← Back
STATEN ISLAND
40 TROY STREET
STATEN ISLAND · BIN 5176944
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof1p · 1 filing · 6 docs
Floor 25p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Basement5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OUR ISLAND PROPERTY MNGNT2004/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS601/24/2026
ETRECTE LLC109/15/2025
C&P DESIGN CONSULTANTS303/13/2025
CHRIS PONISI, ARCHITECT111/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
DAWN PONISI103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OUR ISLAND PROPERTY MANAGGeneral Contractor504/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor104/09/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472801/24/2026
SRA PLANNING & EXPEDITING5677211/21/2025
ETRECTE LLC8116109/15/2025
Building Lifecycle
All (74)Filed (11)Permit Issued (10)Signed Off (7)Inspection (13)Objection (3)Special Inspection (30)
02/02/2026
Signed off — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-I1
01/27/2026
Special inspection requirement — Final
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Maintenance information
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Metering
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Lighting in dwelling units
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
01/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
01/24/2026
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-P3
01/24/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Final
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
01/24/2026
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Lighting in dwelling units
Stanislav Pilipenko
01/24/2026
Special inspection requirement — Maintenance information
Stanislav Pilipenko
01/08/2026
Signed off — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-S4
12/30/2025
Signed off — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-S5
12/22/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Signed off — Alteration
APPLICATION FILED TO INSTALL PLUMBING FIXTURES , NON-GAS WATER HEATERS AND ON-SITE STORM WATER DISPOSAL SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION NUMBER # S01158151-I1
S01176539-I1
12/15/2025
Signed off — Alteration
S01161981-I1
12/15/2025
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-P2
12/14/2025
Signed off — Alteration
S01141117-I1
12/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2025
Objection raised — Scope
11/21/2025
Filed — Alteration
APPLICATION FILED TO INSTALL PLUMBING FIXTURES , NON-GAS WATER HEATERS AND ON-SITE STORM WATER DISPOSAL SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION NUMBER # S01158151-I1
S01176539-P1
11/20/2025
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01158151-P1
11/20/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01286784-I1
10/14/2025
Permit issued — Mechanical Systems
S01158151-S5-MS
10/14/2025
Permit issued — Curb Cut
S01161981-I1-CC
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Permit issued — Solar
S01286784-I1-SL
09/15/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01286784-I1
08/06/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2025
Permit issued — Plumbing
S58967020-I1-PL
07/15/2025
Permit issued — Sprinklers
S01158151-S4-PL
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offOUR ISLAND PROPERTY MANAG10/14/2025
DOB NOWCurb CutSigned-offOUR ISLAND PROPERTY MANAG10/14/2025
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP09/16/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/16/2025
DOB NOWSprinklersSigned-offFLOW-RIGHT PLBG & HTG COR07/15/2025
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP07/15/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/06/2025
DOB NOWGeneral ConstructionPermit IssuedOUR ISLAND PROPERTY MANAG04/08/2025
DOB NOWConstruction FenceSigned-offOUR ISLAND PROPERTY MANAG03/18/2025
DOB NOWConstruction FenceSigned-offOUR ISLAND PROPERTY MANAG11/21/2024
1 job · most recent 01/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/24/2026Signed-offOUR ISLAND PROPERTY MANAGHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot INDOOR UNIT 1: TWH18AT19D6DI INDOOR UNIT 2: TWH09AT19D6DI CONDENSER: TM24D6MO 15,100 BTU · Heat Pump Outdoor ×3
INDOOR UNIT: TUD60-32AH2EDU CONDENSER: TU60-32WEDU 36,000 BTU · Heat Pump Outdoor ×2
Gree INDOOR UNIT: FLEXX60HP230V1BH CONDENSER: FLEXX60HP230V1AO 36,000 BTU · Heat Pump Outdoor ×2
Ventilation
Fantech NAME: ATMO 150E & NUMBER: 463890 170 CFM · Erv ×1
N/A N/A 30 CFM · Erv ×1
1 job · most recent 01/24/2026
Sprinkler System
FiledStatusContractorScope
01/24/2026Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 job · most recent 01/24/2026
Water/Sanitary
FiledStatusContractorScope
01/24/2026Signed-offFLOW-RIGHT PLBG & HTG CORWater/Sanitary
2 jobs · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompleteD AND H ELECTRICAL CONSTGeneral Wiring
09/09/2025CompleteJSP ELECTL CNTNG CORP—
1 job · most recent 01/24/2026
Concrete Wood
FiledStatusContractorScope
01/24/2026Signed-offOUR ISLAND PROPERTY MANAGConcrete, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/22/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
01/27/2026Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
01/27/2026Insulation placement and R valuesStanislav Pilipenkoenergy_progress
01/27/2026Fenestration areasStanislav Pilipenkoenergy_progress
01/27/2026Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
01/27/2026Fenestration air leakageStanislav Pilipenkoenergy_progress
01/27/2026Air barrier — testing Stanislav Pilipenkoenergy_progress
01/27/2026Maintenance informationStanislav Pilipenkoenergy_progress
01/27/2026Permanent certificateStanislav Pilipenkoenergy_progress
01/27/2026Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
01/27/2026MeteringStanislav Pilipenkoenergy_progress
01/27/2026Structural Wood FrameStanislav Pilipenkoprogress
01/27/2026Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
01/27/2026Energy Code Compliance InspectionsStanislav Pilipenkoprogress
01/27/2026Footing and FoundationStanislav Pilipenkoprogress
01/27/2026FinalStanislav Pilipenkoprogress
01/27/2026Concrete - Cast-In-PlaceStanislav Pilipenkospecial
01/27/2026Subgrade InspectionsStanislav Pilipenkospecial
01/27/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/27/2026Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
01/27/2026Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
01/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
01/24/2026Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
01/24/2026FinalStanislav Pilipenkoprogress
01/24/2026Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
01/24/2026Footing and FoundationStanislav Pilipenkoprogress
Latest 25 of 99.
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/20/2026S01141117-I1Request digital key ↗
08/20/2026S01161981-I1Request digital key ↗
08/20/2026S01158151-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S01158151-I1Open ↗
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026S01158151-P3Open ↗
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026S01158151-P3Open ↗
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026S01158151-S4Open ↗
09/01/2026S01158151-P1Open ↗
09/01/2026S01158151-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/01/2026S01158151-P1Open ↗
09/01/2026S01158151-P1Open ↗
09/01/2026S01158151-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026S01158151-I1Open ↗
08/20/2026S01158151-P3Open ↗
08/20/2026S01158151-P2Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P1Open ↗
08/13/2026S01158151-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P3Open ↗
08/13/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01158151-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01158151-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01158151-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT6
08/13/2026S01176539-I1Open ↗
08/13/2026S01176539-P1Open ↗
08/13/2026S01158151-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01176539-I1Open ↗
08/13/2026S01158151-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01158151-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01286784-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026S01158151-P3Open ↗
08/13/2026S01158151-P2Open ↗
08/13/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S01158151-P3Open ↗
08/13/2026S01158151-P1Open ↗
08/13/2026S01158151-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026S01158151-P3Open ↗
08/20/2026S01158151-P2Open ↗
08/15/2026S01158151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026S01158151-I1Open ↗