
Special inspection requirement — Final
Stanislav Pilipenko
07/10/2024
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
07/09/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM MONTAGUE
07/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
06/21/2024
Filed — New Building
1)INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING AND COMBI-BOILER WITH FIN-TUBE RADIATORS FOR HEATING OF PRIMARY RESIDENCE.2)INSTALLATION OF SPLIT-SYSTEM HEAT PUMP UNIT FOR HEATING AND COOLING OF APARTMENT RESIDENCE.3)INSTALLATION OF EXHAUST AND ERV
S00983131-P1
05/24/2024
Permit issued — Foundation
S00983131-I1-GC-CX
03/19/2024
Objection resolved — Addressed
02/02/2024
Objection resolved — Addressed
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFJN DEVELOPEMENT03/18/2025
DOB NOWCurb CutSigned-offFJN DEVELOPEMENT03/07/2025
DOB NOWStructuralPermit IssuedFJN DEVELOPEMENT09/04/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/18/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/18/2024
DOB NOWFoundationPermit IssuedFJN DEVELOPEMENT05/24/2024
1 project · most recent 03/18/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2025Signed-offFJN DEVELOPEMENT CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Luxaire AHU: JHETC42FBCS21NA CU: TCD2B42S21SA 36,000 BTU · Split System ×1
AHU: JHETD48GBCS2N1A CU: TCD2B48S21SA 48,000 BTU · Split System ×1
Heat / Cool
Tosot AHU: TWH18ATCXB-D3DNA3AI CU: TM24HMO 22,000 BTU · Heat Pump Outdoor ×1
Heating
Navien NFB-200H 199,900 BTU · Boiler ×1
Ventilation
Fantech ATMO 200H 110 CFM · Erv ×1
N/A N/A - REPLACED WITH SINGLE ERV - 89 CFM · Erv ×1
Panasonic FV-04VE1 30 CFM · Erv ×1
1 project · most recent 03/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/18/2025Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 project · most recent 02/20/2025
General Wiring
FiledStatusContractorScope
02/20/2025CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 03/18/2025
Wood
FiledStatusContractorScope
03/18/2025Signed-offFJN DEVELOPEMENT CORPWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/16/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/22/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
03/21/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
03/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
03/21/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/21/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/21/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/21/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/21/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
03/21/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/21/2025Permanent certificateStanislav Pilipenkoenergy_progress
10/21/2024FireplacesStanislav Pilipenkoenergy_progress
10/21/2024Chimneys and ventsStanislav Pilipenkospecial
10/21/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/21/2024Heating SystemsStanislav Pilipenkospecial
10/21/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/21/2024Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
10/21/2024Maintenance informationStanislav Pilipenkoenergy_progress
10/21/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/21/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
10/21/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/21/2024Permanent certificateStanislav Pilipenkoenergy_progress
10/21/2024Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
07/10/2024Mechanical SystemsStanislav Pilipenkospecial
07/10/2024FinalStanislav Pilipenkoprogress
07/09/2024Structural Steel - WeldingWILLIAM MONTAGUEspecial
07/09/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
Latest 25 of 65.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026S00983131-P3Request digital key ↗
08/20/2026S00983131-S3Request digital key ↗
08/20/2026S00983131-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00983131-P1Open ↗
08/13/2026S00983131-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00983131-P1Open ↗
08/13/2026S00983131-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00983131-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026S00983131-S2Open ↗
08/31/2026S00983131-S2Open ↗
08/31/2026S00983131-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026S00983131-S2Open ↗
08/31/2026S00983131-P1Open ↗
08/31/2026S00983131-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026S00983131-S1Open ↗
08/20/2026S00983131-P3Open ↗
08/20/2026S00983131-S3Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00983131-P1Open ↗
08/13/2026S00983131-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00983131-I1Open ↗
08/13/2026S00983131-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00983131-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00983131-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00983131-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S00983131-I1Open ↗
08/13/2026S00983131-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00983131-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00983131-I1Open ↗
08/13/2026S00983131-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00983131-P1Open ↗
08/13/2026S00983131-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S00983131-P1Open ↗
08/20/2026S00983131-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00983131-I1Open ↗