← Back
STATEN ISLAND
16 CHURCH AVENUE
STATEN ISLAND · BIN 5177103
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Basement1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONST.LLC503/22/2026
WALLACE AVENUE CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor207/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/18/2026
ISLAND ENGINEERING ASSOCI264106/03/2025
Building Lifecycle
All (60)Filed (5)Permit Issued (5)Signed Off (4)Inspection (14)Objection (2)Special Inspection (30)
08/25/2026
Permit issued — Solar
S01447500-I1-SL
08/18/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01447500-I1
08/18/2026
Special inspection requirement — Final
Walid Abdulla
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/18/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/07/2026
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-I1
04/07/2026
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-S2
04/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/06/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/30/2026
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01229390-I1
03/27/2026
Signed off — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-S1
03/27/2026
Permit issued — Curb Cut
S01229379-S2-CC
03/24/2026
Filed — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-S2
01/23/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/31/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/25/2025
Permit issued — Plumbing
S01229390-I1-PL
07/25/2025
Permit issued — Plumbing
S01229379-S1-PL
07/23/2025
Permit issued — Structural
S01229379-I1-GC-CX
07/21/2025
Objection resolved — Addressed
06/27/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-S1
06/12/2025
Objection raised — Scope
06/03/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY BUILT-IN TWO-CAR GARAGE.
S01229379-I1
06/02/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Metering
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
05/21/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01229390-I1
05/21/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
03/08/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/25/2026
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC03/27/2026
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/25/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/25/2025
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC07/23/2025
1 project · most recent 03/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/24/2026Signed-offDUO PLUMBING & HTG CORP.Storm, Water/Sanitary
2 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
08/28/2025CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 03/24/2026
Concrete Wood
FiledStatusContractorScope
03/24/2026Signed-offWALLACE AVENUE CONSTR LLCConcrete, Wood
1 project · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026Permit IssuedSUNRUN INSTALLATION SVC46 panels, 20.7 kw, 483.52 roof_area_sqft
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/06/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/23/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/31/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2025Pass-Final PL - UndergroundPassView ↗
03/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/18/2026FinalWalid Abdullaprogress
08/18/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/18/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/18/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/18/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/02/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
06/02/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
06/02/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
06/02/2025HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
06/02/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
06/02/2025Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
06/02/2025MeteringWILLIAM DURDEN, P.E.energy_progress
06/02/2025HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
06/02/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
06/02/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
06/02/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
06/02/2025Permanent certificateWILLIAM DURDEN, P.E.energy_progress
06/02/2025Fenestration areasWILLIAM DURDEN, P.E.energy_progress
06/02/2025Maintenance informationWILLIAM DURDEN, P.E.energy_progress
06/02/2025Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
06/02/2025Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
06/02/2025Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
06/02/2025Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
06/02/2025HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
06/02/2025Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 32.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026S01447500-I1Request digital key ↗
08/19/2026S01229390-I1Request digital key ↗
08/19/2026S01229379-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
06/13/2025540266843Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/09/2025540266843Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/09/2025540266843Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01229379-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01229379-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01229379-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026S01229379-I1Open ↗
08/31/2026S01229379-I1Open ↗
08/27/2026S01447500-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026S01447500-I1Open ↗
08/19/2026S01229390-I1Open ↗
08/19/2026S01229379-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026S01229379-I1Open ↗
08/31/2026S01229379-I1Open ↗
08/27/2026S01447500-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/09/2025540266843Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01229379-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01229379-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01229379-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/19/2026S01229379-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/19/2026S01229379-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
06/13/2025540266843Open ↗
05/09/2025540266843Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01229379-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01229379-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/13/2025540266843Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/09/2025540266843Open ↗
▸Other Documents5
▸BISWAIVER OF CURB ALIGNMENT1
06/13/2025540266843Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01229379-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026S01229379-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01229379-I1Open ↗
▸DOB NOWFinal Survey1
08/19/2026S01229379-I1Open ↗