← Back
STATEN ISLAND
22 HOPE AVENUE
STATEN ISLAND · BIN 5176816
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A M REAL ESTATE CONSTRUCTION2509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT806/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WAHLER PLACE,LLCGeneral Contractor1007/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738306/26/2026
Building Lifecycle
All (64)Filed (6)Permit Issued (11)Signed Off (5)Inspection (10)Objection (2)Special Inspection (30)
08/26/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-I1
08/04/2026
Special inspection requirement — Mechanical Systems
anthony santoro
08/04/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
08/04/2026
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
08/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
08/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
08/04/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/04/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/04/2026
Special inspection requirement — Final
anthony santoro
08/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/04/2026
Special inspection requirement — Footing and Foundation
anthony santoro
08/04/2026
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
08/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/04/2026
Special inspection requirement — Maintenance information
anthony santoro
08/04/2026
Special inspection requirement — Metering
anthony santoro
08/04/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
08/04/2026
Special inspection requirement — Interior lighting power
anthony santoro
08/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/04/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
08/04/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
08/04/2026
Special inspection requirement — Permanent certificate
anthony santoro
08/04/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
08/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
08/04/2026
Special inspection requirement — Air barrier — testing
anthony santoro
08/04/2026
Special inspection requirement — Fenestration areas
anthony santoro
08/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/26/2026
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-P1
06/12/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S1
06/04/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S6
06/01/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S4
04/10/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S3
04/10/2026
Permit issued — Curb Cut
S01078507-S6-CC
04/07/2026
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S6
03/05/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Permit issued — Mechanical Systems
S01078507-I1-GC
01/27/2026
Permit issued — General Construction
S01078507-I1-MS
10/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2025
Permit issued — Plumbing
S01078507-S3-PL
07/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2025
Permit issued — Mechanical Systems
S01078507-I1-ST
04/04/2025
Permit issued — Plumbing
S15983996-S4-PL
01/23/2025
Permit issued — General Construction
S01078507-I1-FO
01/15/2025
Permit issued — Plumbing
S01078507-S4-PL
01/13/2025
Permit issued — Earth Work
S01078507-I1-GC
01/13/2025
Permit issued — General Construction
S01078507-I1-EA
01/09/2025
Permit issued — Foundation
S01078507-S1-FO
10/31/2024
Objection resolved — Addressed
09/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S4
09/12/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
S01078507-S3
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offWAHLER PLACE,LLC04/10/2026
DOB NOWMechanical SystemsPermit IssuedWAHLER PLACE,LLC01/29/2026
DOB NOWGeneral ConstructionSigned-offWAHLER PLACE,LLC01/27/2026
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/28/2025
DOB NOWMechanical SystemsSigned-offWAHLER PLACE,LLC04/07/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/04/2025
DOB NOWGeneral ConstructionSigned-offWAHLER PLACE,LLC01/23/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR01/15/2025
DOB NOWEarth WorkPermit IssuedWAHLER PLACE,LLC01/13/2025
DOB NOWGeneral ConstructionSigned-offWAHLER PLACE,LLC01/13/2025
DOB NOWFoundationSigned-offWAHLER PLACE,LLC01/09/2025
1 project · most recent 06/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/26/2026Signed-offFLOW-RIGHT PLBG & HTG CORStorm, Water/Sanitary
1 project · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 06/26/2026
Wood
FiledStatusContractorScope
06/26/2026Signed-offWAHLER PLACE,LLCWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/04/2026Subgrade Inspectionsanthony santorospecial
08/04/2026Mechanical Systemsanthony santorospecial
08/04/2026Concrete - Cast-In-Placeanthony santorospecial
08/04/2026Wood – Prefabricated I-Joistsanthony santorospecial
08/04/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/04/2026Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
08/04/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/04/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
08/04/2026Structural Wood Frameanthony santoroprogress
08/04/2026Energy Code Compliance Inspectionsanthony santoroprogress
08/04/2026Finalanthony santoroprogress
08/04/2026Fire-Resistance Rated Constructionanthony santoroprogress
08/04/2026Footing and Foundationanthony santoroprogress
08/04/2026Protection of exposed foundation insulationanthony santoroenergy_progress
08/04/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/04/2026Maintenance informationanthony santoroenergy_progress
08/04/2026Meteringanthony santoroenergy_progress
08/04/2026Insulation placement and R valuesanthony santoroenergy_progress
08/04/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/04/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
08/04/2026Interior lighting poweranthony santoroenergy_progress
08/04/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/04/2026Fenestration air leakageanthony santoroenergy_progress
08/04/2026Air barrier - visual inspectionanthony santoroenergy_progress
08/04/2026Permanent certificateanthony santoroenergy_progress
Latest 25 of 62.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026S01078507-S4Request digital key ↗
08/21/2026S01078507-P1Request digital key ↗
08/21/2026S01078507-S6Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
08/23/2024540264514Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 16
08/21/2026S01078507-P1Open ↗
08/21/2026S01078507-S6Open ↗
08/13/2026S01078507-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/23/2024540264514Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01078507-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026S01078507-P1Open ↗
09/02/2026S01078507-P1Open ↗
09/02/2026S01078507-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S01078507-P1Open ↗
08/21/2026S01078507-S6Open ↗
08/13/2026S01078507-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026S01078507-P1Open ↗
09/02/2026S01078507-P1Open ↗
08/27/2026S01078507-S1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/19/2024540264514Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2024540264514Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01078507-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026S01078507-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026S01078507-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01078507-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/19/2024540264514Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/19/2024540264514Open ↗
▸DOB NOWTR5 Test Report1
08/21/2026S01078507-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01078507-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/23/2024540264514Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S01078507-P1Open ↗
08/13/2026S01078507-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
08/22/2024540264514Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
08/22/2024540264514Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/19/2024540264514Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01078507-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026S01078507-I1Open ↗