← Back
Building
837 IONIA AVENUE
BIN 5177274
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
BasementUnder Construction13p · 2 filings · 20 docs
1 job · most recent 04/15/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/15/2026Permit IssuedFJN DEVELOPEMENT CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
1 job · most recent 04/15/2026
Wood
FiledStatusContractorScope
04/15/2026Permit IssuedFJN DEVELOPEMENT CORPWood
Building Lifecycle
All (53)Filed (3)Permit Issued (4)Inspection (6)Objection (10)Special Inspection (30)
08/19/2026
Permit issued — Mechanical Systems
S01292801-S1-MS
08/05/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
07/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/20/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/13/2026
Permit issued — Plumbing
S89062628-S2-PL
05/06/2026
Permit issued — Plumbing
S01292801-S2-PL
04/15/2026
Filed — New Building
INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING.
S01292801-S1
04/15/2026
Filed — New Building
INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING.
S01292801-S2
04/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
04/10/2026
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
04/10/2026
Special inspection requirement — Maintenance information
Stanislav Pilipenko
04/10/2026
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
03/31/2026
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
03/31/2026
Special inspection requirement — Final
Stanislav Pilipenko
01/27/2026
Permit issued — Foundation
S01292801-I1-GC-CX
12/19/2025
Objection resolved — Addressed
12/19/2025
Objection resolved — Addressed
12/19/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Zoning
12/05/2025
Objection raised — Fire_Protection
12/05/2025
Objection raised — Admin
12/05/2025
Objection raised — Fire_Protection
12/05/2025
Objection raised — Energy
11/10/2025
Filed — New Building
INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING.
S01292801-I1
09/24/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Metering
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM MONTAGUE
09/24/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
09/24/2025
Special inspection requirement — Final
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
09/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FJN DEVELOPMENT908/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS204/15/2026
STANLEY M. KREBUSHEVSKI, R.A.111/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FJN DEVELOPEMENT CORPGeneral Contractor208/20/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472304/15/2026
SRA PLANNING & EXPEDITING5677204/15/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedFJN DEVELOPEMENT CORP08/19/2026
DOB NOWPlumbingPermit IssuedDUO PLUMBING & HTG CORP.05/13/2026
DOB NOWPlumbingPermit IssuedQUALITY PLUMBING, INC05/06/2026
DOB NOWFoundationPermit IssuedFJN DEVELOPEMENT01/27/2026
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/05/2026Fail-Final SD - Fire PumpFailView ↗
07/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2026Pass-Final PL - UndergroundPassView ↗
05/20/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/10/2026Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
04/10/2026HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/10/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/10/2026Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/10/2026HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/10/2026HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/10/2026Permanent certificateStanislav Pilipenkoenergy_progress
04/10/2026Maintenance informationStanislav Pilipenkoenergy_progress
04/10/2026Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
03/31/2026Mechanical SystemsStanislav Pilipenkospecial
03/31/2026FinalStanislav Pilipenkoprogress
09/24/2025Fenestration areasStanislav Pilipenkoenergy_progress
09/24/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
09/24/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
09/24/2025Maintenance informationStanislav Pilipenkoenergy_progress
09/24/2025MeteringStanislav Pilipenkoenergy_progress
09/24/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
09/24/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
09/24/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
09/24/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
09/24/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
09/24/2025Permanent certificateStanislav Pilipenkoenergy_progress
09/24/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
09/24/2025Structural Steel - WeldingWILLIAM MONTAGUEspecial
09/24/2025Subgrade InspectionsStanislav Pilipenkospecial
Latest 25 of 32.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026S01292801-S1Request digital key ↗
08/17/2026S01292801-I1Request digital key ↗
08/17/2026S01292801-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01292801-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01292801-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01292801-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026S01292801-I1Open ↗
08/24/2026S01292801-I1Open ↗
08/24/2026S01292801-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026S01292801-I1Open ↗
08/24/2026S01292801-I1Open ↗
08/24/2026S01292801-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026S01292801-S1Open ↗
08/17/2026S01292801-S2Open ↗
08/13/2026S01292801-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01292801-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026S01292801-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01292801-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/17/2026S01292801-S2Open ↗
08/13/2026S01292801-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026S01292801-S2Open ↗
08/13/2026S01292801-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01292801-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01292801-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01292801-I1Open ↗