← Back
Zoned residential, not Manhattan
104 BURKE AVENUE
STATEN ISLAND · BIN 5176837
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3AZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: WALLACE AVENUE BUIDERS, LLC · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 212p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION304/09/2026
WALLACE AVENUE CONST.LLC603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT408/12/2025
ISLAND ENGINEERING ASSOCIATES204/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor204/09/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264208/12/2025
Building Lifecycle
All (59)Filed (6)Permit Issued (4)Signed Off (4)Inspection (15)Objection (4)Special Inspection (26)
02/02/2026
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-I1
01/07/2026
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-S2
01/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/26/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/16/2025
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01109839-I1
12/16/2025
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-S1
12/05/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Scope
11/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/12/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-P1
08/12/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
08/12/2025
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
08/11/2025
Permit issued — Curb Cut
S01163170-S2-CC
07/31/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-S2
07/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01109839-P1
03/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/13/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/27/2025
Permit issued — Plumbing
S01163170-S1-PL
02/26/2025
Permit issued — Plumbing
S01109839-I1-PL
02/21/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-S1
02/19/2025
Permit issued — General Construction
S01163170-I1-GC-CX
02/13/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Scope
01/10/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE.
S01163170-I1
09/11/2024
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01109839-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC08/11/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/27/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/26/2025
DOB NOWGeneral ConstructionPermit IssuedWALLACE AVENUE CONSTR LLC02/19/2025
1 project · most recent 08/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/12/2025Signed-offDUO PLUMBING & HTG CORP.Storm, Water/Sanitary
1 project · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 08/12/2025
Concrete Wood
FiledStatusContractorScope
08/12/2025Signed-offWALLACE AVENUE CONSTR LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/26/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/13/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/12/2025Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
08/12/2025Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
08/12/2025Mechanical SystemsWILLIAM DURDEN, P.E.special
08/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
08/12/2025Subgrade InspectionsWILLIAM DURDEN, P.E.special
08/12/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
08/12/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
08/12/2025FinalWILLIAM DURDEN, P.E.progress
08/12/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
08/12/2025Footing and FoundationWILLIAM DURDEN, P.E.progress
08/12/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
08/12/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
08/12/2025Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
08/12/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
08/12/2025HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
08/12/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
08/12/2025Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
08/12/2025Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
08/12/2025Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/12/2025Fenestration areasWILLIAM DURDEN, P.E.energy_progress
08/12/2025HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
08/12/2025Permanent certificateWILLIAM DURDEN, P.E.energy_progress
08/12/2025Maintenance informationWILLIAM DURDEN, P.E.energy_progress
08/12/2025HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
08/12/2025Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 26.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026S01109839-I1Request digital key ↗
08/19/2026S01109839-P1Request digital key ↗
08/18/2026S01163170-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01163170-P1Open ↗
08/13/2026S01163170-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01163170-I1Open ↗
08/13/2026S01163170-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01163170-I1Open ↗
08/13/2026S01163170-P1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S01109839-I1Open ↗
08/18/2026S01163170-I1Open ↗
08/18/2026S01163170-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026S01163170-P1Open ↗
08/31/2026S01163170-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01163170-P1Open ↗
08/31/2026S01163170-P1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01163170-P1Open ↗
08/13/2026S01163170-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S01163170-I1Open ↗
08/13/2026S01163170-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01163170-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01163170-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01163170-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S01163170-P1Open ↗
08/13/2026S01163170-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01163170-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026S01163170-P1Open ↗
08/13/2026S01163170-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026S01163170-I1Open ↗
08/18/2026S01163170-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01163170-P1Open ↗
08/13/2026S01163170-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01163170-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01163170-I1Open ↗