← Back
STATEN ISLAND
116 PLEASANT PLAINS AVENUE
STATEN ISLAND · BIN 5177208
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 2 filings · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
BasementUnder Construction4p · 1 filing · 20 docs
1 job · most recent 03/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedSTOUT HOMES INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree ×8
3 jobs · most recent 05/15/2026
Water/Sanitary Storm Plumbing-Sprinkler
FiledStatusContractorScope
05/15/2026——Plumbing-Sprinkler, Water/Sanitary
03/27/2026Permit IssuedDUO PLUMBING & HTG CORP.Storm, Water/Sanitary
08/19/2025——Storm, Water/Sanitary
1 job · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026Permit IssuedLMS ELECTRICAL CORPGeneral Wiring
1 job · most recent 03/27/2026
Concrete Wood
FiledStatusContractorScope
03/27/2026Permit IssuedDUO PLUMBING & HTG CORP.Concrete, Wood
1 job · most recent 09/12/2025
Fence
FiledStatusContractorScope
09/12/2025Permit IssuedSTOUT HOMES INCFence
Building Lifecycle
All (81)Filed (7)Permit Issued (3)Inspection (3)Objection (38)Special Inspection (30)
08/27/2026
Permit issued — Construction Fence
S01272304-I1-FN
08/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2026
Permit issued — Plumbing
S01344593-S1-PL
06/30/2026
Permit issued — Structural
S01344593-I1-GC-CX
06/08/2026
Objection resolved — Addressed
05/15/2026
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01385128-I1
05/13/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Addressed
03/27/2026
Filed — New Building
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE DEVELOPMENT OF (1) SEMI-ATTACHED 2-FAMILY 3-STORY RESIDENTIAL BUILDING ON EACH OF SEPARATE ZONING LOTS WITH (3) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01344593-S1
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/17/2026
Filed — Alteration
APPLICATION IS FILED FOR THE CONSTRUCTION OF A NEW 8' WIDE CURB CUT. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO NEW CERTIFICATE OF OCCUPANCY TO BE ISSUED UNDER THIS APPLICATION.
S01262844-P1
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Energy
02/05/2026
Objection raised — Fire_Protection
02/05/2026
Objection raised — Structural
02/05/2026
Objection raised — Scope
02/05/2026
Objection raised — Inspections
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Admin
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Structural
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Accessibility
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Fire_Protection
02/05/2026
Objection raised — Structural
02/05/2026
Objection raised — Structural
02/05/2026
Objection raised — Other
01/16/2026
Filed — New Building
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE DEVELOPMENT OF (1) SEMI-ATTACHED 2-FAMILY 3-STORY RESIDENTIAL BUILDING ON EACH OF SEPARATE ZONING LOTS WITH (3) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01344593-I1
01/09/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
01/09/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
01/09/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
01/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
Latest 60 of 81 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.105/15/2026
THINK DESIGN ARCHITECTURE703/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STOUT HOMES INCGeneral Contractor208/30/2026
DUO PLUMBING & HTG CORP.Plumbing107/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738101/16/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSTOUT HOMES INC08/27/2026
DOB NOWPlumbingPermit IssuedDUO PLUMBING & HTG CORP.07/07/2026
DOB NOWStructuralPermit IssuedSTOUT HOMES INC06/30/2026
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
03/25/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/25/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/25/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/25/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/09/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/09/2026Fire-Resistance Rated Constructionanthony santoroprogress
01/09/2026Structural Wood Frameanthony santoroprogress
01/09/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/09/2026Permanent certificateanthony santoroenergy_progress
01/09/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/09/2026Protection of exposed foundation insulationanthony santoroenergy_progress
01/09/2026Insulation placement and R valuesanthony santoroenergy_progress
01/09/2026Air barrier — testing anthony santoroenergy_progress
01/09/2026Fenestration air leakageanthony santoroenergy_progress
01/09/2026Ventilation and air distribution systemanthony santoroenergy_progress
01/09/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
01/09/2026Interior lighting poweranthony santoroenergy_progress
01/09/2026Maintenance informationanthony santoroenergy_progress
01/09/2026Air barrier - visual inspectionanthony santoroenergy_progress
01/09/2026Meteringanthony santoroenergy_progress
01/09/2026Mechanical Systemsanthony santorospecial
01/09/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
01/09/2026Fenestration areasanthony santoroenergy_progress
01/09/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/09/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
Latest 25 of 66.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026S01272018-I1Request digital key ↗
08/18/2026S01272018-S1Request digital key ↗
08/18/2026S01272304-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026S01344593-I1Open ↗
08/13/2026S01344593-I1Open ↗
08/13/2026S01272018-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01344593-I1Open ↗
08/13/2026S01272018-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01272018-I1Open ↗
08/13/2026S01344593-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S01344593-S1Open ↗
09/01/2026S01344593-S1Open ↗
08/27/2026S01344593-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026S01344593-S1Open ↗
08/17/2026S01344593-I1Open ↗
08/16/2026S01385128-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026S01344593-I1Open ↗
08/27/2026S01344593-I1Open ↗
08/27/2026S01344593-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01344593-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026S01344593-I1Open ↗
08/13/2026S01272018-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S01344593-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01272018-I1Open ↗
08/13/2026S01344593-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S01272018-I1Open ↗
08/13/2026S01344593-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01344593-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026S01272018-I1Open ↗
08/13/2026S01344593-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01344593-I1Open ↗
08/13/2026S01272018-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026S01344593-I1Open ↗
08/13/2026S01272018-I1Open ↗