| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/24/2025 | Signed-off | FJN DEVELOPEMENT CORP | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Guardian AHU: FCMCC4160S002A -
HP: RC360E2S11A 55,000 BTU · Heat Pump Outdoor ×2 Tosot AHU: TWH12AT19D6DI -
HP: TM18D6MO 15,100 BTU · Heat Pump Outdoor ×1 Heating Thermo 2000 ASME BTH ULTRA 27KW 240V 92,100 BTU · Boiler ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Signed-off | DUO PLUMBING & HTG CORP. | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/23/2026 | Complete | SUNRUN SOLAR ELECTL CORP | — |
| 10/02/2025 | Complete | TRUE ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Signed-off | FJN DEVELOPEMENT CORP | Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/16/2026 | Signed-off | SUNRUN INSTALLATION SVC | 89 panels, 40.05 kw, 967 roof_area_sqft |
| Owner | Filings | Most Recent |
|---|---|---|
| FJN DEVELOPMENT | 22 | 04/09/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PARKER AND WEST ENGINEERING, PLLC | 2 | 07/16/2026 |
| STANLEY M. KREBUSHEVSKI, R.A. | 3 | 11/24/2025 |
| C&P DESIGN CONSULTANTS | 4 | 06/11/2025 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| FJN DEVELOPEMENT CORP | General Contractor | 4 | 04/09/2026 |
| SUNRUN INSTALLATION SVC | General Contractor | 1 | 04/09/2026 |
| DUO PLUMBING & HTG CORP. | Plumbing | 1 | 07/08/2026 |
| QUALITY PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PARKER AND WEST ENGINEERI | 5272 | 2 | 07/16/2026 |
| C&P DESIGN CONSULTANT | 8472 | 5 | 11/24/2025 |
| SRA PLANNING & EXPEDITING | 5677 | 4 | 11/24/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Solar | Signed-off | SUNRUN INSTALLATION SVC | 03/31/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FJN DEVELOPEMENT | 10/24/2025 |
| DOB NOW | Curb Cut | Signed-off | FJN DEVELOPEMENT | 10/07/2025 |
| DOB NOW | Foundation | Permit Issued | FJN DEVELOPEMENT | 09/03/2025 |
| DOB NOW | Plumbing | Signed-off | QUALITY PLUMBING, INC | 04/01/2025 |
| DOB NOW | Plumbing | Signed-off | DUO PLUMBING & HTG CORP. | 03/28/2025 |
| DOB NOW | General Construction | Permit Issued | FJN DEVELOPEMENT | 03/11/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 12/01/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/16/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/16/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 10/01/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/16/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 04/10/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/09/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Structural Stability – Alterations of existing buildings | Walid Abdulla | special |
| 07/17/2026 | Air barrier - visual inspection | Walid Abdulla | energy_progress |
| 07/17/2026 | Final | Walid Abdulla | progress |
| 07/17/2026 | Energy Code Compliance Inspections | Walid Abdulla | progress |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | Walid Abdulla | special |
| 06/29/2026 | Air barrier - visual inspection | Walid Abdulla | energy_progress |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | Walid Abdulla | special |
| 06/29/2026 | Structural Stability – Alterations of existing buildings | Walid Abdulla | special |
| 06/29/2026 | Energy Code Compliance Inspections | Walid Abdulla | progress |
| 06/29/2026 | Final | Walid Abdulla | progress |
| 12/01/2025 | Subsurface Investigations (Borings/Test Pits) | WILLIAM MONTAGUE | special |
| 12/01/2025 | Footing and Foundation | Stanislav Pilipenko | progress |
| 12/01/2025 | Structural Wood Frame | Stanislav Pilipenko | progress |
| 12/01/2025 | Final | Stanislav Pilipenko | progress |
| 12/01/2025 | Fire-Resistance Rated Construction | Stanislav Pilipenko | progress |
| 12/01/2025 | Energy Code Compliance Inspections | Stanislav Pilipenko | progress |
| 12/01/2025 | Air barrier — testing | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Fenestration and door U-factor and product ratings | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Electric vehicle service equipment requirements | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Maintenance information | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Insulation placement and R values | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Permanent certificate | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Metering | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Interior lighting power | Stanislav Pilipenko | energy_progress |
| 12/01/2025 | Air barrier - visual inspection | Stanislav Pilipenko | energy_progress |