← Back
Two stories - detached, small or mid-size
214 HOLDEN BOULEVARD
STATEN ISLAND · BIN 5176721
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R3-1Zoning
1,743 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction12p · 2 filings · 20 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1Under Construction12p · 2 filings · 20 docs
CellarUnder Construction14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B36 SERVICES203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE708/07/2026
GREVA STRUCTURAL ENGINEERING PLLC110/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RYAN DESIGN ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 SERVICES INCGeneral Contractor504/09/2026
KDL CONSTRUCTION & DEVELOGeneral Contractor308/04/2026
FLOW-RIGHT PLBG & HTG CORPlumbing106/28/2026
QUALITY PLUMBING, INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159308/07/2026
Building Lifecycle
All (92)Filed (8)Permit Issued (8)Signed Off (2)Violation (3)Inspection (16)Objection (25)Special Inspection (30)
08/28/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/25/2026
Signed off — New Building
New Building - One Family, 3 Story Semi Detached
S01038925-S1
08/14/2026
Special inspection requirement — Insulation placement and R values
Daniel Ryan
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
08/14/2026
Special inspection requirement — Subgrade Inspections
Daniel Ryan
08/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
08/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
08/14/2026
Special inspection requirement — Final
Daniel Ryan
08/14/2026
Special inspection requirement — Footing and Foundation
Daniel Ryan
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
08/14/2026
Special inspection requirement — Air barrier — testing
Daniel Ryan
08/14/2026
Special inspection requirement — Permanent certificate
Daniel Ryan
08/14/2026
Special inspection requirement — Maintenance information
Daniel Ryan
08/14/2026
Special inspection requirement — Metering
Daniel Ryan
08/14/2026
Special inspection requirement — Fenestration air leakage
Daniel Ryan
08/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
Daniel Ryan
08/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
08/14/2026
Special inspection requirement — Fenestration areas
Daniel Ryan
08/14/2026
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
08/14/2026
Special inspection requirement — Interior lighting power
Daniel Ryan
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2026
Filed — New Building
New Building - One Family, 3 Story Semi Detached
S01038925-P2
08/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2026
Permit issued — Curb Cut
S01038925-S1-CC
07/23/2026
Signed off — New Building
New Building - One Family, 3 Story Semi Detached
S01038925-S2
07/23/2026
Filed — Alteration
PLUMBING
S01049431-P2
07/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Filed — Alteration
PLUMBING
S01049431-P1
05/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Permit issued — Foundation
S01038925-I1-GC
04/21/2026
Permit issued — Support of Excavation
S01038925-S2-SE
04/01/2026
Filed — New Building
New Building - One Family, 3 Story Semi Detached
S01038925-P1
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
03/06/2026
Special inspection requirement — Subgrade Inspections
Daniel Ryan
03/06/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
03/06/2026
Special inspection requirement — Final
Daniel Ryan
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
03/06/2026
Special inspection requirement — Footing and Foundation
Daniel Ryan
03/06/2026
Special inspection requirement — Fenestration air leakage
Daniel Ryan
03/06/2026
Special inspection requirement — Fenestration areas
Daniel Ryan
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/18/2026
Permit issued — Plumbing
S28678018-I1-PL
01/08/2026
Permit issued — Plumbing
S01049431-I1-PL
10/27/2025
Objection resolved — Addressed
10/22/2025
Objection raised — Other
10/09/2025
Filed — New Building
New Building - One Family, 3 Story Semi Detached
S01038925-S2
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offKDL CONSTRUCTION & DEVELO08/03/2026
DOB NOWFoundationPermit IssuedKDL CONSTRUCTION & DEVELO04/22/2026
DOB NOWSupport of ExcavationSigned-offKDL CONSTRUCTION & DEVELO04/21/2026
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC02/18/2026
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR01/08/2026
DOB NOWStructuralPermit IssuedB36 SERVICES INC04/24/2025
DOB NOWGeneral ConstructionSigned-offB36 SERVICES INC04/24/2025
DOB NOWStructuralSigned-offB36 SERVICES INC04/24/2025
1 project · most recent 07/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/23/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 12/04/2025
General Wiring
FiledStatusContractorScope
12/04/2025CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 08/07/2026
Wood
FiledStatusContractorScope
08/07/2026Signed-offKDL CONSTRUCTION & DEVELOWood
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/28/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Pass-Final PL - UndergroundPassView ↗
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/14/2026Insulation placement and R valuesDaniel Ryanenergy_progress
08/14/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
08/14/2026Subgrade InspectionsDaniel Ryanspecial
08/14/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
08/14/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/14/2026Energy Code Compliance InspectionsDaniel Ryanprogress
08/14/2026FinalDaniel Ryanprogress
08/14/2026Footing and FoundationDaniel Ryanprogress
08/14/2026Fire-Resistance Rated ConstructionDaniel Ryanprogress
08/14/2026Air barrier — testing Daniel Ryanenergy_progress
08/14/2026Permanent certificateDaniel Ryanenergy_progress
08/14/2026Maintenance informationDaniel Ryanenergy_progress
08/14/2026MeteringDaniel Ryanenergy_progress
08/14/2026Fenestration air leakageDaniel Ryanenergy_progress
08/14/2026Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
08/14/2026Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
08/14/2026Fenestration areasDaniel Ryanenergy_progress
08/14/2026Air barrier - visual inspectionDaniel Ryanenergy_progress
08/14/2026Interior lighting powerDaniel Ryanenergy_progress
03/06/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
03/06/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
03/06/2026Subgrade InspectionsDaniel Ryanspecial
03/06/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/06/2026Energy Code Compliance InspectionsDaniel Ryanprogress
03/06/2026FinalDaniel Ryanprogress
Latest 25 of 38.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026S01038925-I1Request digital key ↗
08/17/2026S01038925-P2Request digital key ↗
08/17/2026S01038925-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026S01038925-P2Open ↗
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026S01038925-P2Open ↗
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature30
08/28/2026S01038925-I1Open ↗
08/28/2026S01038925-I1Open ↗
08/28/2026S01038925-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026S01038925-I1Open ↗
08/17/2026S01038925-P2Open ↗
08/16/2026S01049431-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026S01038925-I1Open ↗
08/28/2026S01038925-I1Open ↗
08/28/2026S01038925-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/17/2026S01038925-I1Open ↗
08/17/2026S01038925-P2Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01038925-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/17/2026S01038925-P2Open ↗
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026S01038925-S2Open ↗
08/13/2026S01038925-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01038925-I1Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification3
08/17/2026S01038925-P2Open ↗
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/17/2026S01038925-P2Open ↗
08/17/2026S01038925-I1Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026S01038925-I1Open ↗
08/17/2026S01038925-P2Open ↗
08/13/2026S01038925-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01038925-S2Open ↗