← Back
Four families
116 RIDGEWOOD PLACE
STATEN ISLAND · BIN 5177286
💬 Discuss this project
1948Year Built
2Stories
C3Building Class
R3-2Zoning
2,856 sfGross Floor Area
4Units
Four families · Owner of record: CARA ASSOCIATES INC · 5,586 sf lot · 0.51 FAR built
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS PONISI, ARCHITECT307/14/2026
A TECH ENGINEERING NYC, PLLC.206/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TREDENT CONTRACTING SERVIGeneral Contractor207/30/2026
CROWN PLUMBING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738305/27/2026
Building Lifecycle
All (44)Filed (5)Permit Issued (3)Inspection (4)Objection (2)Special Inspection (30)
08/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2026
Permit issued — Foundation
S01311538-I1-GC-CX
07/14/2026
Filed — New Building
APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS.
S01311538-S4
07/08/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/26/2026
Filed — New Building
APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS.
S01311538-S2
06/26/2026
Permit issued — Plumbing
S01311538-S1-PL
06/01/2026
Permit issued — Structural
S01311538-I1-GC-CX
05/27/2026
Filed — New Building
APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS.
S01311538-S3
05/04/2026
Special inspection requirement — Ventilation and air distribution system
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/07/2026
Special inspection requirement — Mechanical Systems
anthony santoro
04/07/2026
Special inspection requirement — Final
anthony santoro
03/31/2026
Objection raised — Scope
03/31/2026
Objection resolved — Addressed
03/23/2026
Filed — New Building
APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS.
S01311538-S1
03/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/22/2026
Special inspection requirement — Maintenance information
anthony santoro
03/22/2026
Special inspection requirement — Permanent certificate
anthony santoro
03/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/22/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
03/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/22/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/17/2026
Filed — New Building
APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS.
S01311538-I1
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/30/2025
Special inspection requirement — Fenestration areas
anthony santoro
10/30/2025
Special inspection requirement — Maintenance information
anthony santoro
10/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
10/30/2025
Special inspection requirement — Metering
anthony santoro
10/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
10/30/2025
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
10/30/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
10/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
10/30/2025
Special inspection requirement — Interior lighting power
anthony santoro
10/30/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/30/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedTREDENT CONTRACTING SERVI07/29/2026
DOB NOWPlumbingPermit IssuedCROWN PLUMBING INC06/26/2026
DOB NOWStructuralPermit IssuedTREDENT CONTRACTING SERVI06/01/2026
1 project · most recent 07/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/14/2026Permit IssuedTREDENT CONTRACTING SERVIHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 07/14/2026
Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/14/2026Permit IssuedCROWN PLUMBING INCPlumbing-Sprinkler, Water/Sanitary
1 project · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 07/14/2026
FiledStatusContractorScope
07/14/2026Permit IssuedTREDENT CONTRACTING SERVI1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
05/04/2026Ventilation and air distribution system—energy_progress
05/04/2026HVAC-R and service water heating equipment—energy_progress
05/04/2026HVAC-R and service water heating system controls—energy_progress
05/04/2026HVAC-R and service water piping design and insulation—energy_progress
04/07/2026Mechanical Systemsanthony santorospecial
04/07/2026Finalanthony santoroprogress
03/22/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/22/2026Maintenance informationanthony santoroenergy_progress
03/22/2026Permanent certificateanthony santoroenergy_progress
03/22/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/22/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
03/22/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
03/22/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
03/22/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/22/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/17/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/30/2025Fenestration areasanthony santoroenergy_progress
10/30/2025Maintenance informationanthony santoroenergy_progress
10/30/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
10/30/2025Meteringanthony santoroenergy_progress
10/30/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
10/30/2025Protection of exposed foundation insulationanthony santoroenergy_progress
10/30/2025Insulation placement and R valuesanthony santoroenergy_progress
10/30/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/30/2025Interior lighting poweranthony santoroenergy_progress
Latest 25 of 40.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026S01311538-I1Request digital key ↗
08/17/2026S01311538-S4Request digital key ↗
08/17/2026S01311538-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026S01311538-S4Open ↗
08/17/2026S01311538-S3Open ↗
08/17/2026S01311538-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026S01311538-S1Open ↗
08/26/2026S01311538-S1Open ↗
08/25/2026S01311538-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026S01311538-S1Open ↗
08/26/2026S01311538-S1Open ↗
08/25/2026S01311538-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026S01311538-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026S01311538-I1Open ↗