← Back
STATEN ISLAND
63 QUEENSDALE STREET
STATEN ISLAND · BIN 5177330
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 1
Cellar1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE305/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HITECH RENOVATIONS CORPGeneral Contractor107/08/2026
Building Lifecycle
All (60)Filed (3)Permit Issued (1)Objection (26)Special Inspection (30)
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
06/09/2026
Permit issued — Construction Fence
S01382382-I1-FN
06/01/2026
Objection raised — Inspections
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Fire_Protection
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Energy
05/11/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLLATION OF NEW 10'-0" CURB CUT ALONG QUEENSDALE STREET (LOT #3). ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO NEW CERTIFICATE OF OCCUPANCY TO BE ISSUED UNDER THIS APPLICATION.
S01382386-I1
05/11/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH FUTURE NEW BUILDINGS. THIS FILING INCLUDES 59, 63, & 67 QUEENSDALE STREET. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01382382-I1
05/08/2026
Filed — New Building
APPLICATION IS FILED FOR THE CONSTRUCTION OF (1) NEW DETACHED 2-FAMILY , 2- STORY RESIDENTIAL BUILDING. ALL WORK AS PER PLANS SUBMITTED HEREWITH. DEVELOPMENT WILL CONSIST OF (1) ZONING LOT WITH (3) TAX LOTS.
S01382381-I1
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/22/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/22/2026
Special inspection requirement — Subgrade Inspections
04/22/2026
Special inspection requirement — Wood – Prefabricated I-Joists
04/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/22/2026
Special inspection requirement — Ventilation and air distribution system
04/22/2026
Special inspection requirement — Concrete - Cast-In-Place
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/22/2026
Special inspection requirement — Structural Wood Frame
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/22/2026
Special inspection requirement — Fenestration air leakage
04/22/2026
Special inspection requirement — Air barrier — testing
04/22/2026
Special inspection requirement — Maintenance information
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/22/2026
Special inspection requirement — Air barrier - visual inspection
04/22/2026
Special inspection requirement — Metering
04/22/2026
Special inspection requirement — Insulation placement and R values
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/22/2026
Special inspection requirement — Permanent certificate
04/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/22/2026
Special inspection requirement — Protection of exposed foundation insulation
04/22/2026
Special inspection requirement — Interior lighting power
04/22/2026
Special inspection requirement — Fenestration areas
04/02/2026
Special inspection requirement — Mechanical Systems
04/02/2026
Special inspection requirement — Footing and Foundation
04/02/2026
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedHITECH RENOVATIONS CORP06/09/2026
1 job · most recent 05/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026——Heating and Air Conditioning Systems
Heat / Cool
Rheem ×2
1 job · most recent 05/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/08/2026——Storm, Water/Sanitary
1 job · most recent 05/08/2026
Wood
FiledStatusContractorScope
05/08/2026——Wood
1 job · most recent 05/11/2026
Fence
FiledStatusContractorScope
05/11/2026Permit IssuedHITECH RENOVATIONS CORPFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/22/2026HVAC-R and service water heating equipment—energy_progress
04/22/2026Exterior Insulation and Finish Systems (EIFS)—special
04/22/2026Fire-Resistant Penetrations and Joints—special
04/22/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/22/2026Structural Stability – Alterations of existing buildings—special
04/22/2026Subgrade Inspections—special
04/22/2026Wood – Prefabricated I-Joists—special
04/22/2026Electric vehicle service equipment requirements—energy_progress
04/22/2026Ventilation and air distribution system—energy_progress
04/22/2026Concrete - Cast-In-Place—special
04/22/2026Energy Code Compliance Inspections—progress
04/22/2026Fire-Resistance Rated Construction—progress
04/22/2026Structural Wood Frame—progress
04/22/2026HVAC-R and service water heating system controls—energy_progress
04/22/2026Fenestration air leakage—energy_progress
04/22/2026Air barrier — testing —energy_progress
04/22/2026Maintenance information—energy_progress
04/22/2026HVAC-R and service water piping design and insulation—energy_progress
04/22/2026Air barrier - visual inspection—energy_progress
04/22/2026Metering—energy_progress
04/22/2026Insulation placement and R values—energy_progress
04/22/2026Fenestration and door U-factor and product ratings—energy_progress
04/22/2026Permanent certificate—energy_progress
04/22/2026Duct leakage testing, insulation and design—energy_progress
04/22/2026Protection of exposed foundation insulation—energy_progress
Latest 25 of 30.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026S01382382-I1Request digital key ↗
08/16/2026S01382386-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026S01382382-I1Open ↗
08/16/2026S01382386-I1Open ↗