378 ATLANTIC AVENUE
STATEN ISLAND · BIN 5176918
💬 Discuss this project
2025Year Built
2Stories
A1Building Class
R3-1Zoning
1,900 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.76 FAR built · Flood zone X500
Locations of Work
StructuralFire Protection
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI506/23/2026
A TECH ENGINEERING NYC, PLLC.109/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
JAMES V MORRI, RA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVAGNARO CONTRACTING LLCGeneral Contractor207/08/2026
RITE-FLO P.H.& COOLING INPlumbing207/08/2026
FICHERA ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES V MORRI, RA1042206/23/2026
ROGERS CALVANICO GROUP PL1324106/23/2026
OUTER BOROUGH ENGINEERING9907105/11/2025
Building Lifecycle
All (53)Filed (6)Permit Issued (4)Signed Off (3)Inspection (8)Objection (2)Special Inspection (30)
07/07/2026
Signed off — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-S1
07/07/2026
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S01253344-I1
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
06/30/2026
Special inspection requirement — Subgrade Inspections
James Morri
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
James Morri
06/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PHILIP HOLLNSTEINER
06/30/2026
Special inspection requirement — Wood – Prefabricated I-Joists
James Morri
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
James Morri
06/30/2026
Special inspection requirement — Final
James Morri
06/30/2026
Special inspection requirement — Structural Wood Frame
James Morri
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
06/30/2026
Special inspection requirement — Footing and Foundation
James Morri
06/30/2026
Special inspection requirement — Lighting controls
James Morri
06/30/2026
Special inspection requirement — Permanent certificate
James Morri
06/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Morri
06/30/2026
Special inspection requirement — Insulation placement and R values
James Morri
06/30/2026
Special inspection requirement — Maintenance information
James Morri
06/30/2026
Special inspection requirement — Metering
James Morri
06/30/2026
Special inspection requirement — Fenestration air leakage
James Morri
06/30/2026
Special inspection requirement — Air barrier - visual inspection
James Morri
06/30/2026
Special inspection requirement — Fenestration areas
James Morri
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Morri
06/30/2026
Special inspection requirement — Air barrier — testing
anthony santoro
06/30/2026
Special inspection requirement — Lighting in dwelling units
James Morri
06/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
James Morri
06/24/2026
Signed off — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-S2
06/23/2026
Filed — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-P2
06/22/2026
Special inspection requirement — Concrete - Cast-In-Place
James Morri
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
06/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PHILIP HOLLNSTEINER
06/22/2026
Special inspection requirement — Subgrade Inspections
James Morri
06/22/2026
Special inspection requirement — Wood – Prefabricated I-Joists
James Morri
06/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2026
Permit issued — Curb Cut
S01221973-S2-CC
06/01/2026
Filed — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-S2
05/08/2026
Filed — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-P1
04/02/2026
Permit issued — Plumbing
S01253344-I1-PL
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S01253344-I1
08/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/08/2025
Permit issued — Plumbing
S01221973-S1-PL
08/01/2025
Filed — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-S1
07/11/2025
Permit issued — Structural
S01221973-I1-GC-CX
05/28/2025
Objection resolved — Addressed
05/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/14/2025
Objection raised — Scope
05/11/2025
Filed — New Building
ONE FAMILY SEMI DETACHED RESIDENCE
S01221973-I1
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/16/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCAVAGNARO CONTRACTING LLC06/02/2026
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR04/02/2026
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR08/08/2025
DOB NOWStructuralPermit IssuedCAVAGNARO CONTRACTING LLC07/11/2025
1 project · most recent 09/25/2025
FiledStatusContractorScope
09/25/2025——21 heads
2 projects · most recent 06/23/2026
Water/Sanitary Storm
FiledStatusContractorScope
06/23/2026Signed-offDJ PLUMBING & HEATING CORStorm, Water/Sanitary
09/25/2025Signed-offDJ PLUMBING & HEATING CORWater/Sanitary
1 project · most recent 11/04/2025
General Wiring
FiledStatusContractorScope
11/04/2025CompleteFICHERA ELECTRIC, INCGeneral Wiring
1 project · most recent 06/23/2026
Concrete Wood
FiledStatusContractorScope
06/23/2026Signed-offCAVAGNARO CONTRACTING LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/16/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsJames Morrispecial
06/30/2026Subgrade InspectionsJames Morrispecial
06/30/2026Concrete - Cast-In-PlaceJames Morrispecial
06/30/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPHILIP HOLLNSTEINERspecial
06/30/2026Wood – Prefabricated I-JoistsJames Morrispecial
06/30/2026Energy Code Compliance InspectionsJames Morriprogress
06/30/2026FinalJames Morriprogress
06/30/2026Structural Wood FrameJames Morriprogress
06/30/2026Fire-Resistance Rated ConstructionJames Morriprogress
06/30/2026Footing and FoundationJames Morriprogress
06/30/2026Lighting controlsJames Morrienergy_progress
06/30/2026Permanent certificateJames Morrienergy_progress
06/30/2026Fenestration and door U-factor and product ratingsJames Morrienergy_progress
06/30/2026HVAC-R and service water heating equipmentJames Morrienergy_progress
06/30/2026Insulation placement and R valuesJames Morrienergy_progress
06/30/2026Maintenance informationJames Morrienergy_progress
06/30/2026MeteringJames Morrienergy_progress
06/30/2026Fenestration air leakageJames Morrienergy_progress
06/30/2026Air barrier - visual inspectionJames Morrienergy_progress
06/30/2026Fenestration areasJames Morrienergy_progress
06/30/2026HVAC-R and service water piping design and insulationJames Morrienergy_progress
06/30/2026HVAC-R and service water heating system controlsJames Morrienergy_progress
06/30/2026Air barrier — testing anthony santoroenergy_progress
06/30/2026Lighting in dwelling unitsJames Morrienergy_progress
06/30/2026Electric vehicle service equipment requirementsJames Morrienergy_progress
Latest 25 of 50.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026S01221973-I1Request digital key ↗
08/18/2026S01221973-P2Request digital key ↗
08/18/2026S01221973-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026S01221973-P2Open ↗
08/13/2026S01221973-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026S01221973-P2Open ↗
08/13/2026S01221973-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01221973-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S01221973-I1Open ↗
09/01/2026S01221973-I1Open ↗
09/01/2026S01221973-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026S01221973-P2Open ↗
08/18/2026S01221973-S2Open ↗
08/18/2026S01221973-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S01221973-I1Open ↗
09/01/2026S01221973-I1Open ↗
08/28/2026S01221973-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01221973-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/18/2026S01221973-P2Open ↗
08/13/2026S01221973-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026S01221973-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026S01221973-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01221973-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/18/2026S01221973-P2Open ↗
08/13/2026S01221973-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026S01221973-P2Open ↗
08/13/2026S01221973-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026S01221973-I1Open ↗
08/18/2026S01221973-P2Open ↗
▸DOB NOWFinal Survey1
08/18/2026S01221973-I1Open ↗