← Back
STATEN ISLAND
228 ALBEE AVENUE
STATEN ISLAND · BIN 5177467
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 18 docs
Floor 21p · 1 filing · 18 docs
Floor 11p · 1 filing · 18 docs
1 job · most recent 03/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree MULTI18HP230V1C0 10,000 BTU · Heat Pump Outdoor ×1
Rheem ×1
1 job · most recent 03/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/27/2026——Storm, Water/Sanitary
1 job · most recent 03/27/2026
Wood
FiledStatusContractorScope
03/27/2026——Wood
Building Lifecycle
All (46)Filed (2)Objection (14)Special Inspection (30)
06/24/2026
Special inspection requirement — Protection of exposed foundation insulation
06/24/2026
Special inspection requirement — Concrete - Cast-In-Place
06/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/24/2026
Special inspection requirement — Subgrade Inspections
06/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/24/2026
Special inspection requirement — Structural Wood Frame
06/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/24/2026
Special inspection requirement — Interior lighting power
06/24/2026
Special inspection requirement — Lighting controls
06/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/24/2026
Special inspection requirement — Maintenance information
06/24/2026
Special inspection requirement — Metering
04/21/2026
Objection raised — Structural
04/21/2026
Objection raised — Fire_Protection
04/21/2026
Objection raised — Structural
04/21/2026
Objection raised — Fire_Protection
04/21/2026
Objection raised — Other
04/21/2026
Objection raised — Scope
04/21/2026
Objection raised — Structural
04/21/2026
Objection raised — Structural
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Inspections
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Energy
03/27/2026
Filed — New Building
APPLICATION FILED FOR THE CONSTRUCCTION OF SEMI-ATTACHED 2-FAMILY, 3-STORY RESIDENCE ONE (1) ZONING LOT WITH (4) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01352955-S1
03/26/2026
Filed — New Building
APPLICATION FILED FOR THE CONSTRUCCTION OF SEMI-ATTACHED 2-FAMILY, 3-STORY RESIDENCE ONE (1) ZONING LOT WITH (4) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01352955-I1
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/29/2026
Special inspection requirement — Insulation placement and R values
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/29/2026
Special inspection requirement — Air barrier - visual inspection
01/29/2026
Special inspection requirement — Permanent certificate
01/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/29/2026
Special inspection requirement — Final
01/29/2026
Special inspection requirement — Footing and Foundation
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE203/27/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
06/24/2026Protection of exposed foundation insulation—energy_progress
06/24/2026Concrete - Cast-In-Place—special
06/24/2026Excavations - Sheeting, Shoring, and Bracing—special
06/24/2026Exterior Insulation and Finish Systems (EIFS)—special
06/24/2026Fire-Resistant Penetrations and Joints—special
06/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/24/2026Structural Stability – Alterations of existing buildings—special
06/24/2026Subgrade Inspections—special
06/24/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/24/2026Energy Code Compliance Inspections—progress
06/24/2026Fire-Resistance Rated Construction—progress
06/24/2026Structural Wood Frame—progress
06/24/2026Electric vehicle service equipment requirements—energy_progress
06/24/2026Interior lighting power—energy_progress
06/24/2026Lighting controls—energy_progress
06/24/2026Duct leakage testing, insulation and design—energy_progress
06/24/2026Maintenance information—energy_progress
06/24/2026Metering—energy_progress
03/26/2026HVAC-R and service water heating equipment—energy_progress
03/26/2026Energy Code Compliance Inspections—progress
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
03/26/2026HVAC-R and service water heating system controls—energy_progress
02/26/2026Subsurface Investigations (Borings/Test Pits)—special
01/29/2026Insulation placement and R values—energy_progress
01/29/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 37.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01352955-S1Request digital key ↗
08/17/2026S01352955-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026S01352955-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026S01352955-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026S01352955-S1Open ↗
08/17/2026S01352955-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026S01352955-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026S01352955-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026S01352955-I1Open ↗