← Back
Zoned residential, not Manhattan
234 CAMBRIDGE AVENUE
STATEN ISLAND · BIN 5176817
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: 281 ATLANTIC AVENUE LLC · 4,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A E H BUILDERS1604/09/2026
281 ATLANTIC AVENUE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC111/07/2025
CHRIS PONISI, ARCHITECT307/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI203/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.E.H BUILDERS CORPGeneral Contractor504/09/2026
FINE MECHANICAL CORPPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738307/15/2025
Building Lifecycle
All (56)Filed (4)Permit Issued (7)Signed Off (4)Inspection (9)Objection (2)Special Inspection (30)
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2026
Signed off — New Building
Install new 9' concrete curb cut
S01216753-I1
04/06/2026
Signed off — New Building
Install new 9' concrete curb cut
S01216753-S1
04/06/2026
Signed off — New Building
Install new 9' concrete curb cut
S01216753-S3
03/23/2026
Signed off — New Building
Install new 9' concrete curb cut
S01216753-S2
03/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/19/2025
Permit issued — Curb Cut
S01216753-S3-CC
12/16/2025
Permit issued — Mechanical Systems
S01216753-S2-MS
12/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2025
Filed — New Building
Install new 9' concrete curb cut
S01216753-S3
10/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/08/2025
Permit issued — Plumbing
S33894775-S1-PL
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/25/2025
Permit issued — Plumbing
S01216753-S1-PL
07/15/2025
Filed — New Building
Install new 9' concrete curb cut
S01216753-S2
07/08/2025
Special inspection requirement — Mechanical Systems
anthony santoro
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/08/2025
Special inspection requirement — Final
anthony santoro
07/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/08/2025
Special inspection requirement — Maintenance information
anthony santoro
07/08/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
07/08/2025
Special inspection requirement — Shutoff dampers
anthony santoro
07/02/2025
Permit issued — General Construction
S01216753-I1-FO
07/02/2025
Permit issued — Foundation
S01216753-I1-ST
07/01/2025
Permit issued — General Construction
S01216753-I1-GC
06/09/2025
Filed — New Building
Install new 9' concrete curb cut
S01216753-S1
06/08/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Scope
05/29/2025
Filed — New Building
Install new 9' concrete curb cut
S01216753-I1
04/27/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/27/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
04/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
04/27/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
04/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/27/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
04/27/2025
Special inspection requirement — Final
anthony santoro
04/27/2025
Special inspection requirement — Footing and Foundation
anthony santoro
04/27/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/27/2025
Special inspection requirement — Preliminary
anthony santoro
04/27/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
04/27/2025
Special inspection requirement — Metering
anthony santoro
04/27/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
04/27/2025
Special inspection requirement — Air barrier — testing
anthony santoro
04/27/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
04/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/27/2025
Special inspection requirement — Permanent certificate
anthony santoro
04/27/2025
Special inspection requirement — Interior lighting power
anthony santoro
04/27/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA.E.H BUILDERS CORP12/19/2025
DOB NOWMechanical SystemsSigned-offA.E.H BUILDERS CORP12/16/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/08/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP07/25/2025
DOB NOWGeneral ConstructionSigned-offA.E.H BUILDERS CORP07/02/2025
DOB NOWFoundationSigned-offA.E.H BUILDERS CORP07/02/2025
DOB NOWGeneral ConstructionPermit IssuedA.E.H BUILDERS CORP07/01/2025
1 project · most recent 11/07/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/07/2025Signed-offFINE MECHANICAL CORPStorm, Water/Sanitary
1 project · most recent 01/18/2026
General Wiring
FiledStatusContractorScope
01/18/2026CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 11/07/2025
Concrete Wood
FiledStatusContractorScope
11/07/2025Signed-offA.E.H BUILDERS CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/08/2025Mechanical Systemsanthony santorospecial
07/08/2025Energy Code Compliance Inspectionsanthony santoroprogress
07/08/2025Finalanthony santoroprogress
07/08/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/08/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
07/08/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/08/2025Maintenance informationanthony santoroenergy_progress
07/08/2025Ventilation and air distribution systemanthony santoroenergy_progress
07/08/2025Shutoff dampersanthony santoroenergy_progress
04/27/2025Concrete - Cast-In-Placeanthony santorospecial
04/27/2025Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
04/27/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
04/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/27/2025Subgrade Inspectionsanthony santorospecial
04/27/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/27/2025Wood – Prefabricated I-Joistsanthony santorospecial
04/27/2025Finalanthony santoroprogress
04/27/2025Footing and Foundationanthony santoroprogress
04/27/2025Energy Code Compliance Inspectionsanthony santoroprogress
04/27/2025Fire-Resistance Rated Constructionanthony santoroprogress
04/27/2025Preliminaryanthony santoroprogress
04/27/2025Structural Wood Frameanthony santoroprogress
04/27/2025Meteringanthony santoroenergy_progress
04/27/2025Insulation placement and R valuesanthony santoroenergy_progress
04/27/2025Air barrier — testing anthony santoroenergy_progress
Latest 25 of 34.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026S01216753-S3Request digital key ↗
08/19/2026S01216753-I1Request digital key ↗
08/19/2026S01216753-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/01/2024540265210Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/08/2024540265210Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/01/2024540265210Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01216753-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01216753-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01216753-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/26/2026S01216753-S2Open ↗
08/26/2026S01216753-S2Open ↗
08/26/2026S01216753-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026S01216753-S1Open ↗
08/13/2026S01216753-I1Open ↗
08/13/2026S01216753-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026S01216753-S2Open ↗
08/23/2026S01216753-I1Open ↗
08/23/2026S01216753-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/08/2024540265210Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2024540265210Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01216753-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01216753-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01216753-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/19/2026S01216753-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/19/2026S01216753-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026S01216753-S1Open ↗
08/13/2026S01216753-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01216753-I1Open ↗
08/13/2026S01216753-S1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/01/2024540265210Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/08/2024540265210Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/01/2024540265210Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/08/2024540265210Open ↗
▸Other Documents5
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/01/2024540265210Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01216753-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01216753-I1Open ↗
▸DOB NOWFinal Survey1
08/19/2026S01216753-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01216753-I1Open ↗