309 HUSSON STREET
STATEN ISLAND · BIN 5176993
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · 3,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 6 docs
Floor 35p · 1 filing · 20 docs
Floor 2Under Construction5p · 2 filings · 20 docs
Floor 1Under Construction6p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC104/30/2026
C&P DESIGN CONSULTANTS508/29/2025
STANLEY M. KREBUSHEVSKI, R.A.103/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OUR ISLAND PROPERTY MANAGGeneral Contractor307/08/2026
FINE MECHANICAL CORPPlumbing307/08/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854104/30/2026
C&P DESIGN CONSULTANT8472508/29/2025
SRA PLANNING & EXPEDITING5677108/29/2025
Building Lifecycle
All (74)Filed (7)Permit Issued (8)Signed Off (6)Inspection (13)Objection (10)Special Inspection (30)
08/11/2026
Signed off — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-I1
08/05/2026
Signed off — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S4
07/31/2026
Signed off — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S3
07/07/2026
Signed off — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S2
06/17/2026
Signed off — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S1
06/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/11/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01395441-I1
05/20/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/19/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/07/2026
Permit issued — Solar
S01395441-I1-SL
04/30/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01395441-I1
04/30/2026
Permit issued — Plumbing
S82261158-S4-PL
04/30/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
04/30/2026
Special inspection requirement — Final
TOM PETERSEN
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
04/21/2026
Permit issued — Mechanical Systems
S01180631-S2-MS
04/21/2026
Permit issued — Curb Cut
S01180631-S1-CC
03/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2025
Permit issued — Plumbing
S01180631-S4-PL
11/06/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/29/2025
Filed — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S4
08/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Permit issued — Plumbing
S01180631-S3-PL
08/04/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/04/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
08/04/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
08/04/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
WILLIAM MONTAGUE
08/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
08/01/2025
Filed — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S3
07/16/2025
Permit issued — Plumbing
S01211050-I1-PL
07/01/2025
Permit issued — General Construction
S01180631-I1-GC-CX
06/17/2025
Filed — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S1
06/16/2025
Filed — New Building
1)INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01180631-S2
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Final
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
06/10/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP05/07/2026
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/30/2026
DOB NOWMechanical SystemsSigned-offOUR ISLAND PROPERTY MANAG04/21/2026
DOB NOWCurb CutSigned-offOUR ISLAND PROPERTY MANAG04/21/2026
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP12/01/2025
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP08/06/2025
DOB NOWPlumbingPermit IssuedFINE MECHANICAL CORP07/16/2025
DOB NOWGeneral ConstructionPermit IssuedOUR ISLAND PROPERTY MANAG07/01/2025
1 project · most recent 08/29/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/29/2025Signed-offOUR ISLAND PROPERTY MANAGHeating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 08/29/2025
Sprinkler System
FiledStatusContractorScope
08/29/2025——Sprinkler System
04/16/2025——29 heads
2 projects · most recent 08/29/2025
Water/Sanitary Plumbing-Sprinkler Storm
FiledStatusContractorScope
08/29/2025Signed-offFINE MECHANICAL CORPPlumbing-Sprinkler, Storm, Water/Sanitary
04/16/2025Permit IssuedFINE MECHANICAL CORPWater/Sanitary
2 projects · most recent 04/09/2026
General Wiring
FiledStatusContractorScope
04/09/2026CompleteJSP ELECTL CNTNG CORP—
12/08/2025CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 08/29/2025
Wood
FiledStatusContractorScope
08/29/2025Signed-offOUR ISLAND PROPERTY MANAGWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/15/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/20/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/19/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/30/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
04/30/2026FinalTOM PETERSENprogress
04/30/2026Energy Code Compliance InspectionsTOM PETERSENprogress
04/30/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
04/30/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/04/2025Maintenance informationStanislav Pilipenkoenergy_progress
08/04/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
08/04/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/04/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/04/2025Permanent certificateStanislav Pilipenkoenergy_progress
08/04/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
08/04/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
08/04/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/04/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
06/10/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
06/10/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
06/10/2025Mechanical SystemsStanislav Pilipenkospecial
06/10/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
06/10/2025FinalStanislav Pilipenkoprogress
06/10/2025Permanent certificateStanislav Pilipenkoenergy_progress
06/10/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
06/10/2025Maintenance informationStanislav Pilipenkoenergy_progress
06/10/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
06/10/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
Latest 25 of 48.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026S01211050-I1Request digital key ↗
08/18/2026S01180631-S4Request digital key ↗
08/18/2026S01180631-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01180631-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01180631-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01180631-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S01180631-S4Open ↗
09/01/2026S01180631-S4Open ↗
08/31/2026S01395441-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S01180631-S4Open ↗
09/01/2026S01180631-S4Open ↗
09/01/2026S01180631-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026S01180631-S3Open ↗
08/18/2026S01180631-S4Open ↗
08/18/2026S01180631-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01180631-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01180631-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01180631-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026S01180631-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026S01180631-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S01180631-S4Open ↗
08/13/2026S01180631-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01180631-I1Open ↗
08/13/2026S01180631-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026S01395441-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01180631-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/18/2026S01180631-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026S01180631-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01180631-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026S01180631-I1Open ↗