← Back
STATEN ISLAND
60 CONCORD LANE
STATEN ISLAND · BIN 5177303
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
Cellar1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BELAL SALIM208/27/2026
Building Lifecycle
All (31)Filed (2)Objection (10)Special Inspection (19)
08/27/2026
Filed — New Building
PROPOSED NEW 2 STORY WITH CELLAR; 1 FAMILY NEW BUILDING.
S01301130-S4
06/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/26/2026
Special inspection requirement — Interior lighting power
06/26/2026
Special inspection requirement — Maintenance information
06/26/2026
Special inspection requirement — Metering
04/14/2026
Objection raised — Structural
04/14/2026
Objection raised — Mechanical
04/14/2026
Objection raised — Structural
04/09/2026
Objection raised — Admin
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Energy
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Admin
03/25/2026
Filed — New Building
PROPOSED NEW 2 STORY WITH CELLAR; 1 FAMILY NEW BUILDING.
S01301130-I1
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/25/2026
Special inspection requirement — Fenestration areas
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — Permanent certificate
03/25/2026
Special inspection requirement — Fenestration air leakage
03/25/2026
Special inspection requirement — Air barrier — testing
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Special inspection requirement — Air barrier - visual inspection
03/25/2026
Special inspection requirement — Insulation placement and R values
03/25/2026
Special inspection requirement — Ventilation and air distribution system
10/10/2025
Special inspection requirement — Mechanical Systems
10/10/2025
Special inspection requirement — Final
10/10/2025
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 08/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026——Heating and Air Conditioning Systems
Heat / Cool
Goodman GLZS4BA6010AA 120,000 BTU · Condensing Unit ×2
1 project · most recent 08/27/2026
Wood
FiledStatusContractorScope
08/27/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/26/2026Duct leakage testing, insulation and design—energy_progress
06/26/2026Electric vehicle service equipment requirements—energy_progress
06/26/2026Interior lighting power—energy_progress
06/26/2026Maintenance information—energy_progress
06/26/2026Metering—energy_progress
03/25/2026Fenestration and door U-factor and product ratings—energy_progress
03/25/2026Fenestration areas—energy_progress
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026Permanent certificate—energy_progress
03/25/2026Fenestration air leakage—energy_progress
03/25/2026Air barrier — testing —energy_progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Air barrier - visual inspection—energy_progress
03/25/2026Insulation placement and R values—energy_progress
03/25/2026Ventilation and air distribution system—energy_progress
10/10/2025Mechanical Systems—special
10/10/2025Final—progress
10/10/2025Footing and Foundation—progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01301130-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026S01301130-I1Open ↗
08/13/2026S01301130-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S01301130-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01301130-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026S01301130-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026S01301130-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026S01301130-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/14/2026S01301130-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026S01301130-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S01301130-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026S01301130-I1Open ↗