← Back
Zoned residential, not Manhattan
86 SPRAGUE AVENUE
STATEN ISLAND · BIN 5177133
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: HARBOR COURT ESTATES LLC · 4,550 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralFire Protection
Floor 22p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
86 SPRAGUE DEVELOPMENT2504/11/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS501/16/2026
STANLEY M. KREBUSHEVSKI, R.A.206/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor604/09/2026
PREMIER PL,HTG & MECH INCPlumbing207/08/2026
K.M.D MECHANICAL 1443 LLCFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472501/16/2026
SRA PLANNING & EXPEDITING5677109/18/2025
Building Lifecycle
All (95)Filed (7)Permit Issued (8)Signed Off (6)Inspection (12)Objection (32)Special Inspection (30)
05/07/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-I1
04/09/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-S5
04/06/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-S2
04/03/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/02/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-S3
03/30/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-S4
02/09/2026
Signed off — New Building
Temporary Consruction Fence
S01234729-S1
02/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/30/2026
Permit issued — Curb Cut
S01234729-S2-CC
01/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/20/2026
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/16/2026
Filed — New Building
Temporary Consruction Fence
S01234729-P1
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/16/2026
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2025
Filed — New Building
Temporary Consruction Fence
S01234729-S2
11/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
11/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Permit issued — Plumbing
S01234729-S4-EW-SP
10/31/2025
Permit issued — Plumbing
S01234729-S4-PL
10/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/30/2025
Permit issued — Plumbing
S88321531-S5-PL
09/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/29/2025
Permit issued — Mechanical Systems
S01234729-S3-MS
09/25/2025
Permit issued — Plumbing
S01234729-S5-PL
09/18/2025
Filed — New Building
Temporary Consruction Fence
S01234729-S5
09/12/2025
Permit issued — Foundation
S01234729-I1-GC-CX
09/11/2025
Filed — New Building
Temporary Consruction Fence
S01234729-S4
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/15/2025
Filed — New Building
Temporary Consruction Fence
S01234729-S3
07/15/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
07/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
07/15/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
07/15/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
07/10/2025
Special inspection requirement — Final
Stanislav Pilipenko
07/10/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
06/25/2025
Objection raised — Zoning
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION01/30/2026
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC10/31/2025
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC10/31/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/30/2025
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION09/29/2025
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC09/25/2025
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION09/12/2025
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION06/18/2025
1 project · most recent 01/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/16/2026Signed-offBEYER CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Apower Indoor Unit: APF36HP230VAI-R32 Outdoor Unit: APFH36HP230VAO-R32 47,900 BTU · Heat Pump Outdoor ×2
Indoor Unit: APF36HP230VAI-R32 Outside Unit: APFH36HP230VAO-R32 47,900 BTU · Heat Pump Outdoor ×2
Aux Cloud Commerce Indoor Unit 1: AFEB09HP230V1CH Indoor Unit 2: AFEB09HP230V1CH Outdoor Unit: ASPR18HPMULO 11,000 BTU · Heat Pump Outdoor ×4
Ventilation
Panasonic FV-10VE2 89 CFM · Erv ×2
1 project · most recent 01/16/2026
Sprinkler System
FiledStatusContractorScope
01/16/2026Signed-offK.M.D MECHANICAL 1443 LLCSprinkler System
1 project · most recent 01/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/16/2026Signed-offPREMIER PL,HTG & MECH INCStorm, Water/Sanitary
2 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Permit IssuedHI VOLTAGE ELECTRIC INCGeneral Wiring
12/11/2025CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 01/16/2026
Wood
FiledStatusContractorScope
01/16/2026Signed-offBEYER CONSTRUCTION CORPWood
1 project · most recent 01/16/2026
Fence
FiledStatusContractorScope
01/16/2026Signed-offBEYER CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/03/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
01/20/2026Sprinkler SystemsStanislav Pilipenkospecial
01/20/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/16/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/16/2026Sprinkler SystemsStanislav Pilipenkospecial
07/15/2025Permanent certificateStanislav Pilipenkoenergy_progress
07/15/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
07/15/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
07/15/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
07/15/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
07/15/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
07/15/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
07/15/2025Maintenance informationStanislav Pilipenkoenergy_progress
07/15/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
07/10/2025FinalStanislav Pilipenkoprogress
07/10/2025Mechanical SystemsStanislav Pilipenkospecial
06/02/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
06/02/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
06/02/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
06/02/2025MeteringStanislav Pilipenkoenergy_progress
06/02/2025Permanent certificateStanislav Pilipenkoenergy_progress
06/02/2025Interior lighting powerStanislav Pilipenkoenergy_progress
06/02/2025Fenestration areasStanislav Pilipenkoenergy_progress
06/02/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
06/02/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
06/02/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
Latest 25 of 35.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026S01234729-P1Request digital key ↗
08/17/2026S01234729-S5Request digital key ↗
08/17/2026S01234729-S4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
07/07/2025540267218Open ↗
06/13/2025540267218Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/29/2025540267218Open ↗
06/13/2025540267218Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/13/2025540267218Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01234729-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01234729-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01234729-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026S01234729-P1Open ↗
08/17/2026S01234729-S5Open ↗
08/17/2026S01234729-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S01234729-S3Open ↗
09/23/2026S01234729-S4Open ↗
09/01/2026S01234729-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026S01234729-S3Open ↗
09/23/2026S01234729-S3Open ↗
09/01/2026S01234729-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/13/2025540267218Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/13/2025540267218Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01234729-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01234729-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01234729-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01234729-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01234729-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026S01234729-S5Open ↗
08/13/2026S01234729-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01234729-S5Open ↗
08/13/2026S01234729-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
06/13/2025540267218Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
07/07/2025540267218Open ↗
06/13/2025540267218Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/13/2025540267218Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION2
07/07/2025540267218Open ↗
07/07/2025540267218Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026S01234729-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01234729-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01234729-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01234729-I1Open ↗