← Back
Zoned residential, not Manhattan
TRUMAN STREET
STATEN ISLAND · BIN 5177021
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R1-2Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: SURFSIDE PROPERTIES INC. · 6,044 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
BasementUnder Construction3p · 1 filing · 20 docs
1 job · most recent 04/02/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/02/2026Permit IssuedSURF SIDE PROPERTIES INCHeating and Air Conditioning Systems, Ventilation Systems
1 job · most recent 01/16/2026
FiledStatusContractorScope
01/16/2026——6 heads
2 jobs · most recent 04/02/2026
Water/Sanitary Storm Plumbing-Sprinkler
FiledStatusContractorScope
04/02/2026Permit IssuedCAPITAL CONTR P&H CORPStorm, Water/Sanitary
01/16/2026——Plumbing-Sprinkler, Water/Sanitary
2 jobs · most recent 09/05/2026
General Wiring
FiledStatusContractorScope
09/05/2026Permit IssuedD AND H ELECTRICAL CONSTGeneral Wiring
01/12/2026Permit IssuedD AND H ELECTRICAL CONST1 meters, 1 new_meters
1 job · most recent 04/02/2026
Wood
FiledStatusContractorScope
04/02/2026Permit IssuedSURF SIDE PROPERTIES INCWood
1 job · most recent 04/02/2026
Fence
FiledStatusContractorScope
04/02/2026Permit IssuedSURF SIDE PROPERTIES INCFence
1 job · most recent 04/02/2026
Earthwork
FiledStatusContractorScope
04/02/2026Permit IssuedSURF SIDE PROPERTIES INCEarthwork
Building Lifecycle
All (55)Filed (6)Permit Issued (4)Inspection (9)Objection (6)Special Inspection (30)
08/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/29/2026
Permit issued — Mechanical Systems
S01194760-S4-MS
05/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Other
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/02/2026
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence- primary dwelling w/ ancillary dwelling, filed under this address.
S01194760-S4
04/01/2026
Permit issued — Plumbing
S01194760-S3-PL
04/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/01/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
04/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/01/2026
Special inspection requirement — Shutoff dampers
anthony santoro
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/01/2026
Special inspection requirement — Maintenance information
anthony santoro
03/26/2026
Special inspection requirement — Mechanical Systems
anthony santoro
03/26/2026
Special inspection requirement — Final
anthony santoro
01/16/2026
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM FOR PROPOSED ANCILLARY DWELLING UNIT (ADU) IN BASEMENT
S01338858-I1
12/15/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence- primary dwelling w/ ancillary dwelling, filed under this address.
S01194760-S3
12/10/2025
Permit issued — Structural
S01194760-I1-GC-CX
12/02/2025
Permit issued — Construction Fence
S01194760-S1-FN
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Scope
11/07/2025
Objection raised — Scope
10/27/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence- primary dwelling w/ ancillary dwelling, filed under this address.
S01194760-S2
10/27/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence- primary dwelling w/ ancillary dwelling, filed under this address.
S01194760-S1
10/25/2025
Filed — New Building
Proposed curb cut filed in conjunction with new two-family residence- primary dwelling w/ ancillary dwelling, filed under this address.
S01194760-I1
05/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/23/2025
Special inspection requirement — Air barrier — testing
anthony santoro
04/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/23/2025
Special inspection requirement — Fenestration areas
anthony santoro
04/23/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/23/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
04/23/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
04/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/23/2025
Special inspection requirement — Interior lighting power
anthony santoro
04/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
04/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/23/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
04/23/2025
Special inspection requirement — Maintenance information
anthony santoro
04/23/2025
Special inspection requirement — Metering
anthony santoro
04/23/2025
Special inspection requirement — Permanent certificate
anthony santoro
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/23/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/23/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/23/2025
Special inspection requirement — Maintenance information
anthony santoro
04/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SURF SIDE PROPERTIES1107/30/2026
SURF SIDE PROPERTIES.INC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.204/02/2026
TONY SAYAD ARCHITECT412/15/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SURF SIDE PROPERTIES INCGeneral Contractor407/30/2026
CAPITAL CONTR P&H CORPPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738304/02/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSURF SIDE PROPERTIES INC07/29/2026
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP04/01/2026
DOB NOWStructuralPermit IssuedSURF SIDE PROPERTIES INC12/10/2025
DOB NOWConstruction FencePermit IssuedSURF SIDE PROPERTIES INC12/02/2025
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
04/01/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/01/2026Ventilation and air distribution systemanthony santoroenergy_progress
04/01/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/01/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/01/2026Shutoff dampersanthony santoroenergy_progress
04/01/2026Energy Code Compliance Inspectionsanthony santoroprogress
04/01/2026Maintenance informationanthony santoroenergy_progress
03/26/2026Mechanical Systemsanthony santorospecial
03/26/2026Finalanthony santoroprogress
04/23/2025Air barrier — testing anthony santoroenergy_progress
04/23/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/23/2025Fenestration areasanthony santoroenergy_progress
04/23/2025Air barrier - visual inspectionanthony santoroenergy_progress
04/23/2025Insulation placement and R valuesanthony santoroenergy_progress
04/23/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
04/23/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/23/2025Interior lighting poweranthony santoroenergy_progress
04/23/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
04/23/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/23/2025Fenestration air leakageanthony santoroenergy_progress
04/23/2025Maintenance informationanthony santoroenergy_progress
04/23/2025Meteringanthony santoroenergy_progress
04/23/2025Permanent certificateanthony santoroenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/23/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
Latest 25 of 46.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026S01338858-I1Request digital key ↗
08/17/2026S01194760-S4Request digital key ↗
08/17/2026S01194760-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/31/2025540266497Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/05/2025540266497Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01194760-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01194760-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01194760-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature7
08/26/2026S01194760-S3Open ↗
08/26/2026S01194760-S3Open ↗
08/26/2026S01194760-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026S01194760-S3Open ↗
08/26/2026S01194760-S3Open ↗
08/26/2026S01194760-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026S01194760-S4Open ↗
08/13/2026S01194760-S3Open ↗
08/13/2026S01194760-S2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/31/2025540266497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/31/2025540266497Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01194760-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01194760-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01194760-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
06/05/2025540266497Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/05/2025540266497Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01194760-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01194760-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/05/2025540266497Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/31/2025540266497Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION3
06/05/2025540266497Open ↗
06/05/2025540266497Open ↗
06/05/2025540266497Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
06/05/2025540266497Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
06/05/2025540266497Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/05/2025540266497Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01194760-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01194760-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01194760-I1Open ↗