← Back
STATEN ISLAND
911 RATHBUN AVENUE
STATEN ISLAND · BIN 5177119
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS1207/08/2026
BEYER CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS306/17/2026
STANLEY M. KREBUSHEVSKI, R.A.108/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMK ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor307/08/2026
CAPITAL CONTR P&H CORPPlumbing106/27/2026
QUALITY PLUMBING, INCPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472312/08/2025
SRA PLANNING & EXPEDITING5677212/08/2025
Building Lifecycle
All (44)Filed (4)Permit Issued (5)Signed Off (1)Violation (2)Inspection (5)Special Inspection (27)
09/18/2026
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257133-S2
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Permit issued — Plumbing
S64913171-S1-PL
06/18/2026
Permit issued — Curb Cut
S01257133-S3-CC
06/17/2026
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257133-S3
01/26/2026
Permit issued — Mechanical Systems
S01257133-S2-MS
01/14/2026
Violation issued (ECB, closed)
Construction
01/12/2026
Violation issued (ECB, closed)
Construction
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2025
Permit issued — Plumbing
S01257133-S1-PL
12/08/2025
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257133-S2
12/08/2025
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257133-S1
12/08/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
11/17/2025
Permit issued — General Construction
S01257133-I1-GC-CX
08/22/2025
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257133-I1
08/06/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
08/06/2025
Special inspection requirement — Final
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Metering
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
07/16/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM MONTAGUE
07/16/2025
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
07/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
07/16/2025
Special inspection requirement — Final
Stanislav Pilipenko
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC06/25/2026
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION CORP06/18/2026
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION01/26/2026
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP12/12/2025
DOB NOWGeneral ConstructionPermit IssuedBEYER CONSTRUCTION11/17/2025
1 project · most recent 06/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026Signed-offBEYER CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Apower INDOOR UNIT: APF36HP230VAI-R32 OUTDOOR UNIT: APFH36HP230VAO-R32 3 tons · Heat Pump Outdoor ×4
Aux Cloud Commerce INDOOR UNIT: AFEB09HP230V1CH OUTDOOR UNIT: ASPR18HPMULO 1 tons · Heat Pump Outdoor ×2
INDOOR UNIT: AFEB12HP230V1CH OUTDOOR UNIT: ASPR18HPMULO 1 tons · Heat Pump Outdoor ×2
Ventilation
Panasonic FV-14ES1 70 CFM · Erv ×1
1 project · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
12/08/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/06/2025Mechanical SystemsStanislav Pilipenkospecial
08/06/2025FinalStanislav Pilipenkoprogress
07/16/2025Footing and FoundationStanislav Pilipenkoprogress
07/16/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
07/16/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
07/16/2025Structural Wood FrameStanislav Pilipenkoprogress
07/16/2025Maintenance informationStanislav Pilipenkoenergy_progress
07/16/2025Permanent certificateStanislav Pilipenkoenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
07/16/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
07/16/2025Interior lighting powerStanislav Pilipenkoenergy_progress
07/16/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
07/16/2025Fenestration areasStanislav Pilipenkoenergy_progress
07/16/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
07/16/2025MeteringStanislav Pilipenkoenergy_progress
07/16/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
07/16/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
07/16/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
07/16/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
07/16/2025Structural Steel - WeldingWILLIAM MONTAGUEspecial
07/16/2025Subgrade InspectionsWILLIAM MONTAGUEspecial
Latest 25 of 27.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026S01257133-S3Request digital key ↗
08/17/2026S01257133-I1Request digital key ↗
08/17/2026S01257133-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01257133-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01257133-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01257133-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026S01257133-S2Open ↗
09/23/2026S01257133-S2Open ↗
09/23/2026S01257133-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S01257133-S2Open ↗
08/30/2026S01257133-I1Open ↗
08/30/2026S01257133-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026S01257133-S3Open ↗
08/13/2026S01257133-I1Open ↗
08/13/2026S01257133-S1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01257133-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026S01257133-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01257133-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S01257133-I1Open ↗
08/13/2026S01257133-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01257133-S1Open ↗
08/13/2026S01257133-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01257133-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01257133-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01257133-I1Open ↗