← Back
Zoned residential, not Manhattan
84 WINHAM AVENUE
STATEN ISLAND · BIN 5176910
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3-1Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: 4043 WINHAM AVENUE LLC · 3,541 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 31p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAVAGNARO CONTRACTING1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/24/2026
JAMES V MORRI411/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVAGNARO CONTRACTING LLCGeneral Contractor207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor106/28/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/24/2026
JAMES V MORRI, RA1042103/31/2025
ROGERS CALVANICO GROUP PL1324103/31/2025
Building Lifecycle
All (53)Filed (5)Permit Issued (4)Signed Off (3)Inspection (9)Objection (2)Special Inspection (30)
06/26/2026
Permit issued — Solar
S01419655-I1-SL
06/24/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01419655-I1
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/24/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/19/2026
Special inspection requirement — Final
Walid Abdulla
03/17/2026
Signed off — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-I1
01/23/2026
Signed off — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-S2
01/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/06/2026
Signed off — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-S1
11/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2025
Filed — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-S2
11/18/2025
Permit issued — Curb Cut
S01194921-S2-CC
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/09/2025
Permit issued — Plumbing
S01194921-S1-PL
05/05/2025
Filed — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-S1
04/17/2025
Permit issued — Foundation
S01194921-I1-GC-CX
04/10/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Scope
03/31/2025
Filed — New Building
10' CURB CUT 851.81' FROM NEW DORP LANE
S01194921-I1
03/13/2025
Special inspection requirement — Final
James Morri
03/13/2025
Special inspection requirement — Lowest Floor Elevation
James Morri
03/13/2025
Special inspection requirement — Footing and Foundation
James Morri
03/13/2025
Special inspection requirement — Energy Code Compliance Inspections
James Morri
03/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
03/13/2025
Special inspection requirement — Structural Wood Frame
James Morri
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Morri
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
James Morri
03/13/2025
Special inspection requirement — Lighting in dwelling units
James Morri
03/13/2025
Special inspection requirement — Fenestration air leakage
James Morri
03/13/2025
Special inspection requirement — Concrete - Cast-In-Place
James Morri
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
03/13/2025
Special inspection requirement — Maintenance information
James Morri
03/13/2025
Special inspection requirement — Insulation placement and R values
James Morri
03/13/2025
Special inspection requirement — Metering
James Morri
03/13/2025
Special inspection requirement — Air barrier — testing
James Morri
03/13/2025
Special inspection requirement — Permanent certificate
James Morri
03/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
03/13/2025
Special inspection requirement — Air barrier - visual inspection
James Morri
03/13/2025
Special inspection requirement — Fenestration areas
James Morri
03/13/2025
Special inspection requirement — Protection of exposed foundation insulation
James Morri
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
03/13/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
James Morri
03/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
03/13/2025
Special inspection requirement — Subgrade Inspections
James Morri
11/19/2024
Filed — New Building
S01139928-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/26/2026
DOB NOWCurb CutSigned-offCAVAGNARO CONTRACTING LLC11/18/2025
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR05/09/2025
DOB NOWFoundationPermit IssuedCAVAGNARO CONTRACTING LLC04/17/2025
1 project · most recent 11/18/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/18/2025Signed-offDJ PLUMBING & HEATING CORStorm, Water/Sanitary
2 projects · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026CompleteSUNRUN SOLAR ELECTL CORP—
07/10/2025CompleteFICHERA ELECTRIC, INCGeneral Wiring
1 project · most recent 11/18/2025
Concrete Wood
FiledStatusContractorScope
11/18/2025Signed-offCAVAGNARO CONTRACTING LLCConcrete, Wood
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Signed-offSUNRUN INSTALLATION SVC15 panels, 6.75 kw, 315.35 roof_area_sqft
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/24/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/24/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/19/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/19/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/19/2026FinalWalid Abdullaprogress
03/13/2025FinalJames Morriprogress
03/13/2025Lowest Floor ElevationJames Morriprogress
03/13/2025Footing and FoundationJames Morriprogress
03/13/2025Energy Code Compliance InspectionsJames Morriprogress
03/13/2025Fire-Resistance Rated ConstructionJames Morriprogress
03/13/2025Structural Wood FrameJames Morriprogress
03/13/2025HVAC-R and service water heating equipmentJames Morrienergy_progress
03/13/2025HVAC-R and service water heating system controlsJames Morrienergy_progress
03/13/2025Lighting in dwelling unitsJames Morrienergy_progress
03/13/2025Fenestration air leakageJames Morrienergy_progress
03/13/2025Concrete - Cast-In-PlaceJames Morrispecial
03/13/2025HVAC-R and service water piping design and insulationJames Morrienergy_progress
03/13/2025Maintenance informationJames Morrienergy_progress
03/13/2025Insulation placement and R valuesJames Morrienergy_progress
03/13/2025MeteringJames Morrienergy_progress
03/13/2025Air barrier — testing James Morrienergy_progress
03/13/2025Permanent certificateJames Morrienergy_progress
03/13/2025Fenestration and door U-factor and product ratingsJames Morrienergy_progress
03/13/2025Air barrier - visual inspectionJames Morrienergy_progress
03/13/2025Fenestration areasJames Morrienergy_progress
Latest 25 of 30.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01139928-I1Request digital key ↗
08/17/2026S01194921-S2Request digital key ↗
08/17/2026S01194921-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01139928-I1Open ↗
08/13/2026S01194921-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01194921-I1Open ↗
08/13/2026S01139928-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01194921-I1Open ↗
08/13/2026S01139928-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026S01194921-I1Open ↗
08/23/2026S01194921-I1Open ↗
08/23/2026S01194921-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026S01194921-I1Open ↗
08/23/2026S01194921-I1Open ↗
08/23/2026S01194921-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S01139928-I1Open ↗
08/17/2026S01194921-S2Open ↗
08/17/2026S01194921-S1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01139928-I1Open ↗
08/13/2026S01194921-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026S01139928-I1Open ↗
08/13/2026S01194921-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01194921-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01194921-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01194921-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026S01139928-I1Open ↗
08/13/2026S01194921-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01139928-I1Open ↗
08/13/2026S01194921-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01139928-I1Open ↗
08/17/2026S01194921-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01194921-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S01194921-I1Open ↗