STATEN ISLAND
1233 ARDEN AVENUE
STATEN ISLAND · BIN 5176762
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT407/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC103/21/2026
VIP EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor506/14/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738207/14/2026
Building Lifecycle
All (50)Filed (4)Permit Issued (7)Signed Off (1)Inspection (9)Objection (2)Special Inspection (27)
08/07/2026
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING SPACES.
S01116151-S2
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
07/28/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
07/28/2026
Special inspection requirement — Mechanical Systems
anthony santoro
07/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
07/28/2026
Special inspection requirement — Final
anthony santoro
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/28/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
07/28/2026
Special inspection requirement — Footing and Foundation
anthony santoro
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
07/28/2026
Special inspection requirement — Interior lighting power
anthony santoro
07/28/2026
Special inspection requirement — Permanent certificate
anthony santoro
07/28/2026
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
07/28/2026
Special inspection requirement — Air barrier — testing
anthony santoro
07/28/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
07/28/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
07/28/2026
Special inspection requirement — Maintenance information
anthony santoro
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/28/2026
Special inspection requirement — Fenestration areas
anthony santoro
07/28/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
07/28/2026
Special inspection requirement — Lighting in dwelling units
anthony santoro
07/28/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
07/14/2026
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING SPACES.
S01116151-P1
06/12/2026
Permit issued — Curb Cut
S01116151-S2-CC
06/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING SPACES.
S01116151-S2
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Permit issued — Foundation
S01116151-I1-GC-CX
03/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2026
Permit issued — General Construction
S01116151-I1-GC-CX
12/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/30/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/23/2025
Permit issued — Plumbing
S81785292-S1-PL
09/22/2025
Permit issued — Plumbing
S01116151-S1-PL
08/21/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING SPACES.
S01116151-S1
07/18/2025
Permit issued — Mechanical Systems
S01116151-I1-GC-CX
07/18/2025
Permit issued — Foundation
S01116151-I1-FO-EA
05/07/2025
Objection resolved — Addressed
11/07/2024
Objection raised — Scope
10/25/2024
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING SPACES.
S01116151-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMAXIMUM CONTRACTING INC06/12/2026
DOB NOWFoundationPermit IssuedMAXIMUM CONTRACTING INC03/13/2026
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC02/18/2026
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC09/23/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR09/22/2025
DOB NOWMechanical SystemsPermit IssuedMAXIMUM CONTRACTING INC07/18/2025
DOB NOWFoundationPermit IssuedMAXIMUM CONTRACTING INC07/18/2025
1 project · most recent 07/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/14/2026Signed-offFLOW-RIGHT PLBG & HTG CORStorm, Water/Sanitary
1 project · most recent 06/08/2026
General Wiring
FiledStatusContractorScope
06/08/2026CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 07/14/2026
Concrete Wood
FiledStatusContractorScope
07/14/2026Signed-offMAXIMUM CONTRACTING INCConcrete, Wood
1 project · most recent 07/14/2026
Earthwork
FiledStatusContractorScope
07/14/2026Signed-offMAXIMUM CONTRACTING INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/30/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/28/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
07/28/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/28/2026Concrete - Cast-In-Placeanthony santorospecial
07/28/2026Subgrade Inspectionsanthony santorospecial
07/28/2026Mechanical Systemsanthony santorospecial
07/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
07/28/2026Finalanthony santoroprogress
07/28/2026Fire-Resistance Rated Constructionanthony santoroprogress
07/28/2026Structural Wood Frameanthony santoroprogress
07/28/2026Footing and Foundationanthony santoroprogress
07/28/2026Energy Code Compliance Inspectionsanthony santoroprogress
07/28/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/28/2026Protection of exposed foundation insulationanthony santoroenergy_progress
07/28/2026Interior lighting poweranthony santoroenergy_progress
07/28/2026Permanent certificateanthony santoroenergy_progress
07/28/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
07/28/2026Air barrier — testing anthony santoroenergy_progress
07/28/2026Fenestration air leakageanthony santoroenergy_progress
07/28/2026Ventilation and air distribution systemanthony santoroenergy_progress
07/28/2026Maintenance informationanthony santoroenergy_progress
07/28/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
07/28/2026Fenestration areasanthony santoroenergy_progress
07/28/2026Air barrier - visual inspectionanthony santoroenergy_progress
07/28/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
Latest 25 of 27.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026S01116151-S1Request digital key ↗
08/16/2026S01116151-S2Request digital key ↗
08/16/2026S01116151-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01116151-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026S01116151-S2Open ↗
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S01116151-I1Open ↗
08/24/2026S01116151-I1Open ↗
08/24/2026S01116151-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S01116151-I1Open ↗
08/24/2026S01116151-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01116151-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026S01116151-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026S01116151-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01116151-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01116151-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026S01116151-P1Open ↗
08/13/2026S01116151-I1Open ↗
▸DOB NOWFinal Survey1
08/16/2026S01116151-I1Open ↗